Consigue una respuesta de este empleador
Tu currículum y tu carta de presentación, adaptados exactamente a lo que buscan contratar.
Church of Jesus Christ in St George, UT seeks a Custodian 2 (Temporary - Part time Fixed Term) for 6 months at Red Cliffs UT Temple. This on-site role maintains clean, safe facilities and may support grounds or events as needed.
The position requires lifting, operating cleaning equipment and lifts, handling waste, restocking supplies, and reporting safety issues. Candidates should lift up to 50 lbs alone and 100 lbs with a team, and handle chemicals safely.
Church of Jesus Christ in St George, UT seeks a Custodian 2 (Temporary - Part time Fixed Term) for 6 months at Red Cliffs UT Temple. This on-site role maintains clean, safe facilities and may support grounds or events as needed.
The position requires lifting, operating cleaning equipment and lifts, handling waste, restocking supplies, and reporting safety issues. Candidates should lift up to 50 lbs alone and 100 lbs with a team, and handle chemicals safely.