Sr. Director, Power Interconnection — Europe

Worldwide Mission Critical

United States

On-site

USD 180,000 - 240,000

Full time

14 days+
Application generator

Get a reply from this employer — a resume and cover letter tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

WorldWide Mission Critical seeks a Sr. Director, Power Interconnection – Europe to lead strategy and execution of grid connections for hyperscale data center campuses across the UK, Ireland and Continental Europe.

You will own the end-to-end interconnection process—from engagement with TSOs/DSOs and capacity reservations through connection agreement negotiation and energization—and serve as the primary relationship owner with European transmission and distribution system operators and

Qualifications

  • 8+ years of experience in grid interconnection, transmission/distribution planning, or utility-facing power development in Europe.
  • Direct experience negotiating with TSOs/DSOs and navigating national grid connection queue processes.
  • Working knowledge of EU, UK, and national grid codes, connection agreements, and queue-reform frameworks.
  • Willingness and ability to travel both domestic and international as required by project needs.

Responsibilities

  • Develop and execute grid interconnection strategy for hyperscale data center campuses across target European markets (e.g., UK, Ireland, Germany, Netherlands, Nordics).
  • Serve as the primary leadership point of contact with TSOs and DSOs for customer-utility issues; oversea 3P vendors.
  • Track grid connection queue positions and prepare maturity/readiness documentation under EU Grids Package rules.
  • Negotiate connection agreements, including flexible and curtailable demand structures, to accelerate time-to-power in constrained zones.
  • Coordinate with development teams to align interconnection milestones with project schedules.
  • Develop and monitor regulatory engagement programs with national regulators and industry bodies on large-load connection and grid flexibility policy.

Skills

Grid interconnection
TSO/DSO negotiations
Regulatory engagement
Cross-border coordination
Stakeholder management

Education

Bachelor's degree in electrical engineering or related field

Job description

Description
WorldWide Mission Critical is seeking a Sr. Director, Power Interconnection – Europe to lead the strategy and execution of grid connections for our hyperscale data center campuses across the UK, Ireland, and Continental Europe. This role owns the end-to-end interconnection process — from initial TSO/DSO engagement and capacity reservation through connection agreement negotiation and energization — and serves as the company's primary relationship owner with European transmission and distribution system operators and national energy regulators.
Description
WorldWide Mission Critical is seeking a Sr. Director, Power Interconnection – Europe to lead the strategy and execution of grid connections for our hyperscale data center campuses across the UK, Ireland, and Continental Europe. This role owns the end-to-end interconnection process — from initial TSO/DSO engagement and capacity reservation through connection agreement negotiation and energization — and serves as the company's primary relationship owner with European transmission and distribution system operators and national energy regulators.
Key Responsibilities
  • Develop and execute grid interconnection strategy for hyperscale data center campuses across target European markets (e.g., UK, Ireland, Germany, Netherlands, Nordics).
  • Serve as the primary leadership point of contact with TSOs and DSOs (e.g., National Grid ESO, TenneT, Elia, EirGrid, RTE) for customer-utility issues. Oversee 3P vendors engaging utility regarding connection applications, capacity reservations, and connection agreements.
  • Track grid connection queue positions across the portfolio and prepare project maturity/readiness documentation required under the EU Grids Package and national queue-reform rules.
  • Negotiate connection agreements, including flexible and curtailable demand structures, to accelerate time-to-power in grid-constrained zones.
  • Coordinate with customer development teams and WMCC development and engineering teams to align interconnection milestones with overall project development schedules.
  • Develop and monitor electric regulatory engagement program with national regulators (e.g., Ofgem, CRU, BNetzA, ACM, CRE) and industry bodies (e.g., Eurelectric) on large-load connection and grid flexibility policy.
  • Provide interconnection cost, timeline, and risk inputs to commercial and finance teams to support investment decisions.
  • Manage third party consultants and advisors engaged for grid impact studies, permitting support, and connection negotiations.
Requirements
  • 8+ years of experience in grid interconnection, transmission/distribution planning, or utility-facing power development in Europe.
  • Direct experience negotiating with TSOs/DSOs and navigating national grid connection queue processes.
  • Working knowledge of EU, UK, and national grid codes, connection agreements, and queue-reform frameworks.
  • Bachelor's degree in electrical engineering, energy, or a related field, or equivalent professional experience.
  • Experience managing interconnection activity across multiple countries or regulatory markets.
  • Strong negotiation, stakeholder management, and cross-functional coordination skills.
  • Willingness and ability to travel both domestic and international as required by project needs.
Preferred Qualifications
  • Experience specific to hyperscale data center, large industrial, or other large-load power development.
  • Existing working relationships with National Grid ESO, TenneT, Elia, EirGrid, or other major European TSOs/DSOs.
  • Familiarity with flexible/curtailable connection structures and battery energy storage system (BESS) integration.
Core Competencies
  • Grid connection queue strategy and capacity reservation
  • TSO/DSO relationship management and negotiation
  • Regulatory and policy engagement across multiple jurisdictions
  • Commercial and technical risk assessment
Travel & Work Environment
Estimated 25% travel, primarily within Europe, to meet with grid operators, regulators, and site teams.
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior Director, European Power Interconnection & Grid Strategy
Senior Director, European Power Interconnection & Grid Strategy

Worldwide Mission Critical • United States

On-site
USD 180,000 - 240,000
Interconnection / Grid Director
Interconnection / Grid Director

Circular Resourcing • United States

On-site
USD 140,000 - 210,000
401k matching
Medical insurance
Dental insurance
Infrastructure Development Lead - Europe
Infrastructure Development Lead - Europe

Fuse Energy • United States

Remote
USD 173,000 - 242,000
Biannual bonus scheme
Fully expensed tech
Director, Transmission Electrical Engineering
Director, Transmission Electrical Engineering

Worldwide Mission Critical • Northern (KY)

On-site
USD 180,000 - 250,000
Interconnection Execution Manager
Interconnection Execution Manager

eastpointenergy • Charlottesville (VA)

Hybrid
USD 144,000 - 186,000
Health insurance
401(k) match
Paid time off
+1
Senior Director, Energy Systems - 1S6J023
Senior Director, Energy Systems - 1S6J023

SNIPEBRIDGE • Dallas (TX)

On-site
USD 150,000 - 230,000
Director, Utility Interconnection
Director, Utility Interconnection

BEOWULF ELECTRICITY & DATA LLC • West Palm Beach (FL)

On-site
USD 180,000 - 220,000
Interconnection Manager
Interconnection Manager

Green Recruitment Company • Georgia

On-site
USD 85,000 - 110,000
Interconnection Execution Manager
Interconnection Execution Manager

East Point Energy • Charlottesville (VA)

On-site
USD 144,000 - 186,000
Health insurance
Dental insurance
Vision insurance
+3
Director, Utility Interconnection
Director, Utility Interconnection

TeraWulf • West Palm Beach (FL), Northern (KY)

On-site
USD 170,000 - 230,000