A complete application in a minute
Tailored resume and cover letter, ready to send.
Dynamic Systems (DSI), LLC, a Quanta Services company, seeks a Production Planner / Master Scheduler to own the OSM master production schedule across all active jobs. This is a planning and control role, not floor supervision, coordinating with procurement, detailing, and vendors to ensure on-time module releases.
You will forecast capacity, sequence line releases, and publish look‑ahead reports to leadership, driving improvements in lead times, capacity utilization, and schedule reliability.
Dynamic Systems (DSI), LLC, a Quanta Services company, is a mechanical contractor delivering HVAC and plumbing systems for mission-critical facilities. Our Division 440 Off-Site Manufacturing (OSM) group builds modular mechanical assemblies — skids, racks, headers, and prefabricated piping and equipment modules — in a controlled fabrication facility for installation on data‑center and industrial projects.
Dynamic Systems (DSI), LLC, a Quanta Services company, is a mechanical contractor delivering HVAC and plumbing systems for mission-critical facilities. Our Division 440 Off‑Site Manufacturing (OSM) group builds modular mechanical assemblies — skids, racks, headers, and prefabricated piping and equipment modules — in a controlled fabrication facility for installation on data‑center and industrial projects. The Production Planner / Master Scheduler owns the plan for what the OSM floor builds, in what sequence, and when it leaves the building. This is a production planning and control role, not a floor‑supervision role. The Floor Manager owns how the work gets built and who builds it; this position owns what enters the line, when it enters, and where finished product goes. The two roles run the floor together and report to the same division leader. The right candidate has lived inside a make‑to‑order or engineer‑to‑order manufacturing operation — where every unit is different, drawings arrive late, and delivery dates move — and has kept a multi‑customer production schedule honest under those conditions.
PI39a1b0475ca2-25448-41659129