Don’t send a generic resume — generate a resume and cover letter tailored to this exact role.
Walbec Group in Madison, WI is seeking a Utility Pipe Layer to install, align and inspect underground utilities including water mains, sewer lines and storm drains. You will prepare trenches, lay pipe to grade and ensure connections meet project specs.
Lifting up to 75 pounds and variable hours are required. Responsibilities include assisting with machine maintenance, site clean-up and other duties as assigned by the Foreman.
Walbec produces high-quality construction materials and delivers unparalleled professional design, engineering and construction services at its six companies, including Payne and Dolan, Northeast Asphalt, Zenith Tech, Parisi, Premier Concrete, and Construction Resources Management. Whether building bridges, stabilizing shorelines, rehabilitating structures, or providing site engineering and construction solutions for solar , Walbec is your bridge to expertise in construction and engineering.
The Utility Pipe Layer is responsible for installing, aligning, and inspecting underground utilities such as water mains, sewer lines, storm drains, and other piping systems. This role involves working as part of a construction crew to prepare trenches, lay pipe to grade, and ensure proper connections that meet safety and project specifications. Must be able to lift 75 pounds . The pipelayer will also assist with keeping machines and equipment maintained, assist in clean-up of job site, and other duties assigned by the Foreman or other management.
We are an Equal Employment Opportunity (EEO) and affirmative-action employer, and it is our practice to provide equal employment opportunities to all qualified applicants. In addition, it is the policy of the Company to comply with applicable federal, state and local laws governing nondiscrimination in employment in each locality in which the Company has employees. Women and minorities are encouraged to apply!