Wind Turbine Millwright – Swift Plains Project

Mortenson

Nazareth (TX)

Sur place

USD 32 000 - 47 000

Plein temps

Il y a 4 jours
Soyez parmi les premiers à postuler

Obtenez une réponse de cet employeur

Votre CV et votre lettre de motivation, adaptés exactement à ce que l’employeur recherche.

Passez les filtres ATS

Avantages offerts par ce poste

Medical plans
Dental plan
401k match
Paid time off
Life insurance
Mental health resources
Tuition reimbursement
Adoption assistance
Gym discount

Résumé du poste

Mortenson in Nazareth, TX is seeking a skilled millwright for dismantling, erecting, assembling, aligning, adjusting, and maintaining machinery per installation manuals, layouts, and drawings on the Swift Plains Wind Project. You will offload major components, set bases, install turbine subsystems, and assist with crane work while adhering to safety regulations and collaborating with diverse teams.

This role requires a high school diploma, one year of related experience, a valid driver's

Qualifications

  • High school diploma or GED.
  • One year of related experience preferred.
  • Current driver's license.
  • Ability to read and interpret safety regulations, assembly/disassembly, operation and maintenance instructions; strong teamwork orientation with good customer service skills.

Responsabilités

  • Receive and offload major components.
  • Install loose components for nacelle, hub, and tower preparation.
  • Connect blades to hub.
  • Set base and tower sections.
  • Handle taglines.
  • Assist with main erection crane assembly and teardown.
  • Climb ladders (average 80m).
  • Drill and/or tap holes on turbines, generators, compressors, and pumps.
  • Torque/tension bolted connections.
  • Build relationships with diverse backgrounds and organizational levels.

Connaissances

Teamwork
Communication
Attention to detail
Physical stamina
Safety compliance

Formation

High school diploma or GED

Description du poste

Mortenson in Nazareth, TX is seeking a skilled millwright for dismantling, erecting, assembling, aligning, adjusting, and maintaining machinery per installation manuals, layouts, and drawings on the Swift Plains Wind Project. You will offload major components, set bases, install turbine subsystems, and assist with crane work while adhering to safety regulations and collaborating with diverse teams.

This role requires a high school diploma, one year of related experience, a valid driver's

Obtenez votre examen gratuit et confidentiel de votre CV.

ou faites glisser et déposez votre fichier ici.

Similar jobs

Postes similaires à comparer

Wind Turbine Millwright - Onsite Erection & Maintenance
Wind Turbine Millwright - Onsite Erection & Maintenance

Mortenson • Seymour (TX)

Sur place
USD 50 000 - 85 000
Medical & Rx
Dental
401k
+6
Wind Turbine Millwright — Four Horizons Project (TX)
Wind Turbine Millwright — Four Horizons Project (TX)

Mortenson • Seymour (TX)

Sur place
USD 55 000 - 75 000
Medical + Vision
Dental Plan
401k Match
+6
Wind Millwright - Swift Plains Wind Project
Wind Millwright - Swift Plains Wind Project

Mortenson • Nazareth (TX)

Sur place
USD 32 000 - 47 000
Medical plans
Dental plan
401k match
+6
Wind Farm Construction Laborer
Wind Farm Construction Laborer

Mortenson • Nazareth (TX)

Sur place
USD 38 000 - 52 000
Medical & Vision
Dental
401k Retirement Plan
+6
Wind Farm Heavy Equipment Operator
Wind Farm Heavy Equipment Operator

Mortenson • Nazareth (TX)

Sur place
USD 25 000 - 44 000
Medical and prescription drug plans
Dental plan
401k retirement plan with generousMort
+6
Wind Millwright - Four Horizons Wind Project
Wind Millwright - Four Horizons Wind Project

Mortenson Construction • Seymour (TX)

Sur place
USD 55 000 - 75 000
Medical + Vision
Dental Plan
401k Match
+6
Wind Millwright - Four Horizons Wind Project
Wind Millwright - Four Horizons Wind Project

Mortenson • Seymour (TX)

Sur place
USD 50 000 - 85 000
Medical & Rx
Dental
401k
+6
Wind Millwright - Carpenter Wind Project
Wind Millwright - Carpenter Wind Project

Mortenson • Remington (IN)

Sur place
USD 40 000 - 55 000
Wind Millwright - Wellsburg Repower Wind Project
Wind Millwright - Wellsburg Repower Wind Project

Mortenson • Wellsburg (IA)

Sur place
USD 27 552 - 34 440
Wind Turbine Assembly Technician
Wind Turbine Assembly Technician

Wanzek Construction, Inc. • Claude (TX)

Sur place
USD 33 000 - 37 000
401(k) with company match
Employee Stock Purchase Plan
Flexible spending account