Location: Remote / Hybrid – United States
Employment Type: Full-Time
Starting Salary: $100,000+ annually, depending on experience
Travel: Occasional travel for project site visits, pre-bid meetings, and field evaluations
ABOUT BYERS INDUSTRIAL SERVICES
Byers Industrial Services is a growing industrial electrical and mechanical contractor specializing in large-scale construction projects throughout the United States.
Our operations support hyperscale data centers, manufacturing facilities, industrial infrastructure, distribution centers, substations, and other mission-critical environments.
As we continue expanding our presence in the data center construction industry, we are seeking an experienced Mechanical Estimator with a strong background in mission-critical mechanical infrastructure, industrial piping, HVAC systems, and complex mechanical construction.
This position offers remote or hybrid work flexibility, with occasional travel to project locations as needed.
POSITION OVERVIEW
The Mechanical Estimator will be responsible for developing accurate, competitive, and comprehensive mechanical construction estimates for large-scale data center and mission-critical projects.
A minimum of five (5) years of direct mechanical estimating experience specifically within data center construction is mandatory.
Priority will be given to candidates with demonstrated estimating experience involving:
- Large-scale chilled water and condenser water piping systems.
- Central utility plants and chiller plants.
- Cooling towers, pumps, heat exchangers, and major mechanical equipment.
- CRAH units and Cooling Distribution Units (CDUs).
- Industrial piping fabrication, welding, and installation.
- Mechanical startup, testing, and commissioning.
The ideal candidate understands the relationship between mechanical system design, material quantities, fabrication requirements, labor productivity, equipment procurement, construction sequencing, and overall project profitability.
This individual will collaborate with executive leadership, project management, procurement, and field operations to evaluate project opportunities, develop detailed cost estimates, prepare competitive bids, and support the continued growth of Byers Industrial Services.
KEY RESPONSIBILITIES
- Develop comprehensive mechanical estimates for hyperscale, colocation, enterprise, and mission-critical data center construction projects.
- Review mechanical drawings, P&IDs, equipment schedules, specifications, bid packages, and construction documents.
- Perform detailed material quantity takeoffs for mechanical equipment, piping systems, fittings, valves, ductwork, insulation, and associated infrastructure.
- Prepare labor estimates based on installation methods, manpower requirements, fabrication needs, productivity expectations, and project schedules.
- Develop detailed cost breakdowns covering labor, materials, equipment, subcontractors, rentals, fabrication, rigging, and project expenses.
- Prepare preliminary project budgets, cost projections, and competitive bid proposals.
- Evaluate RFIs, bid addenda, scope clarifications, subcontractor proposals, and contractual requirements.
- Identify scope gaps, constructability concerns, project risks, and opportunities for cost savings.
- Support value engineering, design-assist activities, and alternative installation methods.
- Assist with change order pricing, budget development, and project cost evaluations.
- Maintain estimating documentation, historical pricing, and bid records.
- Evaluate and estimate complex mechanical systems and equipment, including:
- Chilled water and condenser water piping distribution systems.
- Central utility plants and large-scale cooling infrastructure.
- Industrial and process piping systems.
- Chillers, cooling towers, pumps, and heat exchangers.
- CRAH units, CRAC units, and Cooling Distribution Units (CDUs).
- Direct-to-chip liquid cooling and advanced data center cooling technologies.
- Carbon steel, stainless steel, and specialty piping systems.
- Pipe fabrication, welding, fittings, valves, supports, and hangers.
- Mechanical equipment rigging, hoisting, setting, and installation.
- Mechanical controls and associated infrastructure.
- Testing, flushing, chemical treatment, startup, and commissioning.
- Evaluate long-lead mechanical equipment and procurement requirements.
- Account for equipment lead times and potential impacts on construction schedules.
- Evaluate piping fabrication requirements, welding procedures, material specifications, and installation methods.
- Develop labor estimates based on pipe sizes, material types, joining methods, equipment installation, and field conditions.
- Evaluate manpower availability, overtime requirements, and project-specific labor productivity.
- Identify cost impacts associated with rigging, crane operations, mechanical room congestion, and installation sequencing.
- Account for pressure testing, flushing, chemical treatment, commissioning, QA/QC documentation, and final turnover.
- Evaluate prefabrication and modular construction opportunities to improve installation efficiency.
- Identify financial risks associated with incomplete designs, scope gaps, changing project requirements, and material price fluctuations.
Project Coordination, Contracts & Bid Management
- Collaborate with project managers, construction management, superintendents, procurement personnel, and executive leadership throughout the estimating and bidding process.
- Communicate estimate details, pricing assumptions, scope clarifications, and project requirements to internal teams and clients.
- Obtain and evaluate vendor, supplier, manufacturer, and subcontractor quotations.
- Review construction contracts, bid specifications, and scope exclusions to identify financial and operational risks.
- Assist with bid negotiations, pricing discussions, and contract-related scope clarifications.
- Participate in bid reviews, preconstruction planning meetings, and project handoffs following contract award.
- Coordinate with field leadership to ensure estimates accurately reflect construction conditions and installation requirements.
Travel & Project Site Evaluations
- Participate in occasional project site walks, pre-bid meetings, and field evaluations.
