Erhalte mehr Antworten von Arbeitgebern
Versende in nur wenigen Minuten einen passgenauen Lebenslauf.
Nebius B.V. is seeking a Senior Construction Project Manager to lead the buildout and readiness of data center facilities. You will oversee construction from design review through commissioning and handover, ensuring regulatory compliance and performance targets are met.
You will collaborate with architects, contractors, and regulators, manage budgets and schedules, and drive operational excellence across sites with travel between data centers.
The role— We are seeking a detail-oriented and experienced Senior Construction Project Manager to lead the buildout and operational readiness of our cutting‑edge data centers. In this role, you will oversee construction from design review through commissioning and handover, ensuring compliance with regulatory standards and performance expectations. You'll collaborate closely with architects, contractors, and regulatory authorities while managing budgets, timelines, and vendor relationships. This position requires deep knowledge of data center infrastructure, exceptional project management skills, and a proactive mindset to drive operational excellence from the ground up. This remote position will require travel between Data Centers.
Oversee all phases of data center construction, from design review to commissioning and handover. Collaborate with architects, MEP consultants, contractors, and vendors to ensure project specifications and timelines are met. Review design drawings and technical submittals for compliance with company standards and operational requirements. Manage change control, progress tracking, and budget adherence throughout the project lifecycle. Participate in Factory Acceptance Tests (FAT) and Site Acceptance Tests (SAT) for key systems such as UPS, chillers, generators, and switchgear.
Serve as the primary liaison with local authorities, utilities, and regulatory bodies. Ensure all permits, licenses, and inspections (e.g., building, fire, electrical, environmental) are completed on schedule. Maintain compliance with local codes, safety standards, and data center industry best practices (e.g., ISO, Uptime Institute, TIA-942). Manage documentation and reporting for occupancy certification and operational approvals.
Lead commissioning activities, ensuring all systems (electrical, mechanical, BMS, security, etc.) are fully tested and validated. Develop and implement standard operating procedures (SOPs) and emergency operating procedures (EOPs) for facility systems. Train operations teams on site-specific systems, monitoring tools, and safety practices. Ensure smooth transition from construction to operations with full documentation and warranty records.
After commissioning, oversee daily facility operations, preventive maintenance, and vendor management. Monitor and optimize Power Usage Effectiveness (PUE) and energy efficiency. Implement sustainability and reliability improvements, including capacity planning and infrastructure upgrades. Ensure adherence to health, safety, and environmental (HSE) standards across all facility operations.