PM Work Control Coordinator - Nuclear Facility

N3B Los Alamos, LLC

Los Alamos (NM)

On-site

USD 60,000 - 116,000

Full time

2 days ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Newport News Nuclear BWXT Los Alamos (N3B) located at Los Alamos, NM, is seeking a Work Control Coordinator to manage preventive maintenance readiness. You will assemble work packages, distribute to field personnel, review completed work packages, and act as Records Custodian.

The role requires close collaboration with Maintenance, Logistics, Engineering, Safety, and QA teams. Level 1 requires 0–1 years of relevant experience; Level 2 requires 3 years in radiological hazardous waste remediation,

Qualifications

  • Bachelor's degree in a technical field or closely related discipline required.
  • 3 years radiological hazardous waste environmental remediation, construction engineering, construction management, procurement and process engineering and/or facility operations experience (Level 2).
  • 0-1 years relevant experience (Level 1).

Responsibilities

  • Maintain a controlled area to house ready-to-work, scheduled and completed work packages and dispositions.
  • Assemble scheduled PM work packages 3 weeks ahead of execution date with latest docs.
  • Distribute work packages to field personnel and monitor execution.
  • Record and track assignees in DevonWay for accountability.
  • Review completed work packages for adherence to guidelines.
  • Serve as Records Custodian for records disposition.
  • Process requests to create/modify/cancel PM tasks in DevonWay.
  • Foster an inclusive, safe work environment and support nuclear safety culture initiatives.

Skills

CMMS
MS Office

Education

Bachelor's degree in technical field
Bachelor's degree in a closely related discipline

Tools

CMMS
MS Office

Job description

Newport News Nuclear BWXT Los Alamos (N3B) located at Los Alamos, NM, is seeking a Work Control Coordinator to manage preventive maintenance readiness. You will assemble work packages, distribute to field personnel, review completed work packages, and act as Records Custodian.

The role requires close collaboration with Maintenance, Logistics, Engineering, Safety, and QA teams. Level 1 requires 0–1 years of relevant experience; Level 2 requires 3 years in radiological hazardous waste remediation,

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

PM Work Control Coordinator I/II | Planning
PM Work Control Coordinator I/II | Planning

Automatic Data Processing, Inc. • Los Alamos (NM)

On-site
USD 60,000 - 117,000
Nuclear Work Control Coordinator I/II – PM Planning Records
Nuclear Work Control Coordinator I/II – PM Planning Records

Newport News Nuclear BWXT Los Alamos LLC • Los Alamos (NM)

On-site
USD 60,000 - 116,000
Work Control Coordinator 1/2
Work Control Coordinator 1/2

N3B Los Alamos • Los Alamos (NM)

On-site
USD 60,000 - 90,000
Work Control Coordinator 1/2
Work Control Coordinator 1/2

Automatic Data Processing, Inc. • Los Alamos (NM)

On-site
USD 60,000 - 117,000
Work Control Coordinator 1/2
Work Control Coordinator 1/2

N3B Los Alamos, LLC • Los Alamos (NM)

On-site
USD 60,000 - 116,000
Work Control Coordinator 1/2
Work Control Coordinator 1/2

Newport News Nuclear BWXT Los Alamos LLC • Los Alamos (NM)

On-site
USD 60,000 - 116,000
Nuclear Facility Work Control Coordinator
Nuclear Facility Work Control Coordinator

Automatic Data Processing, Inc. • Los Alamos (NM)

On-site
USD 93,000 - 149,000
Strategic Work Week Planner - Nuclear Facility
Strategic Work Week Planner - Nuclear Facility

N3b La • Los Alamos (NM)

On-site
USD 80,000 - 128,000
Work Week Planner & Execution Coordinator
Work Week Planner & Execution Coordinator

Automatic Data Processing, Inc. • Los Alamos (NM)

On-site
USD 80,000 - 128,000
Work Week Orchestrator
Work Week Orchestrator

N3b La • Los Alamos (NM)

On-site
USD 60,000 - 111,000