A complete application in a minute
Tailored resume and cover letter, ready to send.
Cobra Asia Pacific Pty Ltd is seeking a Site Administrator to support the Central-West Orana Energy Hub projects in NSW. The role is based on site at Merotherie, Elong Elong or Mudgee and focuses on safety administration and cost control support for the management team.
You will coordinate with Production, Finance & Commercial teams, process costs, manage dockets and ensure timely payment to suppliers. A current driver license and access to a vehicle or shuttle from Mudgee are provided.
An 80-year group, COBRA promotes its own efficient business model, the result of the combination of decentralization, geographical diversification and technical specialization of more than 20,000 professionals in more than 43 countries. In this way, it offers a wide range of services throughout the value chain of projects, adapted to each sector and to the scope of the contract required by our clients, both public and private. Cobra is divided into four main sectors of activity, Networks, Specialised installations, integrated projects and concession assets.
ACEREZ, a partnership of ACCIONA, COBRA and Endeavour Energy, has been appointed network operator by Energy Co to design, build, finance, operate and maintain the Central-West Orana Renewable Energy Zone (REZ) transmission network. The ACCIONA COBRA Joint Venture (ACJV), the design and construct (D&C) consortium, will design and build the Central-West Orana REZ transmission project.
The Central-West Orana Renewable Energy Zone (REZ) Transmission Project will build new high-capacity transmission lines, energy hubs and supporting infrastructure to transfer power generated by solar and wind projects to electricity consumers. The new infrastructure is expected to be operational by 2028 and will initially unlock up to 4.5 gigawatts of new network capacity.
The project consists of 90km of 500kV overhead transmission lines and 150 km of 330kV transmission lines for generator connections, stretching from Elong Elong in the west through to Barigan Creek in the east, via an energy hub at Merotherie.
The Central-West Orana project is currently seeking dedicatedSite Administrator to share their expertise within our growing Energy Hubs Team.
Please note:This position is being delivered as part of a joint venture between two organisations. As such, your employment may be with either of the parent companies, and this will be confirmed during the recruitment process.
We welcome applicants of all backgrounds, identities, and experiences. If you believe you bring the capabilities to succeed in this role, we’d love to hear from you. We look forward to continuing to build our supportive workplace together.