Night-Shift HSE Advisor for Data Center Construction

Iris Energy

Childress (TX)

On-site

USD 54,000 - 73,000

Full time

3 days ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

401(k) retirement plan with company-m`

Job summary

Iris Energy is seeking a Health, Safety, and Environmental (HSE) Advisor for its Childress, TX operations. The role focuses on strengthening safety culture, ensuring regulatory compliance, and reducing risk across data center projects.

The candidate will implement HSE programs, conduct risk assessments, and lead safety training and incident investigations, with periodic travel to support regional sites. Competitive benefits are offered.

Qualifications

  • Bachelor’s degree, diploma, or recognized professional certification in Health, Safety, and Environmental (HSE) or related field.
  • Minimum 3 years of HSE experience in construction, utilities, electrical infrastructure, data centers, or industrial operations.
  • Strong understanding of OSHA regulations, environmental compliance principles, and industry best practices.
  • Track record of implementing or supporting structured HSE management systems (ISO 45001/ISO 14001).
  • Exceptional communication skills with the ability to coach, influence, and collaborate at all levels.

Responsibilities

  • Implement and improve the HSE Management System, ensuring practical, risk-based processes.
  • Promote proactive safety culture across a multi-jurisdictional org.
  • Conduct regular HSE risk assessments, hazard evaluations, and inspections.
  • Perform routine audits of safety and environmental programs for OSHA compliance.
  • Support collection, analysis, and reporting of safety indicators to drive improvements.
  • Participate in incident investigations and corrective action development.
  • Collaborate with Site HSE Manager to set health and training objectives.
  • Support pre-task planning and high-risk work protocols such as LOTO and hot work.
  • Provide coaching and safety leadership through toolbox talks and training.
  • Assist with emergency preparedness and drills.

Skills

OSHA regulations
HSE management
Communication
Risk assessment
Hazard identification
Analytical thinking
Construction familiarity
Travel flexibility

Education

Bachelor's in HSE or related field

Tools

Incident management software
Compliance tracking platforms
Training & reporting tools

Job description

Iris Energy is seeking a Health, Safety, and Environmental (HSE) Advisor for its Childress, TX operations. The role focuses on strengthening safety culture, ensuring regulatory compliance, and reducing risk across data center projects.

The candidate will implement HSE programs, conduct risk assessments, and lead safety training and incident investigations, with periodic travel to support regional sites. Competitive benefits are offered.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Night HSE Advisor, Data Center Construction
Night HSE Advisor, Data Center Construction

Iren Group • Childress (TX)

On-site
USD 52,000 - 74,000
Health insurance
Disability insurance
401(k) with company match
+1
Night-Shift HSE Advisor, Construction Safety Leader
Night-Shift HSE Advisor, Construction Safety Leader

Iris Energy • Sweetwater (TX)

On-site
USD 52,000 - 74,000
Health insurance
Disability insurance
401(k) plan
+2
Night HSE Advisor - Construction Safety Lead
Night HSE Advisor - Construction Safety Lead

Iren Group • Sweetwater (TX)

On-site
USD 52,000 - 74,000
Health insurance
Disability insurance
PTO
+1
Data Center Construction Safety Lead
Data Center Construction Safety Lead

Antea Group USA • Childress (TX)

On-site
USD 105,000 - 145,000
Health, dental, and vision plans
Life insurance
Disability benefits
+3
HSE Advisor: Data Center Construction Safety Lead
HSE Advisor: Data Center Construction Safety Lead

5C Group • Springfield (OH)

On-site
USD 100,000 - 120,000
Construction EHS Manager – Data Center Projects
Construction EHS Manager – Data Center Projects

Seneca Resources • Abilene (TX)

On-site
USD 72,000 - 120,000
HSE Advisor Construction (Nights)
HSE Advisor Construction (Nights)

IREN • Childress (TX)

On-site
USD 54,000 - 73,000
401(k) retirement plan with company-m`
Mobile Data Center EHS Leader - Safety & Compliance
Mobile Data Center EHS Leader - Safety & Compliance

Seneca Resources Company, LLC • Abilene (TX)

On-site
USD 108,000 - 132,000
Night-Shift HSSE Advisor — LNG Construction
Night-Shift HSSE Advisor — LNG Construction

Airswift • Port Isabel (TX)

On-site
USD 90,000 - 120,000
Senior Construction Safety Lead - Data Center Projects
Senior Construction Safety Lead - Data Center Projects

HazTek Safety Management • Childress (TX)

On-site
USD 95,000 - 125,000