- Travel to active or prospective project locations as necessary to evaluate site conditions and construction requirements.
- Support upcoming data center opportunities in Texas, Indiana, and other locations throughout the United States.
- Coordinate with project management and field operations to identify logistical challenges, labor considerations, and project-specific estimating requirements.
This is primarily a remote or hybrid opportunity and is not intended to be a full-time traveling position. Flexibility for occasional business-related travel is required.
REQUIRED QUALIFICATIONS
- Minimum five (5) years of direct mechanical estimating experience specifically within data center construction. This is mandatory.
- Proven experience preparing mechanical estimates for large-scale data center and mission-critical construction projects.
- Strong technical understanding of industrial mechanical construction, HVAC systems, process piping, and hydronic distribution.
- Experience developing complete mechanical estimates, including material takeoffs, labor projections, equipment costs, subcontractor pricing, fabrication, and project budgets.
- Ability to interpret mechanical drawings, P&IDs, equipment schedules, specifications, and construction documents.
- Knowledge of mechanical construction methods, piping fabrication, welding, labor productivity, installation sequencing, and project scheduling.
- Familiarity with applicable mechanical codes, ASME piping standards, and construction requirements.
- Proficiency in Microsoft Office, particularly Excel, and experience with mechanical estimating or construction management software.
- Strong understanding of cost management, cost control, contract requirements, and construction budgeting.
- Strong communication, organizational, analytical, and problem-solving skills.
- Ability to independently manage multiple bids and meet demanding submission deadlines.
- Willingness to travel occasionally for project site visits, pre-bid meetings, and estimating-related activities.
PRIORITY EXPERIENCE
Candidates with demonstrated estimating experience in the following areas will receive priority consideration:
Chilled Water & Condenser Water Piping
- Large-diameter piping systems, hydronic distribution, pipe fabrication, welding, material takeoffs, and installation labor.
Central Utility Plants
- Chiller plants, cooling towers, pumps, heat exchangers, and large-scale cooling infrastructure.
Mechanical Equipment Installation
- Rigging, hoisting, setting, connecting, and installing chillers, CRAH units, cooling towers, pumps, and associated equipment.
Mechanical Commissioning
- Pressure testing, flushing, cleaning, testing, adjusting and balancing (TAB), equipment startup, Level 4/Level 5 commissioning, and final turnover requirements.
PREFERRED QUALIFICATIONS
- Experience estimating hyperscale, colocation, or enterprise data center construction projects.
- Experience estimating multimillion-dollar mechanical construction packages.
- Experience estimating direct-to-chip liquid cooling systems, Cooling Distribution Units, and advanced cooling infrastructure for AI data centers.
- Previous experience with a mechanical contractor specializing in mission-critical or industrial construction.
- Field experience as a Mechanical Foreman, Pipefitter, Millwright, Mechanical Superintendent, Project Engineer, or Mechanical Project Manager.
- Proficiency with Procore, Bluebeam, Trimble AutoBid Mechanical, FastPIPE, HeavyBid, or comparable mechanical estimating platforms.
- Experience with AutoCAD, Revit, Navisworks, and construction document management software.
- Familiarity with design-build, design-assist, and negotiated construction projects.
- Understanding of prefabrication, modular mechanical systems, and large-scale equipment installation.
- Strong knowledge of procurement lead times, labor loading, manpower planning, and mechanical construction cost controls.
- Experience reviewing construction contracts, subcontractor proposals, and bid negotiations.
WHAT WE'RE LOOKING FOR
We are seeking a highly experienced, detail-oriented Mechanical Estimator with a proven track record of estimating complex mechanical packages for data center construction projects.
Our primary focus is identifying an estimator with extensive experience in chilled water and condenser water piping, central utility plants, major cooling equipment installations, and mechanical commissioning.
The ideal candidate understands the relationship between mechanical system design, material quantities, fabrication requirements, labor productivity, construction sequencing, equipment lead times, and overall project profitability.
Experience with advanced liquid cooling technologies, including direct-to-chip cooling, is highly desirable as the data center industry continues expanding into high-density and AI computing environments.
Applicants must have at least five years of direct mechanical data center estimating experience. General commercial or industrial mechanical estimating experience without the required data center background will not meet the minimum qualifications.
COMPENSATION & BENEFITS
Starting Salary: $100,000+ annually, depending on experience and qualifications.
Byers Industrial Services offers:
- Competitive compensation.
- Remote or hybrid work flexibility.
- Health insurance.
- Vision insurance.
- Life insurance.
- 401(k) with company matching.
- Opportunity to support major data center projects in Texas, Indiana, and additional markets.
- Direct collaboration with company leadership and project management.
- Involvement in large-scale mechanical construction bidding and preconstruction activities.
- Long-term career opportunities and professional growth.
WHY JOIN BYERS INDUSTRIAL SERVICES?
Byers Industrial Services continues to expand its industrial electrical and mechanical construction operations across the United States, with a growing focus on data centers and mission-critical infrastructure.
This position offers the opportunity to contribute to major data center construction projects, work directly with company leadership, and play an important role in developing competitive bids for complex mechanical construction packages.
Join a growing organization and help support the next generation of hyperscale, enterprise, and mission-critical data center infrastructure.
Byers Industrial Services is an Equal Opportunity Employer.