Traveling MEP QA/QC - Data Center Construction

CyberCoders, Inc.

Nashville (TN)

On-site

USD 90,000 - 130,000

Full time

14 days+
Application generator

Get a reply from this recruiter — a resume and cover letter tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Employee Stock Ownership Plan
Discretionary annual bonus
401k with employer match
Medical, dental, and vision insurance
Flexible Time Off Policy
9 paid company holidays

Job summary

Willmeng seeks an experienced Traveling MEP QA/QC professional for data center construction. You will ensure quality, code compliance and reliable performance of MEP systems across projects, inspecting installations, witnessing testing and enforcing QA/QC processes.

You will document non-conformances, coordinate with field teams, contractors and design teams to meet owner requirements and industry standards, with travel to multiple sites as needed.

Qualifications

  • Bachelor's degree or equivalent experience in a mechanical, electrical, construction management, or related engineering field.
  • 5+ years of hands-on MEP QA/QC experience on commercial or mission-critical projects; data center construction preferred.
  • Strong knowledge of MEP systems (UPS, switchgear, PDUs, generators, CRAH/CRAC, chilled water, piping, fire suppression and monitoring).
  • Familiarity with NEC, NFPA, ASHRAE, TIA-942, and Uptime Institute criteria.
  • Experience witnessing FAT/SAT and supporting commissioning activities; able to interpret test results and specify corrective actions.
  • Proficient documentation skills with NCRs, inspection reports, test records, and QA/QC plan development.
  • Proficiency with construction and QC tools/software (Bluebeam, Revit/AutoCAD basics, Procore, BIM 360).

Responsibilities

  • Conduct regular site inspections of MEP installations to verify conformity with contract documents and standards.
  • Develop, implement and maintain QA/QC plans, checklists, and ITPs for MEP scopes.
  • Witness FAT, SAT, commissioning activities and functional testing of critical systems.
  • Prepare inspection reports, NCRs, punch lists and corrective action plans; track resolutions.
  • Review submittals and drawings for compliance and coordinate with design and procurement teams.
  • Coordinate with contractors, commissioning agents, owners and design engineers to resolve technical issues.
  • Verify installation tolerances, clearances, labeling, grounding, and documentation.
  • Ensure compliance with codes and standards (NEC, NFPA, ASHRAE, TIA-942, Uptime).
  • Train and mentor field quality personnel on QA/QC procedures and corrective actions.
  • Record observations and generate reports using project management and QC software.

Skills

MEP QA/QC
Inspection
FAT/SAT
Documentation
QA/QC plans
Project coordination
Bluebeam
Revit/AutoCAD basics
Procore
BIM 360

Education

Bachelor's degree in Mechanical, Electrical, Construction Management or related engineering

Tools

Bluebeam
Revit
AutoCAD
Procore
BIM 360

Job description

Traveling MEP QA/QC - Data Center Construction
Position Overview

Experienced MEP QA/QC professional responsible for ensuring the quality, code compliance and reliable performance of mechanical, electrical and plumbing systems across data center construction projects. This traveling role inspects installations, witnesses testing and commissioning activities, enforces QA/QC processes, documents non-conformances, and works with field teams, contractors and design teams to deliver projects that meet owner requirements and industry standards.

Key Responsibilities
  • Conduct regular site inspections of MEP installations (power distribution, UPS, generators, cooling systems, piped systems, fire protection, etc.) to verify conformity with contract documents, shop drawings and industry standards.
  • Develop, implement and maintain project-specific QA/QC plans, checklists, and inspection test plans (ITPs) for MEP scopes.
  • Witness and document factory acceptance tests (FAT), site acceptance tests (SAT), commissioning activities and functional performance testing of critical systems.
  • Prepare clear, timely inspection reports, non-conformance reports (NCRs), punch lists and corrective action plans; track resolution through to closeout.
  • Review submittals, shop drawings and equipment data for compliance with specifications and design intent; coordinate comments with design and procurement teams.
  • Coordinate with contractors, commissioning agents, owners and design engineers to resolve technical issues, clarify scope and ensure quality outcomes.
  • Verify installation tolerances, clearances, labeling, grounding, tiered redundancy paths, and required documentation (as-built drawings, test reports, certificates).
  • Ensure compliance with applicable codes and standards (NEC, NFPA, ASHRAE, TIA-942, Uptime Institute guidelines, manufacturer requirements).
  • Train and mentor field quality personnel and subcontractors on QA/QC procedures, inspection techniques and corrective action processes.
  • Use project management and QC software to record observations, generate reports, maintain traceability of issues and support closeout documentation.
Qualifications
  • Bachelor's degree in Mechanical, Electrical, Construction Management or related engineering discipline, or equivalent experience.
  • 5+ years of hands-on MEP QA/QC experience on commercial or mission-critical projects; data center construction experience strongly preferred.
  • Proven knowledge of MEP systems used in data centers (UPS, switchgear, PDUs, generators, CRAH/CRAC, chilled water, piping, fire suppression and monitoring systems).
  • Familiarity with relevant codes and standards including NEC, NFPA (70/75/110/13), ASHRAE guidance, TIA-942 and Uptime Institute criteria.
  • Experience witnessing FAT/SAT and supporting commissioning activities; ability to interpret test results and specify corrective actions.
  • Strong documentation skills and experience with NCRs, inspection reports, test records and QA/QC plan development.
  • Proficiency with construction and QC tools/software (Bluebeam, Revit/AutoCAD basics, Procore, BIM 360 or similar).
Benefits
  • Employee Stock Ownership Plan
  • Discretionary annual bonus
  • 401k with employer match
  • Employee medical, dental, and vision insurance 100% covered, with options to add dependents at 50% coverage by Willmeng
  • Flexible Time Off Policy
  • 9 paid company holidays
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Traveling MEP QA/QC Specialist for Data Center Construction
Traveling MEP QA/QC Specialist for Data Center Construction

CyberCoders, Inc. • Nashville (TN)

On-site
USD 90,000 - 130,000
Employee Stock Ownership Plan
Discretionary annual bonus
401k with employer match
+3
QAQC Manager
QAQC Manager

Pogue Construction • Grand Saline (TX)

On-site
USD 90,000 - 140,000
QAQC Manager
QAQC Manager

Pogue Construction • Tyler (TX)

On-site
USD 110,000 - 170,000
QAQC Manager
QAQC Manager

Pogue Construction • Terrell (TX)

On-site
USD 120,000 - 150,000
QAQC Manager
QAQC Manager

Pogue Construction • Crandall (TX)

On-site
USD 120,000 - 160,000
QAQC Manager
QAQC Manager

Pogue Construction • Kaufman (TX)

On-site
USD 90,000 - 130,000
QAQC Manager
QAQC Manager

Pogue Construction • Canton (TX)

On-site
USD 130,000 - 200,000
QAQC Manager
QAQC Manager

Pogue Construction • Van (TX)

On-site
USD 120,000 - 180,000
QAQC Manager
QAQC Manager

Pogue Construction • Athens (TX)

On-site
USD 120,000 - 160,000
QAQC Manager
QAQC Manager

Pogue Construction • Wills Point (TX)

On-site
USD 120,000 - 180,000