Erhalte mehr Antworten von Arbeitgebern
Versende in nur wenigen Minuten einen passgenauen Lebenslauf.
Energy Resilience Partners, LLC (ERP) is building the contingent team for the Storck Barracks Smart Microgrid in Bavaria, Germany. The Principal Engineer provides independent technical authority for microgrid sequence, grid-forming operation, controls acceptance and integrated performance evidence.
The role coordinates PV, BESS, generation, fuel, protection, SCADA, cybersecurity, and interfaces with OEMs and safety teams, ensuring successful energy-system turnover and commissioning.
ANMG-CX-002 | Storck Barracks Microgrid | Contingent opportunity
WORK LOCATION: HYBRID TO EXTENDED ONSITE during startup, testing and acceptance. Duty location: Remote engineering plus Storck Barracks and supplier/FAT locations. Minimum Germany presence: Remote design/FAT; onsite integration, SAT, and acceptance
REQUISITION ANMG-CX-002
CSS CAM LCAT 660 - Principal Engineer / IT Investigator (provisional)
DUTY LOCATION Remote engineering plus Storck Barracks and supplier/FAT locations
WORK ARRANGEMENT HYBRID TO EXTENDED ONSITE during startup, testing and acceptance
REPORTS TO ERP Project Manager / designated functional lead
EMPLOYMENT PROJECT HIRE, PARTNER ASSIGNMENT OR PHASE SPECIALIST
REQUIREMENT BASIS TECHNICAL / COMPLIANCE REQUIRED: Function required by technical, cybersecurity, design, testing, commissioning or turnover obligations; exact billet is ERP's execution method.
Energy Resilience Partners, LLC (ERP) is a tribally led federal energy-resilience contractor building the contingent team for the USAG Ansbach - Storck Barracks Smart Microgrid in Bavaria, Germany. The 730-day project integrates two 1 MW diesel generators, 2 MW / 4 MWh battery energy storage, photovoltaic generation, 20 kV medium-voltage distribution, fuel systems, protection, SCADA/microgrid controls, fiber communications, an underground interconnection corridor and full testing, training and commissioning.
Provides independent technical authority for microgrid sequence, grid-forming operation, controls acceptance, and integrated performance evidence.
PE/CxA/CCP/NETA/OEM credentials; microgrid, grid-forming BESS, black-start, SCADA, or relay experience.
Equal opportunity statement: ERP and each approved employing entity make employment decisions without unlawful discrimination. Any tribal, veteran or other preference will be used only when legally authorized and expressly approved for the employing entity and posting.