Project Engineer — Construction & Scheduling

Baker Concrete Construction, Inc.

Point Pleasant (WV)

Hybrid

USD 60,000 - 90,000

Full time

31 hours ago
Be an early applicant
Application generator

Turn this role into an interview — a resume and cover letter built around what this employer wants.

Get past ATS filters

Job summary

The Baker Concrete Construction, Inc is seeking a Project Engineer to support field activities and assist the Project Manager with project administration on multiple small projects or one medium to large project. You will help manage costs, schedules, procurement, and contract administration while maintaining safety and quality standards.

Based in Point Pleasant, WV, this role requires up to 50% travel and a bachelor’s degree with construction experience or an equivalent combination.

Qualifications

  • Bachelor’s degree or 2 years’ construction experience or 6 years’ related experience.
  • Proficiency in Word, Excel, and PowerPoint.

Responsibilities

  • Generates and obtains approvals of monthly billing and earned values.
  • Develops and manages the project schedule on small or mid-sized projects.
  • Analyzes targets and goals, job cost summaries, and other reports.
  • Alerts the Superintendent and Project Manager of project impact relating to resource management, crew make-up/size, etc.
  • Generates estimates of change orders and may interface with pre-construction on original bids.
  • Coordinates with the Superintendent, Field Project Engineer, and Line and Grade to generate required as-built records.
  • Manages work package closure, punch lists, and project turnover process.
  • Collects necessary documentation to identify and determine impact of potential contract changes, disputes, and claims.

Skills

Microsoft Word
Microsoft Excel
PowerPoint

Education

Bachelor’s degree
Construction experience

Tools

Primavera
Timberline
Vista

Job description

The Baker Concrete Construction, Inc is seeking a Project Engineer to support field activities and assist the Project Manager with project administration on multiple small projects or one medium to large project. You will help manage costs, schedules, procurement, and contract administration while maintaining safety and quality standards.

Based in Point Pleasant, WV, this role requires up to 50% travel and a bachelor’s degree with construction experience or an equivalent combination.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Project Engineer
Project Engineer

Baker Concrete Construction, Inc. • Point Pleasant (WV)

On-site
USD 60,000 - 90,000
Project Engineer — Build the Future with a Leader
Project Engineer — Build the Future with a Leader

Baker Concrete Construction, Inc. • Charlotte (NC)

On-site
USD 75,000 - 105,000
Field Project Engineer - Lean Construction & Scheduling
Field Project Engineer - Lean Construction & Scheduling

Baker Concrete Construction, Inc. • Arlington (VA)

On-site
USD 73,000 - 95,000
Medical benefits
Dental coverage
Vision coverage
+2
Senior Project Engineer - Construction, Cost & Schedule Lead
Senior Project Engineer - Construction, Cost & Schedule Lead

Baker Concrete Construction, Inc. • Charlotte (NC)

On-site
USD 95,000 - 135,000
Senior Project Engineer - Construction Lead (Travel 25%)
Senior Project Engineer - Construction Lead (Travel 25%)

Baker Concrete Construction, Inc. • Jacksonville (FL)

On-site
USD 90,000 - 120,000
Field Project Engineer: Travel-Heavy, Impactful Projects
Field Project Engineer: Travel-Heavy, Impactful Projects

Baker Concrete Construction, Inc. • Suwanee (GA)

Hybrid
USD 70,000 - 100,000
Project Engineer
Project Engineer

Baker Construction • North Carolina

On-site
USD 70,000 - 110,000
Field Project Engineer: Build Impactful Projects
Field Project Engineer: Build Impactful Projects

Baker Concrete Construction, Inc. • Sullivan (IN)

On-site
USD 70,000 - 110,000
Project Engineer
Project Engineer

Baker Concrete Construction, Inc. • Arlington (VA)

On-site
USD 73,000 - 95,000
Medical benefits
Dental coverage
Vision coverage
+2
Project Engineer
Project Engineer

Baker Concrete Construction, Inc. • Charlotte (NC)

On-site
USD 75,000 - 105,000