Don’t send a generic resume — generate a resume and cover letter tailored to this exact role.
Nordic Grid Oy looks for experienced HV Transmission Line Workers / Power Line Installers for on-site projects across Finland and the Nordic region. The role covers assembly and erection of towers, stringing conductors, grounding and related grid works, with emphasis on safety at height.
The position is full-time and on-site, with locations varying by project and possible assignments elsewhere in the Nordic region. English communication is required, and a driving licence is preferred.
Nordic Grid Oy is a Finland-based energy and infrastructure contractor operating across the Nordic and Baltic regions. We provide construction and installation services for power grid, renewable energy and industrial infrastructure projects, including high-voltage transmission lines, substations, solar PV, wind, BESS and fibre-optic infrastructure.
Our team and partners bring hands‑on experience from large-scale energy infrastructure projects, including transmission systems up to 400 kV and renewable energy projects exceeding 250 MW.
We work with EPC contractors, developers, utilities and industrial clients, providing experienced project teams and specialised workforce for projects across Finland and the Nordic region.
Nordic Grid Oy is looking for experienced HV Transmission Line Workers / Power Line Installers for upcoming projects in Finland and across the Nordic region.
The work may include:
This is an on-site, full-time position. Project locations may vary across Finland, with opportunities for assignments elsewhere in the Nordic region.
Powering Nordic Infrastructure.