Sr. Manager, Data Center Construction Management

Oracle

Abilene (TX)

On-site

USD 120,000 - 252,000

Full time

7 days ago
Be an early applicant

Get more replies from employers

Send a job-specific resume in minutes.

Benefits offered by this job

Relocation package
Comprehensive benefits package
Paid time off and holidays

Job summary

Oracle Cloud Infrastructure (OCI) is seeking a Senior Manager, Construction Management to lead field execution for hyperscale data center construction in Shackelford, Texas. The role is highly field-based (85–95% onsite) with direct contractor engagement and hands-on execution management, requiring local of relocation to Abilene area if needed.

The Senior Manager will build and lead a team, coordinate contractors, track progress, enforce safety and quality, and support turnover for commissioning

Qualifications

  • 10+ years in managing construction execution on large-scale projects.
  • 2+ years in a leadership role with direct reports.
  • Experience in data centers or mission-critical facilities.
  • Strong knowledge of sequencing, coordination, and turnover.
  • Able to read drawings, specs, schedules and turnover docs.
  • Excellent communication and on-site leadership.

Responsibilities

  • Lead daily construction execution for assigned buildings or trade scopes.
  • Coordinate general contractors, subcontractors, foremen, and trade partners.
  • Monitor field progress, manpower, productivity, and readiness.
  • Ensure activities align with schedules and turnover priorities.
  • Identify and resolve field risks and conflicts; escalate as needed.
  • Reinforce onsite safety and quality standards; support commissioning.
  • Track punch-lists, turnover readiness, and startup support.

Skills

Construction leadership
Field execution
Safety leadership
Vendor coordination
Communication skills
Problem solving

Tools

Primavera P6
Oracle Primavera Cloud
MS Project
Power BI
Tableau
Smartsheet

Job description

Organization: OCI Hyperscale Data Center Delivery
Location: Shackelford, Texas

Job Description
ABOUT THE ROLE:

Senior Manager, Construction Management

Oracle Cloud Infrastructure (OCI) — Data Center Infrastructure

Organization: OCI Hyperscale Data Center Delivery

Location: Shackelford, Texas

Oracle Cloud Infrastructure (OCI) is seeking a Senior Manager, Construction Management to lead field execution for hyperscale data center construction in Shackelford, Texas.

This role is responsible for driving safe, predictable, high-quality construction delivery across assigned buildings, systems, areas, or discipline scopes. The Senior Manager will build of a team of direct reports and coordinate contractors, track field progress, resolve execution issues, reinforce safety and quality expectations, and support turnover readiness for commissioning and startup.

This is a highly field-based leadership role requiring strong site presence approximately 85-95% field/site engagement, direct contractor engagement, and hands-on execution management. The role serves as a senior field leader and escalation point, helping ensure daily construction activities align with project sequencing, milestone commitments, and OCI delivery standards.

This role is based in Shackelford, Texas (20 miles from Oracle Cloud Infrastructure Abilene AI Data Center). This role does not offer remote flexibility. We are interested in candidates who are local or open to relocating to the Abilene area. Oracle offers relocation packages for eligible candidates.

Responsibilities
  • Lead daily construction execution for assigned buildings, systems, areas, or trade scopes.
  • Coordinate general contractors, subcontractors, foremen, superintendents, and trade partners.
  • Monitor field progress, manpower, productivity, sequencing, and workface readiness.
  • Ensure construction activities align with approved schedules, milestones, logistics plans, and turnover priorities.
  • Identify and resolve field issues, trade conflicts, congestion risks, and execution constraints.
  • Escalate unresolved risks quickly and clearly to construction leadership.
  • Reinforce onsite safety expectations through visible field leadership.
  • Support installation quality verification and help reduce rework.
  • Partner with QA/QC, commissioning, controls, logistics, safety, and operations teams.
  • Track punch-list items, turnover readiness, and startup support requirements.
  • Provide accurate daily field reports, progress updates, issue logs, and milestone updates.
  • Support recovery plans when schedule, quality, productivity, or coordination issues arise.
  • Coach and support Construction Managers to promote consistent field execution practices.
  • Maintain continuous site awareness through regular field walks and direct contractor engagement.
Qualifications:
  • 10+ years' experience in managing construction execution on large-scale, complex projects.
  • 2+ years' experience in a leadership role with direct reports
  • Experience in data centers, mission-critical facilities, industrial construction, infrastructure, semiconductor, power, or other technical construction environments.
  • Strong knowledge of construction sequencing, field coordination, manpower tracking, productivity monitoring, and milestone execution.
  • Demonstrated ability to coordinate contractors, subcontractors, trade partners, inspectors, and owner-side stakeholders.
  • Ability to read and interpret construction drawings, specifications, schedules, look-ahead plans, and turnover documentation.
  • Proven ability to identify field risks, resolve construction issues, and escalate effectively.
  • Strong understanding of safety expectations, quality standards, punch-list management, and turnover readiness.
  • Excellent communication skills with the ability to provide clear, accurate, and timely field updates.
  • Ability to work primarily onsite with approximately 85–95% field/site engagement.
  • Strong ownership mindset, urgency, and ability to operate in a fast-paced construction environment.
Preferred Qualifications:
  • Experience delivering hyperscale data centers or cloud infrastructure projects.
  • Experience in an owner’s representative, construction management, EPC, or general contractor environment.
  • Familiarity with data center systems, including electrical, mechanical, controls, civil, structural, architectural, network, or commissioning-related scopes.
  • Experience leading or coaching Construction Managers, field engineers, coordinators, or discipline-specific construction teams.
  • Experience supporting fast-track construction, phased turnover, commissioning-driven delivery, or recovery execution.
  • Familiarity with construction reporting tools, scheduling platforms, document control systems, and issue tracking processes (e.g., Primavera P6, Oracle Primavera Cloud, MS Project, Power BI, Tableau, Smartsheet, or similar tools)
  • Strong ability to drive contractor accountability while maintaining productive working relationships.
  • Ability to lead through field presence, direct communication, disciplined follow-up, and practical problem solving.
  • Certifications: PMP, PgMP, PMI-SP, CCP, PSP, Lean Six Sigma

Disclaimer:

Certain U.S. based or U.S. customer or client-facing roles may be required to comply with applicable requirements, such as immunization/occupational health mandates, and/or drug testing requirements.

