A complete application in a minute — tailored resume and cover letter, ready to send.
GE Vernova, Inc. is seeking a Field Service Technician for Boco Rock Wind Farm, located near Nimmitabel NSW. You will maintain and troubleshoot GE turbines, climbing towers and performing HV switching as required.
Training will be provided, and you must be based locally. This role offers a 37.5-hour week with overtime and on-call rotation. You’ll work with clear safety standards, participate in maintenance campaigns, and travel to other sites as needed.
Are you ready to elevate your career in renewable energy? Boco Rock Wind Farm, located 10km south west of Nimmitabel and 30km north of Bombala in NSW, is looking for a Field Service Technician to join the team. With 67 GE 1.7-100 turbines, operating since 2015 and generating up to 113MW of clean energy!
You’ll be working at the forefront of renewable energy, maintaining and troubleshooting wind turbines at some of the most exciting and innovative sites in the country. No two days are the same, you’ll be climbing turbines, solving real-world technical challenges, and helping to keep Australia’s wind power turning. Wind Turbine specific training will be provided to the successful applicants.
This is not a FIFO or DIDO role, must be based locally to the wind farm.
Essential Responsibilities:
Qualifications, Requirements & Competencies:
Desired Characteristics:
As GE Vernova is a global organization, working across different time zones, and monitoring, reading and responding to contact outside normal working hours can be expected.
Relocation Assistance Provided: No