A complete application in a minute
Tailored resume and cover letter, ready to send.
WW Clyde is hiring experienced Heavy Equipment Operators for an underground pipeline project in Minidoka County, Idaho. The project includes nine miles of open cut trench installation of HDPE pipe ranging from 14 to 54 inches in diameter, along with drainage sumps, turnouts, and tie ins.
Operators will primarily run excavators, digging trench to line and grade, working around shoring, setting pipe, and backfilling.
WW Clyde is hiring experienced Heavy Equipment Operators for an underground pipeline project in Minidoka County, Idaho. The project includes nine miles of open cut trench installation of HDPE pipe ranging from 14 to 54 inches in diameter, along with drainage sumps, turnouts, and tie ins.
Operators will primarily run excavators, digging trench to line and grade, working around shoring, setting pipe, and backfilling.