Senior Production Scheduler - Lead Lean Scheduling

Hitachi Energy

Alamo (TN)

On-site

USD 110,000 - 140,000

Full time

14 days+
Application generator

Don’t send a generic resume — generate a resume and cover letter tailored to this exact role.

Get past ATS filters

Benefits offered by this job

Health coverage
401(k) with company match
Paid time off
Professional growth programs
Family benefits

Job summary

Hitachi Energy is seeking a Senior Production Scheduler to lead planning across multiple manufacturing lines, ensuring resources, materials, and priorities align to deliver high-quality products on time and at scale.

You will leverage data, APS and ERP systems, and cross-functional collaboration with supply chain, engineering, sales, and quality teams to optimize production flow, reduce waste, and drive continuous improvement across the organization.

Qualifications

  • Bachelor’s degree in Supply Chain, Engineering, Operations, or related field
  • Master’s degree preferred
  • 7+ years of experience in manufacturing planning and scheduling
  • Strong expertise in APS tools and ERP systems (SAP highly desirable)
  • Advanced analytical skills with data-driven decision-making ability
  • Strong communication and collaboration skills across functions
  • APICS certification (CPIM or CSCP) is a plus

Responsibilities

  • Develop and manage production schedules across multiple manufacturing lines
  • Use APS and ERP systems to optimize scheduling and monitor execution
  • Analyze data to identify bottlenecks and improve efficiency
  • Collaborate with supply chain, engineering, sales, and quality teams
  • Adjust schedules in response to disruptions and changing priorities
  • Track performance using KPIs for adherence and resource utilization
  • Lead continuous improvement initiatives using Lean and Six Sigma
  • Mentor team members and share scheduling best practices

Skills

APS tools
SAP
Data analytics
Cross-functional collaboration
APICS CPIM/CSCP

Education

Bachelor's degree in Supply Chain, Engineering, Operations, or related field
Master’s degree preferred

Tools

APS tools
ERP systems (SAP)

Job description

Hitachi Energy is seeking a Senior Production Scheduler to lead planning across multiple manufacturing lines, ensuring resources, materials, and priorities align to deliver high-quality products on time and at scale.

You will leverage data, APS and ERP systems, and cross-functional collaboration with supply chain, engineering, sales, and quality teams to optimize production flow, reduce waste, and drive continuous improvement across the organization.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Senior Production Scheduler
Senior Production Scheduler

Hitachi Energy • Alamo (TN)

On-site
USD 110,000 - 140,000
Health coverage
401(k) with company match
Paid time off
+2
Production Scheduler - Optimize Throughput & Delivery
Production Scheduler - Optimize Throughput & Delivery

Hitachi ABB Power Grids • Alamo (TN)

On-site
USD 55,000 - 75,000
Strategic Production Scheduler | Optimize Throughput
Strategic Production Scheduler | Optimize Throughput

Hitachi Automotive Systems Americas, Inc. • Alamo (TN)

On-site
USD 60,000 - 85,000
Master Scheduler – SAP-Driven Production Planning
Master Scheduler – SAP-Driven Production Planning

hitachi • Alamo (TN)

On-site
USD 90,000 - 120,000
Strategic Master Scheduler — SAP-Driven Production
Strategic Master Scheduler — SAP-Driven Production

Hitachi Automotive Systems Americas, Inc. • Alamo (TN)

On-site
USD 85,000 - 110,000
Production Scheduler: Flexible Hours & Impactful Planning
Production Scheduler: Flexible Hours & Impactful Planning

Hitachi Automotive Systems Americas, Inc. • Republic (MO)

On-site
USD 28,000 - 43,000
Remote Work
Flexible Working hour
Medical Check-up
Strategic Production Planning Manager - Flexible Schedule
Strategic Production Planning Manager - Flexible Schedule

Hitachi Automotive Systems Americas, Inc. • Tennessee

Hybrid
USD 85,000 - 120,000
Production Scheduler: Drive On-Time Materials & Throughput
Production Scheduler: Drive On-Time Materials & Throughput

Hitachi Automotive Systems Americas, Inc. • Tennessee

Hybrid
USD 42,000 - 64,000
Strategic Master Scheduler — SAP Planning
Strategic Master Scheduler — SAP Planning

Hitachi Automotive Systems Americas, Inc. • Tennessee

Hybrid
USD 70,000 - 100,000
Production Scheduler: Drive Throughput & On-Time Delivery
Production Scheduler: Drive Throughput & On-Time Delivery

hitachi • Alamo (TN)

On-site
USD 65,000 - 90,000