Range and benefit information provided in this posting are specific to the stated locations only

US: Hiring Range in USD from: $120,100 - $251,600 per year. May be eligible for bonus, equity, and compensation deferral.

Oracle maintains broad salary ranges for its roles in order to account for variations in knowledge, skills, experience, market conditions and locations, as well as reflect Oracle's differing products, industries and lines of business.

Candidates are typically placed into the range based on the preceding factors as well as internal peer equity.

Oracle US offers a comprehensive benefits package which includes the following:

  • Medical, dental, and vision insurance, including expert medical opinion
  • Short term disability and long term disability
  • Life insurance and AD&D
  • Supplemental life insurance (Employee/Spouse/Child)
  • Health care and dependent care Flexible Spending Accounts
  • Pre-tax commuter and parking benefits
  • 401(k) Savings and Investment Plan with company match
  • Paid time off: Flexible Vacation is provided to all eligible employees assigned to a salaried (non-overtime eligible) position. Accrued Vacation is provided to all other employees eligible for vacation benefits. For employees working at least 35 hours per week, the vacation accrual rate is 13 days annually for the first three years of employment and 18 days annually for subsequent years of employment. Vacation accrual is prorated for employees working between 20 and 34 hours per week. Employees working fewer than 20 hours per week are not eligible for vacation.
  • 11 paid holidays
  • Paid sick leave: 72 hours of paid sick leave upon date of hire. Refreshes each calendar year. Unused balance will carry over each year up to a maximum cap of 112 hours.
  • Paid parental leave
  • Adoption assistance
  • Employee Stock Purchase Plan
  • Financial planning and group legal
  • Voluntary benefits including auto, homeowner and pet insurance

The role will generally accept applications for at least three calendar days from the posting date or as long as the job remains posted.

About Us

Only Oracle brings together the data, infrastructure, applications, and expertise to power everything from industry innovations to life-saving care. And with AI embedded across our products and services, we help customers turn that promise into a better future for all. Discover your potential at a company leading the way in AI and cloud solutions that impact billions of lives.

True innovation starts when everyone is empowered to contribute. That’s why we’re committed to growing a workforce that promotes opportunities for all with competitive benefits that support our people with flexible medical, life insurance, and retirement options. We also encourage employees to give back to their communities through our volunteer programs.

We’re committed to including people with disabilities at all stages of the employment process. If you require accessibility assistance or accommodation for a disability at any point, let us know by emailing accommodation-request_mb@oracle.com or by calling 1-888-404-2494 in the United States.

Oracle is an Equal Employment Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, sexual orientation, gender identity, disability and protected veterans’ status, or any other characteristic protected by law. Oracle will consider for employment qualified applicants with arrest and conviction records pursuant to applicable law.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Principal Data Center Commissioning Engineer
Principal Data Center Commissioning Engineer

Oracle • United States

On-site
USD 102,300 - 209,500
Relocation packages
Travel opportunities (50%+)
Comprehensive benefits
Principal Data Center Construction Manager
Principal Data Center Construction Manager

Oracle • Abilene (TX)

On-site
USD 102,000 - 210,000
Medical insurance
Dental insurance
Vision insurance
+4
Principal Data Center Construction Manager
Principal Data Center Construction Manager

Oracle • Town of Texas (WI)

On-site
USD 92,000 - 113,000
Medical, dental, and vision insurance
401(k) Matching
Paid time off
Principal Data Center Construction Manager
Principal Data Center Construction Manager

Oracle • Abilene (TX)

On-site
USD 102,300 - 209,500
Medical, dental, and vision insurance
401(k) Savings Plan with company match
Flexible vacation and paid time off
Lead Principal Data Center Construction Manager
Lead Principal Data Center Construction Manager

Oracle • Abilene (TX)

On-site
USD 126,000 - 265,000
Medical, dental, and vision insurance
401(k) Savings Plan with company match
Paid time off and holidays
Principal Data Center Facilities Development Manager
Principal Data Center Facilities Development Manager

Oracle • Virginia (IL)

On-site
USD 102,000 - 210,000
Medical insurance
401(k) with company match
Paid time off
+1
Data Center Project Coordinator, Special Projects (Nashville, TN)
Data Center Project Coordinator, Special Projects (Nashville, TN)

Oracle • Nashville (TN)

On-site
USD 102,000 - 210,000
Medical, dental, and vision insurance
401(k) with company match
Paid time off
Senior Director, Data Center Support Services
Senior Director, Data Center Support Services

Oracle • Abilene (TX)

On-site
USD 170,000 - 355,000
Medical, dental, and vision insurance
401(k) Savings and Investment Plan
Paid time off
Senior Manager, Data Center Construction, Integration & Handover - Saline, MI
Senior Manager, Data Center Construction, Integration & Handover - Saline, MI

Oracle • Michigan

On-site
USD 126,000 - 265,000
Medical insurance
Dental insurance
Vision insurance
+2
Senior Manager, Data Center Construction
Senior Manager, Data Center Construction

Oracle • United States

On-site
USD 126,000 - 265,000