Electrical Field Engineer — Data Center Construction Innovator

Giga Energy

On

Sur place

EUR 77 000 - 112 000

Plein temps

Il y a 11 jours
Générateur de candidature

Transformez ce poste en entretien — un CV et une lettre de motivation conçus selon ce que cet employeur recherche.

Passez les filtres ATS

Avantages offerts par ce poste

Subsidized health, dental, and vision
401(k) with 4% employer match
Unlimited PTO
Parental leave
FSAs/HSA

Résumé du poste

Giga Energy seeks an Electrical Field Engineer to keep electrical construction moving on active data center sites. You’ll write and resolve RFIs, manage change orders, and coordinate with the design team, subcontractors, and the Electrical Superintendent to ensure the project stays on track.

Requirements include a Bachelor's degree in Electrical Engineering or related field and 3+ years on electrical construction projects; knowledge of MV/HV, switchgear, UPS, and ability to read single-line

Qualifications

  • Bachelor's degree in Electrical Engineering or related field.
  • 3+ years on electrical construction projects.
  • Ability to read single-line diagrams, P&IDs, and specs.

Responsabilités

  • Identify, write, and track RFIs for electrical scope, ensuring clear documentation of the issue, impact, and requested resolution.
  • Follow up with design teams and engineers of record to drive RFIs to timely closure, escalating stalled items.
  • Review electrical drawings, specifications, and single-line diagrams to spot discrepancies before they become field problems.
  • Identify potential change order conditions in the field and document them accurately and promptly.
  • Prepare change order requests, including scope description, backup documentation, and cost/schedule impact.
  • Coordinate with project controls, PMs, and subcontractors to price, negotiate, and resolve change orders.
  • Maintain a change order and RFI log, and report status regularly to the Electrical Superintendent and Project Director.
  • Assist with material takeoffs and procurement follow-up tied to approved change orders.

Connaissances

RFI management
Change orders
Electrical systems
Reading schematics

Formation

Bachelor's degree in Electrical Engineering
Construction management knowledge

Outils

Procore
PlanGrid
Bluebeam

Description du poste

Giga Energy seeks an Electrical Field Engineer to keep electrical construction moving on active data center sites. You’ll write and resolve RFIs, manage change orders, and coordinate with the design team, subcontractors, and the Electrical Superintendent to ensure the project stays on track.

Requirements include a Bachelor's degree in Electrical Engineering or related field and 3+ years on electrical construction projects; knowledge of MV/HV, switchgear, UPS, and ability to read single-line

Obtenez votre examen gratuit et confidentiel de votre CV.
ou faites glisser et déposez votre fichier ici.
Similar jobs

Postes similaires à comparer

On-Site Mechanical Field Engineer — Data Center Builds
On-Site Mechanical Field Engineer — Data Center Builds

Giga Energy • Wallonië

Sur place
EUR 60 000 - 90 000
Subsidized health insurance
401(k) with 4% employer match
Unlimited PTO
+1
Lead MEP Superintendent for Fast Data Center Builds Equity
Lead MEP Superintendent for Fast Data Center Builds Equity

Giga Energy • On

Sur place
EUR 95 000 - 147 000
Subsidized health, dental, and vision
Equity (options)
401(k) with 4% employer match
+5
Mechanical Field Engineer
Mechanical Field Engineer

Giga Energy • Wallonië

Sur place
EUR 60 000 - 90 000
Subsidized health insurance
401(k) with 4% employer match
Unlimited PTO
+1
Electrical Engineer
Electrical Engineer

Mane Contract Services • Henegouwen

Sur place
EUR 68 000 - 83 000
MEP Superintendent
MEP Superintendent

Giga Energy • On

Sur place
EUR 95 000 - 147 000
Subsidized health, dental, and vision
Equity (options)
401(k) with 4% employer match
+5
Contract Electrical Project Engineer — Lead Installations
Contract Electrical Project Engineer — Lead Installations

Jobat • Belgique

Sur place
EUR 60 000 - 90 000
Electrical Commissioning Supervisor
Electrical Commissioning Supervisor

Sitec Quality Group • Antwerpen

Sur place
EUR 60 000 - 90 000
LV Electrical Design Engineer — AutoCAD & Field Design
LV Electrical Design Engineer — AutoCAD & Field Design

ENGIBEX • Brussel

Sur place
EUR 42 000 - 56 000
Ingénieur Projets Sénior Électricité F/H – Data Centers
Ingénieur Projets Sénior Électricité F/H – Data Centers

TechNord • Henegouwen

Sur place
EUR 60 000 - 80 000
Electrical Designer
Electrical Designer

Pauwels Consulting • Antwerpen

Sur place
EUR 55 000 - 85 000
BA4 certification
VCA certification