Onsite Field Eng Tech — Grid Construction & Scheduling

PG&E

Sacramento (CA)

On-site

USD 96,000 - 100,000

Full time

6 days ago
Be an early applicant
Application generator

Don’t send a generic resume — generate a resume and cover letter tailored to this exact role.

Get past ATS filters

Job summary

PG&E in Sacramento seeks an onsite Engineering Technician to assist with planning, scheduling, cost control and field drawings under supervision. The role supports senior field teams, processes licenses and orders, and prepares construction notes.

The position is wage-driven and locality-based, with emphasis on safety, PPE, and ability to travel within PG&E territory. Candidates should be able to work extended hours as needed.

Qualifications

  • 18 years of age or older.
  • High School diploma, GED, or equivalent.
  • Valid California driver’s license.
  • Ability to wear company PPE.
  • Ability to lift up to 75 pounds at least once daily.

Responsibilities

  • Assist in planning, scheduling and cost-control activities for construction-related work.
  • Support Senior Field Engineering Technicians and Field Engineers.
  • Maintain schedule and cost control files and generate reports.
  • Process licenses, permits and material orders and receipts.
  • Prepare construction notes and field drawings; handle contract management tasks.

Skills

MS Office
Excel
Driving
Weather resilience

Education

High School diploma / GED

Tools

Excel
Outlook
PowerPoint
SharePoint
Word

Job description

PG&E in Sacramento seeks an onsite Engineering Technician to assist with planning, scheduling, cost control and field drawings under supervision. The role supports senior field teams, processes licenses and orders, and prepares construction notes.

The position is wage-driven and locality-based, with emphasis on safety, PPE, and ability to travel within PG&E territory. Candidates should be able to work extended hours as needed.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Onsite Field Engineering Technician – Construction
Onsite Field Engineering Technician – Construction

Pacific Gas and Electric Company • Sacramento (CA)

On-site
USD 63,000 - 72,000
Field Engineering Technician
Field Engineering Technician

PG&E • Sacramento (CA)

On-site
USD 96,000 - 100,000
Field Engineering Technician
Field Engineering Technician

Pacific Gas and Electric Company • Sacramento (CA)

On-site
USD 63,000 - 72,000
Field Engineer
Field Engineer

PG&E • Oakland (CA)

On-site
USD 74,000 - 111,000
Field Engineer
Field Engineer

Pacific Gas and Electric Company • Oakland (CA)

On-site
USD 74,000 - 110,000
Field Engineer - Gas Construction & As-Built
Field Engineer - Gas Construction & As-Built

PG&E • Oakland (CA)

On-site
USD 74,000 - 111,000
Design Engineer, Electric Transmission Line
Design Engineer, Electric Transmission Line

Pacific Gas and Electric Company • Oakland (CA)

On-site
USD 65,000 - 108,000
Substation Project Engineer
Substation Project Engineer

Pacific Gas and Electric Company • West Sacramento (CA)

Hybrid
USD 121,000 - 184,000
Supervisor, T-Line Engineering
Supervisor, T-Line Engineering

PG&E • West Sacramento (CA)

Hybrid
USD 137,000 - 232,000
Supervisor, T-Line Engineering
Supervisor, T-Line Engineering

Pacific Gas and Electric Company • West Sacramento (CA), Northern (KY)

Hybrid
USD 137,000 - 232,000