Get a reply from this employer
Your resume and cover letter, tailored to exactly what they’re hiring for.
GE Vernova, Inc. is seeking a qualified Electrician to maintain and troubleshoot wind turbines at the Bango Wind Farm in NSW. You’ll perform scheduled and unscheduled maintenance, climb turbines, and work across site infrastructure while adhering to safety standards.
The role requires fault finding, use of GE manuals, and strong English communication. You’ll operate within a 37.5-hour week with overtime and on-call rosters; relocation assistance is available for suitable candidates.
Are you ready to elevate your career in renewable energy? Bango Wind Farm, located on Ngunnawal Country, 14km south of Boorowa and 30km north of Yass. The third largest operational wind farm in NSW. The 244MW wind farm became fully operational in 2023, featuring 46 GE Cypress Turbines, that produce enough electricity to power 144,000 homes and prevent 543,000 tonnes of carbon emissions annually!
You’ll be working at the forefront of renewable energy, maintaining and troubleshooting wind turbines at some of the most exciting and innovative sites in the country. No two days are the same, you’ll be climbing turbines, solving real-world technical challenges, and helping to keep Australia’s wind power turning.
Essential Responsibilities
Qualifications, Requirements & Competencies
As GE Vernova is a global organization, working across different time zones, and monitoring, reading and responding to contact outside normal working hours can be expected.
Relocation Assistance Provided: Yes