A complete application in a minute — tailored resume and cover letter, ready to send.
Jacobs is seeking an On-Site Electrical Engineer for a Baton Rouge project. The role serves as the field representative, supporting electrical design, installation, commissioning, and coordination with stakeholders to resolve issues.
You will oversee on-site activities for medium- and low-voltage systems, substations, switchgear, UPS, and protective relaying, while ensuring compliance with drawings, specs, and safety standards.
Jacobs is seeking an On-Site Electrical Engineer for a Baton Rouge project. The role serves as the field representative, supporting electrical design, installation, commissioning, and coordination with stakeholders to resolve issues.
You will oversee on-site activities for medium- and low-voltage systems, substations, switchgear, UPS, and protective relaying, while ensuring compliance with drawings, specs, and safety standards.