On-Site Construction Scheduler in Homer City

Energy Jobline ZR

Homer City (PA)

In loco

USD 70.000 - 100.000

Tempo pieno

7 giorni fa
Candidati tra i primi

Aumenta le possibilità di ricevere una risposta da questo datore di lavoro

Il tuo curriculum e una lettera di presentazione personalizzati, che corrispondono esattamente a ciò che sta cercando.

Supera i filtri ATS

Descrizione del lavoro

Energy Jobline ZR is seeking a Scheduler/Lead Scheduler to partner with project management, engineering and construction teams to build and maintain detailed schedules from planning through execution. The role involves updating schedules as milestones are reached, coordinating with clients, and leading a small team on site.

The candidate should have an engineering or construction management degree, proficiency with MS Office, and knowledge of project controls tools such as inEight Suite or

Competenze

  • Engineering or Construction management degree required.
  • Knowledge of project controls software such as inEight Suite or Primavera P6.
  • Willingness to travel/relocate as needed.
  • Strong interpersonal, written and verbal communication skills.

Mansioni

  • Work with project managers, engineers, designers, procurement, construction managers and others to plan and schedule projects from concept through engineering and construction.
  • Develop resource loaded schedules with activities, milestones and critical deliverables.
  • Create schedule logic, durations, and resource requirements.
  • Assess design changes and schedule slippages and inform management and clients of updates.
  • Apply project controls concepts to develop and maintain critical path networks.
  • Provide guidance and interface with clients, attend meetings and deliver schedule health reports.

Conoscenze

Microsoft Office
Interpersonal skills

Formazione

Engineering or Construction management degree

Strumenti

inEight Suite
Primavera P6

Descrizione del lavoro

Job Description
Position Overview
As a Scheduler,

you will get the opportunity to work closely with construction and engineering operations as you develop engineering and construction schedules. You will be responsible for building and updating schedules as various milestones and project deliverables are completed or added to the scope of work, while providing updates to key project team members on the progress of projects

As a Lead Scheduler,

you will get the opportunity to work closely with construction and engineering operations as you develop engineering and construction schedules. You will be responsible for building and updating schedules as various milestones and project deliverables are completed or added to the scope of work, while also providing updates to key project team members on the progress of projects and connecting with the client. You will also lead a small team of schedulers on a project site.

Responsibilities
  • Work closely with project managers, engineers, designers, procurement staff, construction managers, contractors and other project services staff to provide detailed planning and scheduling of projects from conceptual planning through engineering and construction
  • Develop resource loaded schedules, including lists of activities, major milestones, critical approvals, long lead procurement items and other critical project deliverables to be scheduled and tracked for the projects
  • Develop schedule logic and constraints, realistic activity durations and available manpower and resources
  • Assess the impact of design changes and schedule slippages and inform company management and clients of all schedule updates
  • Apply engineering, procurement, and construction terminology and concepts to develop and maintain critic path logic networks; accumulate and access historical data for use in maintaining realistic future planning and forecasting
  • Provide guidance, direction, and specialized assistance for the resolution of difficult project control problems. Interface with clients, attend regular meetings and give schedule health reports.
Qualifications
  • Proficiency with computers and software including Microsoft Office products
  • Degree in Engineering or Construction management, or similar industry required.
  • Knowledge of, or a willingness to learn about, various project controls software, such as inEight Suite, Primavera P6, etc.
  • Ability to travel and/or relocate as needed
  • Ability to freely access all points of a construction site in a wide-ranging climates and environments
  • Highly motivated, with a passion for excellence and taking initiative
  • Strong work ethic, willing to do what it takes to get the job done right the first time
  • Demonstrated commitment to ethics and integrity
  • Passion for safety, with the ability to help us ensure that nobody gets hurt
  • Strong interpersonal, written, and verbal communication skills
Other Requirements:

Regular, reliable attendance. Work productively and meet deadlines timely Communicate and interact effectively and professionally with supervisors, employees, and others individually or in a team environment.

Perform work safely and effectively. Understand and follow oral and written instructions, including warning signs, equipment use, and other policies.

Work during normal operating hours to organize and complete work within given deadlines. Work overtime and weekends as required.

May work at various locations and conditions may vary.

Ottieni la revisione del curriculum gratis e riservata.

o trascina qui il file.

Similar jobs

Offerte di lavoro simili che vale la pena confrontare

Project Scheduler (Mission Critical - Haskell, TX)
Project Scheduler (Mission Critical - Haskell, TX)

Haydon • Texas

In loco
USD 80.000 - 110.000
Construction Scheduler
Construction Scheduler

GAS GLOBAL SERVICES • Blairsville (PA)

In loco
USD 80.000 - 120.000
Scheduler
Scheduler

IMC Construction • Port Reading (NJ)

In loco
USD 70.000 - 90.000
Scheduler - Kiewit Power Constructors
Scheduler - Kiewit Power Constructors

Kiewit Corporation • Pittsburgh (PA)

In loco
USD 70.000 - 90.000
Medical insurance (top-tier) ou tcrob
Dental insurance
Vision insurance
+4
Scheduler - Kiewit Power Constructors
Scheduler - Kiewit Power Constructors

Kiewit Corporation • Homer City (PA)

In loco
USD 70.000 - 100.000
Top-tier medical, dental and vision
Life insurance
Retirement plans with matching
+1
Construction Scheduler in Huntington Beach
Construction Scheduler in Huntington Beach

Energy Jobline ZR • Huntington Beach (CA)

In loco
USD 85.000 - 125.000
Health insurance
Paid time off
Training & development
+2
Senior Construction Scheduler
Senior Construction Scheduler

GAS GLOBAL SERVICES • Blairsville (PA)

In loco
USD 95.000 - 130.000
Project Scheduler (35375)
Project Scheduler (35375)

CEC • Tulsa (OK)

In loco
USD 70.000 - 100.000
Chief Scheduler
Chief Scheduler

Albert M. Higley Co. • Cleveland (OH)

In loco
USD 150.000 - 190.000
Assistant Scheduler
Assistant Scheduler

IMC Construction • Malvern (PA)

In loco
USD 55.000 - 75.000