Head of Data Centre Construction

Linum Consult

Madrid

On-site

EUR 80,000 - 120,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

An international design and build contractor is seeking a Head of Data Centre Construction in Madrid. The role demands a Master’s degree in a relevant field, extensive experience in EPC turnkey projects, and fluency in both Spanish and English. Candidates will manage large-scale data centre projects, ensuring design excellence and client satisfaction, while leading cross-functional teams and maintaining strong client relationships. This position offers the opportunity for significant impact in a growing sector.

Qualifications

  • 10+ years of experience in EPC turnkey construction, specifically in data centre projects.
  • Strong experience in overseeing EPC activities and project management.
  • Established network of contacts in Spain for business development.

Responsibilities

  • Ensure client satisfaction from pre-construction to project completion.
  • Collaborate with multidisciplinary international teams.
  • Direct design activities and optimise technical solutions.
  • Lead change management and serve as main contact for clients.

Skills

Leadership
Project management
Communication
Fluency in Spanish
Fluency in English

Education

Master’s degree in Civil Engineering, Urbanism, Mechanical or Electrical Engineering

Job description

Head of Data Centre Construction – Madrid

Linum Consult’s client is an international design and build main contractor, specialising in the construction of large commercial and industrial facilities for international blue‑chip clients. They are currently seeking a Country Manager from an EPC turnkey construction background to oversee their Data Centre division across Europe, based in Madrid.

Responsibilities
  • Ensuring the performance, design development, and client satisfaction from pre‑construction through to project completion
  • Collaborating closely with multidisciplinary international teams, managing the technical and commercial elements, and playing a pivotal role in maintaining and growing client relationships
  • Directing and coordinating design activities, including optimising technical solutions, controlling project milestones, and supporting technical excellence
  • Acting as the main point of contact for clients, leading change management, and ensuring client satisfaction throughout the project life cycle
  • Leading cross‑functional international design and project teams, ensuring effective collaboration between all stakeholders
  • Partnering with local project teams during the execution phases, maintaining alignment between design intent and construction delivery
Profile
  • Master’s degree qualification in Civil Engineering, Urbanism, Mechanical or Electrical Engineering, or a similar field
  • At least 10 years’ experience within the EPC turnkey construction industry, with a history of working on highly‑technical large data centre projects
  • Strong background of overseeing EPC activities
  • Exposure to M&E project management would be advantageous
  • Strong leadership and communication skills
  • Fluent in spoken and written Spanish and English
  • A history of working for either main contractors or engineering consultancies, with an established network of contacts within Spain to help develop the business
  • The right to live and work in the EU and travel frequently within Europe
Application Process

If you fulfil the minimum requirements stipulated by our client and are confidentially interested in applying, then please drop Linum Consult a line with a copy of your CV and contact details to europe@linumconsult.com for the attention of Neill Donald.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Head of Data Centre Construction – Europe (Madrid)
Head of Data Centre Construction – Europe (Madrid)

Linum Consult • Madrid

On-site
EUR 80,000 - 120,000
Associate Electrical Engineer - Data Center
Associate Electrical Engineer - Data Center

Eligo Recruitment • Madrid

On-site
EUR 42,000 - 56,000
Electrical Design Engineer
Electrical Design Engineer

Uneek Global Limited • Madrid

On-site
EUR 51,000 - 69,000
Associate Electrical Engineer - Data Centre Design Lead
Associate Electrical Engineer - Data Centre Design Lead

Eligo Recruitment • Madrid

On-site
EUR 42,000 - 56,000
Senior Electrical Design Engineer (Data Centres) - Madrid
Senior Electrical Design Engineer (Data Centres) - Madrid

ENGIE Group • Madrid

Hybrid
EUR 70,000 - 95,000
Construction Manager
Construction Manager

Cap Ingelec • Madrid

On-site
EUR 70,000 - 90,000
Construction Manager - Industrial Buildings & Datacenter
Construction Manager - Industrial Buildings & Datacenter

Cap Ingelec • Barcelona

On-site
EUR 90,000 - 120,000
Senior Mechanical Design Engineer (Data Centres) - Madrid, Spain
Senior Mechanical Design Engineer (Data Centres) - Madrid, Spain

ENGIE Group • Madrid

Hybrid
EUR 50,000 - 70,000
Hybrid Working
Pension scheme
Healthcare
+7
Senior Project Manager - Data Centre Development
Senior Project Manager - Data Centre Development

Mace • Madrid

Hybrid
EUR 90,000 - 120,000
Senior Project Manager - Data Centre
Senior Project Manager - Data Centre

Mace • Madrid

Hybrid
EUR 90,000 - 130,000