Project Director – Utility & Power Infrastructure - Data Center Construction

Turner & Townsend

Pittsburgh (Allegheny County)

On-site

USD 120,000 - 150,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

A leading project management consultancy in Pittsburgh is seeking a Project Director for Utility & Power Infrastructure in Data Center Construction. The role involves defining power delivery strategies, managing utilities, and overseeing electrical projects with a minimum of 12 years experience required. Ideal candidates will demonstrate expertise in electrical systems, strong leadership skills, and familiarity with regulatory compliance. The position requires on-site presence and emphasizes safety and quality in project management.

Qualifications

  • 12+ years of experience in power infrastructure or electrical project management.
  • Proven ability to manage large-scale electrical projects and utility coordination.
  • Strong knowledge of electrical design, construction, and commissioning processes.

Responsibilities

  • Define and implement the power delivery strategy for the data center program.
  • Develop and manage project plans for utility interconnections and substations.
  • Coordinate with regional utilities to secure agreements and permits.

Job description

Project Director – Utility & Power Infrastructure – Data Center Construction

Turner & Townsend

Beaver County, PA

Responsibilities
  • Define and implement the power delivery strategy for the data center program, ensuring alignment with capacity, redundancy, and reliability requirements.
  • Develop and manage project plans for utility interconnections, substations, and on-site generation systems.
  • Coordinate with regional utilities and energy providers to secure agreements, permits, and timelines for power delivery.
  • Lead design reviews for electrical infrastructure, including medium/high-voltage systems, switchgear, transformers, and backup power solutions.
  • Ensure constructability and compliance with codes, standards, and utility requirements.
  • Integrate power systems with overall site development and data center design.
  • Manage procurement and installation of electrical equipment and infrastructure.
  • Oversee construction activities related to power connectivity, ensuring safety, quality, and adherence to specifications.
  • Monitor progress and resolve technical issues to maintain schedule certainty.
  • Direct commissioning of electrical systems, including load testing, redundancy validation, and integrated systems testing (IST).
  • Ensure all systems meet design intent and operational performance standards.
  • Serve as the primary liaison with utility companies, energy providers, and regulatory agencies.
  • Communicate progress, risks, and mitigation strategies to senior leadership and project stakeholders.
  • Identify and mitigate risks related to power delivery and system reliability.
  • Ensure compliance with environmental, regulatory, and safety requirements.
  • Manage and mentor project team members and contractors involved in power infrastructure delivery.
  • Foster a culture of safety, accountability, and continuous improvement.
  • SOX control responsibilities may be part of this role, which are to be adhered to where applicable.
Qualifications
  • 12+ years of experience in power infrastructure or electrical project management, preferably in mission-critical or data center environments.
  • Proven ability to manage large-scale electrical projects, including utility coordination and high-voltage systems.
  • Strong knowledge of electrical design, construction, and commissioning processes.
  • Familiarity with utility interconnection agreements, permitting, and regulatory compliance.
  • Bachelor’s degree in Electrical Engineering, Power Systems, or related field (advanced degree preferred).
  • Professional certifications such as PE, PMP, or equivalent are highly desirable.
  • Expertise in relevant codes and standards (NFPA, NEC, IEEE, NESC) and safety regulations.
  • Excellent leadership, communication, and problem-solving skills; ability to manage multiple priorities in a fast‑paced environment.
Additional Information
  • *On‑site presence and requirements may change depending on our client’s needs.
Equal Employment Opportunity

Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.

All personal information will be kept confidential according to EEO guidelines.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Project Director - Data Center Construction
Project Director - Data Center Construction

Turner & Townsend • Pittsburgh

On-site
USD 120,000 - 150,000
Flexible working environment
Commitment to work-life balance
Electrical Project Manager - Data Center Construction
Electrical Project Manager - Data Center Construction

Turner & Townsend • Baton Rouge (LA)

On-site
USD 95,000 - 150,000
Electrical Project Manager - Data Center Construction
Electrical Project Manager - Data Center Construction

Turner & Townsend Pty Limited • Lubbock (TX)

On-site
USD 120,000 - 180,000
Mechanical Project Manager Data Center Construction
Mechanical Project Manager Data Center Construction

Turner & Townsend • Alexandria (VA)

On-site
USD 120,000 - 180,000
Electrical Project Manager - Data Center
Electrical Project Manager - Data Center

Turner & Townsend • Fredericksburg (VA)

On-site
USD 110,000 - 140,000
Electrical Project Manager - Data Center Construction
Electrical Project Manager - Data Center Construction

Turner & Townsend • Newark (NJ)

On-site
USD 140,000 - 180,000
Quality Assurance PM – Electrical - Data Center Construction
Quality Assurance PM – Electrical - Data Center Construction

Turner & Townsend • Jackson (MS)

On-site
USD 90,000 - 120,000
Director Construction Management - Data Center
Director Construction Management - Data Center

Turner & Townsend • Wide Ruins (AZ)

On-site
USD 250,000 - 300,000
Comprehensive benefits package
Electrical OFCI Design Manager - Data Center Construction
Electrical OFCI Design Manager - Data Center Construction

Turner & Townsend • United States

Remote
USD 170,000 - 210,000
Senior Data Center Project Manager- Infrastructure
Senior Data Center Project Manager- Infrastructure

Turner & Townsend • Minneapolis (MN)

Hybrid
USD 110,000 - 160,000