Subsea CSR

Faz parte dos primeiros candidatos.
Brunel GmbH
Região Geográfica Intermediária de Cascavel
BRL 20.000 - 80.000
Faz parte dos primeiros candidatos.
Há 2 dias
Descrição da oferta de emprego

Job Responsibilities:

  1. To adopt and demonstrate exemplary behavior with regard to HSSE and to implement HSSE rules and requirements within his area of responsibility.
  2. To liaise and coordinate with other interface engineers, all discipline engineers involved in the management of the NFL project, and with contractor personnel handling technical design and interfaces. The job holder shall also make sure that non-contractual obligations are properly addressed by the EPC contractor.
  3. To organize and/or attend technical, marine, and construction interface meetings as necessary.
  4. To ensure consistency and correct design compliance both under the area of responsibility and with other areas during the various phases of EPC detailed design, procurement, fabrication, installation, and animate dedicated transverse technical, schedule, and cost coordination between packages as required to ensure all requirements for EPC activities are complied with.
  5. To ensure timely review of documentation by COMPANY interfaces to identify clashes/conflicts.
  6. To plan for phase 2 technology (onshore control room, etc.) to combine with the other project elements.
  7. To follow up during FEED and EPCIC phases the progress of studies with HSEQ to ensure issuance of Consent To Construct certificate in due time to allow installation of the onshore cable.
  8. To advise on technical interfaces with other interfacing parties during end of FEED and EPCIC phases.
  9. To attend all interface-related meetings, including in particular interface workshops, HAZID / HAZOP meetings, meetings with Contractor(s), etc., in order to ensure the permanent control of the battery limits.
  10. To organize, control, and follow up the process to have all deliverables timely issued by contractors for all interfaces, and to control the quality of these deliverables during FEED and EPCIC phases.
  11. To ensure that EPCIC Contractors provide proper reporting of the progress of their interface activities and ensure subsequently report on progress of interface management process implementation to Project Manager and refer to him in the event of any deviation or conflict with proposed remedial actions.
  12. To avoid change orders and delays caused by interface issues by ensuring timely follow-up of interfaces during FEED and EPCIC phases.
  13. To anticipate problems and work together with Contractor(s), Engineering Manager, and as a general manner with all discipline Engineers, to propose technical solutions.
  14. To liaise with other departments like Drilling & Wells, Reservoir & Geosciences, and Field Operations for the management of interface up to their close-out.
  15. To liaise with project team and discipline engineers on all interface matters and/or help expedite the development of the design process between Contractors during FEED and EPCIC execution phase.
  16. To liaise with the Document Control team to assist consolidation of the technical review records for all project packages.
  17. When necessary, participate in monitoring interfaces between different subcontractors of a main EPCIC contractor.
  18. To resolve and chase Technical Queries and Derogations Requests in liaison with discipline engineers and COMPANY Technical Reference Persons.
  19. To timely report to the NFL package Lead, highlighting progress and areas of concern encountered in the performance of his duties.
  20. To ensure confidentiality of all the documentation produced (whatever its support).
  21. To ensure technical coordination between packages and in close coordination with Package Manager and Engineers.
  22. To ensure/close follow-up of COR/TQ/SCN and the like during project execution.
  23. To ensure readiness for all internal/external audits required (PR, Third parties, Partners).
  24. To promote alternative solutions to reduce and optimize the duration for offshore installation.
  25. To ensure close coordination within the team on all engineering, constructability, and operational matters.
  26. To set up and manage daily meetings with Subsea construction and T&I sub-Contractor(s), and call specific ad hoc meetings as required.
  27. To participate in follow-up on the Project progress and risk reporting.
  28. To issue timely replies to various correspondences and issue correspondences on company concerns as required.
  29. To manage close-out of all the stages of Subsea construction and T&I activities from CFT till completion of the works, including settlement of any claims, transfer and archiving of final documentation, and issuance of close-out reports.
  30. To carry out any other duty or task that may be assigned by hierarchical superiors.
Obtém a tua avaliação gratuita e confidencial do currículo.
Seleciona o ficheiro ou arrasta e larga-o
Avatar
Coaching online gratuito
Melhora as tuas possibilidades de receberes um convite para entrevista!
Torna-te numa das primeiras pessoas a explorar as novas ofertas de Subsea CSR em Região Geográfica Intermediária de Cascavel