Une candidature sur mesure pour ce poste — un CV et une lettre de motivation personnalisés qui correspondent à l’offre.
Mane Energy in Paris is seeking an experienced Electrical Engineer to support a major construction project in the data centre sector. The role emphasizes on-site delivery, coordination with BIM teams and subcontractors, and handover activities.
The candidate should have 5-7 years with an electrical contractor, strong on-site engineering experience, and familiarity with IFC docs, Navisworks, BIM coordination, and Primavera P6. Data centre exposure is highly desirable.
Mane Energy in Paris is seeking an experienced Electrical Engineer to support a major construction project in the data centre sector. The role emphasizes on-site delivery, coordination with BIM teams and subcontractors, and handover activities.
The candidate should have 5-7 years with an electrical contractor, strong on-site engineering experience, and familiarity with IFC docs, Navisworks, BIM coordination, and Primavera P6. Data centre exposure is highly desirable.