A complete application in a minute — tailored resume and cover letter, ready to send.
ACCIONA Construction Australia is seeking a Linesperson (B6) to install, maintain and repair overhead and underground power networks across NSW transmission projects. You will work on structures up to 500kV, climb poles or towers, and operate associated equipment while upholding a strong safety record.
The role requires AQF certificates in ESI Transmission or equivalent experience, a White Card, a NSW Driver’s Licence, and a National Police Clearance.
ACCIONA is a global company, leading in the development of regenerative infrastructure that creates a positive impact on society. Our workforce consists of more than 65,000 professionals, present in more than 40 countries across the five continents, all contributing to our mission to design a better planet. Are you a passionate individual who wants to make a difference, promote sustainable development, and find solutions to the biggest global challenges, including climate change, overpopulation, and water scarcity? Come and join us in building the infrastructure our planet needs to achieve a sustainable future.
Acciona Construction Australia Pty Ltd is part of a consortium including Cobra and Endeavour Energy that have entered a commitment deed with EnergyCo as preferred network operator for the Central-West Orana Renewable Energy Zone (REZ). This will be serviced by new transmission network infrastructure, including transmission lines and energy hubs, which will transfer power generated by solar and wind farms to electricity consumers.
Acciona Construction Australia Pty Ltd and Genus Infrastructure (NSW) Pty Ltd have been engaged by Transgrid to deliver the eastern portion of the HumeLink project. HumeLink East involves the expansion of the existing Bannaby 500 kV substation, along with the design and construction of a new 500 kV double circuit transmission line. This new transmission line will connect the Bannaby 500 kV substation at the Wondalga interface point with HumeLink West.
The Linesperson (B6) is responsible for skilled installation, repair and maintenance of overhead and underground power networks in accordance with project and team goals. This role requires technical capability, a strong safety record, and the ability to work across a variety of structure types and voltages, including up to 500kV.
Rosters will vary depending on project requirements. Candidates should be willing to work on swing-style roster arrangements that may include extended periods on site followed by periods of leave.