A complete application in a minute
Tailored resume and cover letter, ready to send.
Turner Construction Company in Columbus, OH seeks an Experienced Construction Manager to support Superintendents and Foremen on Critical Facilities-Data Centers projects. You will coordinate trade field assignments, manage staff, monitor schedules, and lead safety and QA/QC initiatives on site.
The role requires a Bachelor’s degree and at least ten years of related experience, strong communication, travel 50%+, and proficiency with SAP, SharePoint, and Microsoft Office.
| Division: | Critical Facilities-Data Centers |
| Project Location(s): | Columbus, OH 43085 USA |
| Minimum Years Experience: | |
| Travel Involved: | |
| Job Type: | Regular |
| Job Classification: | Experienced |
| Education: | |
| Job Family: | Construction |
| Compensation: | Salaried Exempt |
Position Description: Support the Superintendents and Foremen on the various projects; oversee all trade labor hire, transfer and layoff.
Reports to: Deputy Operations Manager, Operations Manager
Essential Duties & Responsibilities*:
Qualifications: Bachelor's degree plus a minimum of ten years' related experience or an equivalent combination of education, training and/or experience. Proven written and verbal communications abilities; proficiency with computer applications, including Microsoft Office suite, SAP, SharePoint, etc. Ability to work independently and as part of a team. Must be able to travel 50%+ of the time.
Physical Demands: The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions. Performance of the duties will occasionally require physical ability to climb permanent and temporary stairs, passenger use of construction personnel hoists, ability to climb ladders and negotiate work areas under construction. Specific vision abilities required by this job include close vision, peripheral vision, depth perception, and the ability to adjust focus. Performing this job requires use of hands to finger, handle, or feel objects, tools or controls, sit, talk and hear (bells, whistles, etc.), stand, climb, balance, stoop, kneel, crouch, or crawl. Employee must occasionally lift and/or move up to 50 lbs.
Work Environment: While performing the duties of this job, the employee regularly works on-site at the construction work site where the employee is exposed to moving mechanical parts, high precarious places; fumes or airborne particles; outside weather and risk of electric shock. The noise level in the work environment is usually moderate to very loud.
*May perform other duties as assigned.
Turner is an Equal Opportunity Employer - race, color, religion, sex, sexual orientation, gender identity, national origin, disability, status as a protected veteran, or other characteristics protected by applicable law.