Project Scheduler, Pipeline

Sccsinternational

Edmonton

On-site

CAD 70,000 - 110,000

Full time

4 days ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Ledcor is recruiting a pipeline scheduler in Edmonton, requisition R30953, to develop, maintain and control the programmes for large linear pipeline projects in TILOS and Primavera P6 from early planning through to completion.

Time location charts illustrate spread movement, production rates, work fronts and constraints, with project controls coordinating with managers and field leadership; baselines are maintained and progress tracked through weather, access, and scope changes.

Job description

Ledcor is recruiting a pipeline scheduler at Edmonton, requisition R30953, to develop, maintain and control the programmes for large linear pipeline projects in TILOS and Primavera P6 from early planning through to completion. The posting is specific about what a pipeline programme has to show.

Time location charts are built to illustrate spread movement, production rates, work fronts, crew flow and geographic constraint, and construction logic and sequencing are settled with project and construction managers, superintendents, engineers, field leadership and project controls. Engineering, procurement, access, environmental, construction, testing, commissioning and restoration activities are integrated into one programme rather than tracked apart.

Field progress is tracked and fed back into both tools to reflect quantities, productivity, constraint and forecast completion. The scheduler identifies critical path activities, programme risk, crew conflict, access limitation and potential delay, and recommends mitigation and recovery.

The time location plan is kept aligned with the P6 master programme on logic, milestones, progress and forecast, and look ahead programmes, production curves, progress reports and schedule narratives are produced. Baselines are maintained and the effect of scope change, weather, access restriction, environmental windows and field delay is evaluated against them, which is the record a later claim would rest on.

Work is self performed, so the advert offers visibility of construction logic and field progress across the spreads. The post is full time. No salary and no closing date are published.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Project Scheduler, Industrial
Project Scheduler, Industrial

Sccsinternational • Edmonton

Hybrid
CAD 90,000 - 140,000
Project Scheduler, Pipeline
Project Scheduler, Pipeline

Ledcor Group • Edmonton

On-site
CAD 85,000 - 120,000
Senior Scheduler, Pipelines
Senior Scheduler, Pipelines

Surerus Murphy Joint Venture • Calgary

On-site
CAD 85,000 - 125,000
Project Scheduler, Pipeline
Project Scheduler, Pipeline

Ledcor • Edmonton

On-site
CAD 90,000 - 130,000
Project Scheduler, Industrial
Project Scheduler, Industrial

Ledcor • Edmonton

On-site
CAD 90,000 - 120,000
Scheduler / Planner
Scheduler / Planner

Agilus Consulting Group • Calgary

On-site
CAD 85,000 - 121,000
Planning Engineer
Planning Engineer

Indotronix Avani Group • Alberta

On-site
CAD 90,000 - 120,000
Senior Planner and Scheduler, Heavy Civil
Senior Planner and Scheduler, Heavy Civil

Sccsinternational • Fort Saskatchewan

Hybrid
CAD 90,000 - 130,000
Schedular
Schedular

Primoris Services Corporation • Edmonton

On-site
CAD 90,000 - 120,000
Schedular
Schedular

Primoris Fabrication LP (Canada) • Edmonton

On-site
CAD 90,000 - 120,000