Standard Carbon is seeking a hands-on Chemical Process Engineer / Commissioning Engineer to own the CCNY carbon capture, hydrogen production, and Sabatier methanation system in Manhattan. The role requires operating real process equipment, troubleshooting pumps and heat exchangers, reviewing P&IDs, and coordinating PLC changes on-site.
You will validate the plant against DWSIM and Aspen HYSYS, manage trades and contractor activities, and drive the automated demonstration to startup from a single
Location: CCNY, Manhattan | Engagement: Contract-to-Hire | Company: Standard Carbon
Standard Carbon is seeking a hands‑on Chemical Process Engineer / Commissioning Engineer to own our installed carbon capture, hydrogen production, and Sabatier methanation system at CCNY.
This is not a remote design role. We need an engineer who can operate real process equipment, troubleshoot pumps, heat exchangers and controls, review P&IDs, manage trades, coordinate PLC changes, and validate the plant against DWSIM and Aspen HYSYS.
Goal: convert the CCNY pilot into a reliable automated demonstration plant that an authorized user can start with essentially one command through the Unitronics HMI/web/mobile interface.
The CCNY deployment demonstrates Standard Carbon's the Carbon Bridge process:
Combustion exhaust → MEA CO₂ capture → CO₂ conditioning → hydrogen production → Sabatier methanation → water removal → methane production/use
Approximate design basis: 3.9 kg/h CO₂ utilization, 0.7 kg/h H₂, 1.5 kg/h methane, ~35 kW electrolysis, <40 kW total steady‑state input, and ~60% electricity‑to‑methane efficiency (LHV).
The subsystems are installed and have operated, but substantial operator attention remains. Hydrogen is currently supplied by two third‑party PEM electrolyzers producing ~1.5 Nm³/h combined H₂, with flow read locally rather than fully integrated into the PLC/HMI.
The carbon‑capture system is oversized relative to hydrogen/methanation capacity. The MEA/desorber has greater thermal mass and regeneration demand than the current reactors can continuously support. Operation also requires manual pump/VFD control, electrolyzer startup, CO₂ ratio control, reactor heating, condensate draining, routing and shutdown sequencing.
System 010: propane‑fired Rinnai RX‑series water heater, blower B‑101, flue‑gas measurement/routing, purge, ventilation, gas detection and safety interfaces.
System 100: ~30 wt% MEA; C‑101 scrubber; C‑102 absorber; C‑103 desorber; P‑101/P‑102/P‑103; F‑101/F‑102/F‑103; HX‑111/HX‑101/HX‑102/HX‑103; chiller loop; EH‑101/supplemental heat; Sg‑01; CO₂ drying, compression and buffering; valves/VFDs; flow, temperature, pressure and level instrumentation; AIT‑101/AIT‑102/AIT‑103; Unitronics PLC/HMI.
Reconcile P&IDs, PLC logic and the physical installation and correct/document discrepancies.
A principal task is matching desorber heat demand with reactor heat supply. Target conditions to investigate include:
The desorber inventory appears large relative to the MEA flow receiving reactor heat. Measure actual flows, temperatures, inventory, exchanger performance and losses and close the real thermal balance.
Calculate MEA regeneration heat demand, reactor heat generation, exchanger effectiveness, circulation rates, desorber thermal inventory, heat losses, required H₂/methanation capacity, cooling requirements, and startup versus steady‑state loads.
Implement the appropriate combination of added hydrogen/methanation capacity, improved heat recovery, heat exchangers, active cooling, instrumentation, automated valves, and supplemental boiler/electric heat if required. Methanation heat should satisfy as much of the desorber load as practical.
Replace the temporary PEM units with Standard Carbon's in‑house alkaline electrolyzer and commission its balance of plant: ELE‑201 stack, DC power supply, ~30% KOH electrolyte loop, C‑201 O₂ separator, C‑202 H₂ separator, P‑201, HX‑211, EH‑201, instrumentation, automated XV valves, O₂ vent/H₂ routing, C‑203/C‑204 cooling/separation, P‑202, HX‑201, CH‑201, condensate handling, H₂ drying, EH‑202, PR‑201, H₂ analysis and PLC I/O.
