Get more replies from employers
Send a job-specific resume in minutes.
FST Technical Services is seeking a Senior Electrical Commissioning Project Engineer to lead from the front, solving complex technical challenges and driving commissioning outcomes for critical facilities.
You will oversee full lifecycle commissioning, perform testing, and ensure on-site validation across diverse data centers and mission-critical environments. Strong leadership and field execution are essential for success.
At FST Technical Services, we ensure the most complex facilities in the world perform exactly as designed. From data centers to advanced manufacturing environments, our work sits at the intersection of engineering precision and real-world execution.
We are looking for a Senior Electrical Commissioning Project Engineer who can lead from the front, solve complex technical challenges, and drive commissioning outcomes in high-stakesenvironments.
This is not a checklist-driven commissioning role.
You will play a direct role in ensuring critical systems are designed correctly, installed properly, and perform under real-world conditions.
Regular travel to project sites with potential for broader U.S. travel. Must be able to work on-site asrequired.
At FST, you are part of a team that values execution, accountability, andexpertise. Strong performers are recognized, and engineers have opportunities to grow into leadership roles
Salary range: $130,000 to $180,000