Get a reply from this employer
Your resume and cover letter, tailored to exactly what they’re hiring for.
Energy Resilience Partners, LLC (ERP) is deploying a Fort Buchanan, Puerto Rico project team to provide field-level safety surveillance across civil, electrical, generator, fuel, controls, and telecom work. This role extends the SSHO reach and supports but does not independently satisfy SSHO requirements unless accepted as a qualified alternate.
Minimum qualifications include 3+ years in construction safety, OSHA 30, and EM 385-1-1 familiarity.
WORK LOCATION: ON ISLAND - full-time field assignment; shift coverage as scheduled
REQUISITION: FBMG-006
CSS CAM LCAT: 9T - Technician III (nonexempt technical)
DUTY LOCATION: Fort Buchanan, Guaynabo, Puerto Rico
WORK ARRANGEMENT: ON ISLAND - full-time field assignment; shift coverage as scheduled
REPORTS TO: SSHO / Corporate Safety
EMPLOYMENT: Full-time, project-based
REQUIREMENT BASIS: Execution-critical supplemental coverage; supports qualified SSHO but does not replace it
Energy Resilience Partners, LLC (ERP) is a tribally led SBA 8(a) federal contractor advancing energy resilience and mission assurance. ERP is deploying a project team for the Fort Buchanan installation-level microgrid in Puerto Rico. The work includes diesel generation, medium-voltage distribution, microgrid controls, protective relaying, fuel infrastructure, fiber communications, optional BESS, integration of existing renewable generation, and full system commissioning.
Provide field-level safety surveillance and documentation across civil, electrical, generator, fuel, controls, and telecom work. This role extends the SSHO's reach across multiple work fronts and shifts but does not independently satisfy the SSHO requirement unless the individual is separately accepted as a qualified alternate.