Sleep Lab Tech & RPSGT — Full-Time, Impactful Diagnostics

Labette Health

Parsons (KS)

On-site

USD 55,000 - 75,000

Full time

14 days+
Application generator

Turn this role into an interview — a resume and cover letter built around what this employer wants.

Get past ATS filters

Job summary

Labette Health in Parsons, KS seeks a Sleep Lab Tech/RPSGT for a full-time role in the Sleep Lab. Responsibilities include polysomnographic testing, CPAP titration, MSLT, and patient education, with emphasis on safe, high-quality care and accurate reporting.

The ideal candidate is either an RPSGT/CPSGT or a KS-licensed Respiratory Therapist willing to complete the A-STEP program. Current BLS certification is required, with opportunities to contribute to a dedicated respiratory therapy team.

Qualifications

  • Must be RPSGT/CPSGT or KS-licensed RT with A-STEP willingness.
  • BLS certification is required.
  • Experience in sleep testing and patient education is preferred.

Responsibilities

  • Coordinate and ensure safe, high-quality sleep lab services.
  • Perform polysomnographic testing, CPAP titration, and MSLT.
  • Document readings and prepare detailed physician reports.
  • Calibrate, maintain and clean lab equipment.
  • Educate patients and families before and after procedures.
  • Demonstrate knowledge of scoring parameters.

Skills

Polysomnographic testing
CPAP titration
Patient care
Documentation/reporting
Equipment calibration/maintenance

Education

RPSGT/CPSGT certification
KS Respiratory Therapist with A-STEP willingness

Tools

Polysomnography equipment
CPAP/titration equipment
MSLT equipment

Job description

Labette Health in Parsons, KS seeks a Sleep Lab Tech/RPSGT for a full-time role in the Sleep Lab. Responsibilities include polysomnographic testing, CPAP titration, MSLT, and patient education, with emphasis on safe, high-quality care and accurate reporting.

The ideal candidate is either an RPSGT/CPSGT or a KS-licensed Respiratory Therapist willing to complete the A-STEP program. Current BLS certification is required, with opportunities to contribute to a dedicated respiratory therapy team.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Sleep Lab Tech/RPSGT - FT Parsons
Sleep Lab Tech/RPSGT - FT Parsons

Labette Health • Parsons (KS)

On-site
USD 55,000 - 75,000
Polysomnography Tech | RPSGT Sleep Lab Specialist
Polysomnography Tech | RPSGT Sleep Lab Specialist

Overland Park Regional Medical Center • Overland Park (KS)

On-site
USD 42,000 - 62,000
Medical, prescription drug, dental, or
Vision plans
Wellbeing support
+1
Sleep Lab Tech - RPSGT certified by BRPT - Nights
Sleep Lab Tech - RPSGT certified by BRPT - Nights

Community Health Systems • Las Cruces (NM)

On-site
USD 42,000 - 65,000
Life Insurance
Medical, Dental, Vision Insurance
Paid Time Off
+5
Sleep Lab Tech BRPT/RPSGT — Night Shifts
Sleep Lab Tech BRPT/RPSGT — Night Shifts

Community Health Systems • Las Cruces (NM)

On-site
USD 42,000 - 65,000
Life Insurance
Medical, Dental, Vision Insurance
Paid Time Off
+5
PRN Sleep Lab RPSGT — Overnight Diagnostic Specialist
PRN Sleep Lab RPSGT — Overnight Diagnostic Specialist

Lackey Memorial Hospital • Northern (KY)

Hybrid
USD 55,000 - 75,000
Sleep Lab Tech
Sleep Lab Tech

CRESTWOOD MEDICAL CENTER • Huntsville (AL)

On-site
USD 50,000 - 70,000
401(k) with matching
Educational Assistance
Competitive salary and comprehensive benefits package
+1
Sleep Lab Tech - PRN
Sleep Lab Tech - PRN

MountainView Regional Medical Center • Las Cruces (NM)

On-site
USD 42,000 - 64,000
Sleep Lab Tech - PRN
Sleep Lab Tech - PRN

Community Health Systems • Las Cruces (NM)

On-site
USD 42,000 - 62,000
Sleep Lab Tech PRN
Sleep Lab Tech PRN

Community Health Systems • Foley (AL)

On-site
USD 45,000 - 60,000
RPSGT Sleep Technologist — PRN/Full-Time Roles
RPSGT Sleep Technologist — PRN/Full-Time Roles

Pivotal Health • Lake Saint Louis (MO)

On-site
USD 34,000 - 52,000