Manage the mechanical, electrical, controls and commissioning transition from PEM to alkaline electrolysis.
System 300 includes REA‑1/REA‑2 parallel primary reactors, REA‑3 polishing reactor, EH‑301/EH‑302/EH‑303 heaters, temperature/pressure instrumentation, H₂/CO₂ feed, FIT‑301/FCV‑301 CO₂ control, ~3.9:1 H₂:CO₂ target, reactor‑to‑MEA heat recovery, condensate removal, gas drying, AIT‑301 methane measurement, AIT‑302 residual CO₂ measurement, and methane storage/vent/supply routing.
Optimize conversion, cooling, condensate removal, flow distribution, heat recovery, gas composition, controls and reactor capacity.
The final system must provide a single‑command automated demonstration. An authorized user should press START DEMONSTRATION, after which the Unitronics PLC verifies permissives and automatically sequences gas detection/ventilation, utilities, levels, pumps, valves, flue‑gas generation, capture, desorption, reactor heating, alkaline electrolyzer startup, H₂:CO₂ ratio control, methanation, condensate removal, gas drying, methane analysis, product routing, burner/flare demonstration, data logging and controlled shutdown/standby.
Automate routine manual valves where required. Safety logic must address overtemperature, high pressure, low flow, circulation loss, electrolyzer faults, gas detection, ventilation, purge, emergency venting, power loss and E‑stop conditions.
The plant should include an approved automatic product‑gas bypass to a controlled burner or flare. A visitor should see CO₂ capture, H₂ production, reactor performance, methane concentration, electrical consumption, efficiency, CB1000 benchmark performance, and a visible flame. Burner controls must include ignition, flame proving, isolation, pressure control and shutdown safeguards.
Build a complete digital twin using DWSIM and Aspen HYSYS covering carbon capture/desorption, CO₂ conditioning, alkaline electrolysis, hydrogen conditioning, Sabatier reactors, methanation heat recovery, condensate separation, methane production, and electricity/thermal/water balances.
Reconcile model predictions against actual sensor data and investigate discrepancies caused by modeling, instrumentation, equipment performance, heat loss, flow measurement or installation.
Serve as Standard Carbon's on‑site technical owner and identify/manage plumbers, electricians, mechanical contractors, fabricators, instrumentation contractors, burner/combustion contractors and PLC resources. You need not perform licensed trade work, but must specify work, obtain quotes, supervise installation and commission the result.
Required: Chemical Engineering degree or related field; hands‑on process commissioning/operation; strong heat/mass‑transfer knowledge; pumps, heat exchangers, packed columns, gas/liquid separation, instrumentation/process controls, P&IDs, DWSIM, Aspen HYSYS and contractor management; ability to work on‑site at CCNY.
Preferred: MEA carbon capture, alkaline/PEM electrolysis, hydrogen systems, Sabatier methanation, Unitronics PLC/HMI, automated valves, burner/flare systems, HAZOP and pilot‑plant commissioning.
Success means the alkaline electrolyzer is commissioned; the thermal mismatch is resolved; capture/desorption/methanation operate predictably; H₂/CO₂ ratio control is automatic; cooling and condensate handling are reliable; alarms/interlocks work; routine demonstration actions are automated; Unitronics provides complete monitoring/control; performance is displayed against the CB1000 benchmark; the burner operates safely; and an authorized user can initiate a complete demonstration with essentially one command.
The DWSIM/HYSYS model should accurately represent the plant, and operation should no longer depend on undocumented manual procedures.
Please provide your location/ability to work on‑site in Manhattan; relevant commissioning experience; experience with MEA capture, electrolysis/hydrogen, methanation, PLC/HMI, DWSIM, Aspen HYSYS and contractor management; plus availability and hourly rate.
This is a hands‑on on‑site engineering and commissioning position. Remote‑only applicants are not a fit.