Mechanical Commissioning Engineer (Data Center Construction Experience)

Inpwr, Inc.

Indianapolis (IN)

On-site

USD 70,000 - 110,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

100% Company Paid Insurance
Paid Vacation & Holidays
401(k) Company Match
30-Day Paid Sabbatical Every 5 Years
Stable Employment
Highly Competitive Salary

Job summary

Join a dynamic team at an award-winning electrical design-build firm as a Mechanical Commissioning Engineer. This role involves overseeing the installation and testing of mechanical systems to ensure they meet design specifications. You will collaborate closely with project managers and construction teams, ensuring compliance with safety regulations while documenting the commissioning process. The company values commitment and results, offering a supportive environment for professional growth. If you're ready to take your engineering career to the next level with a company recognized as a top workplace, we want to hear from you!

Qualifications

  • Strong foundation in mechanical engineering principles required.
  • Practical experience with electrical systems and equipment is essential.

Responsibilities

  • Oversee installation, testing, and verification of mechanical systems.
  • Document all aspects of the commissioning process accurately.
  • Provide training to operations and maintenance personnel.

Skills

Mechanical Engineering Principles
HVAC Systems
Problem-Solving Skills
Attention to Detail
Communication Skills
Organizational Skills
Travel Ability

Education

Bachelor of Science in Mechanical Engineering

Tools

CAD
Bluebeam

Job description

InPwr, Inc. is looking for a seasoned Mechanical Commissioning Engineer to join our dynamic team! We are an award-winning electrical design-build firm headquartered in Indianapolis, IN, with offices in Denver, CO, Los Angeles, CA, and Naples, FL. Named a 2019, 2022, 2023, and 2024 Top Places to Work, we believe in building it better, focus on complex opportunities, and taking the electrical design to the next level, with licenses in over forty states and projects across the nation.

We InPwr people through personal commitment, relentless dedication, and driving results together.

Come Join our Team!

Benefits:

  • Medical, Dental, Vision and Life Insurance 100% company paid for employees
  • Paid vacation & holidays
  • 401(k) company match
  • 30-day paid sabbatical every 5 years of employment
  • Stable employment with a growing company
  • Highly competitive salary

A Mechanical Commissioning Engineering role involves overseeing the installation, testing, and verification of mechanical systems and equipment to ensure they are functioning correctly and meet design specifications before they are put into operation.

Essential Functions:

  • Planning and Coordination: Participate in the planning and coordination of commissioning activities, working closely with project managers, design engineers, construction teams, and other stakeholders to ensure that commissioning activities are properly scheduled and executed.
  • Installation Verification: Verify that mechanical systems and equipment are installed according to design specifications, manufacturer's recommendations, and applicable codes and standards. This involves reviewing installation drawings, conducting site inspections, and ensuring proper alignment, assembly, and connections.
  • Functional Testing: Perform functional tests on mechanical systems and equipment to ensure they operate as intended. This may include testing components such as pumps, motors, valves, actuators, HVAC systems, plumbing fixtures, and other mechanical devices to verify their performance and functionality.
  • Performance Testing: Conduct performance tests to verify that mechanical systems meet performance requirements under normal operating conditions as well as during peak loads or other demanding scenarios. This may involve testing parameters such as flow rates, temperatures, pressures, vibration levels, and energy efficiency.
  • Documentation: Document all aspects of the commissioning process, including test procedures, test results, equipment specifications, and any modifications or adjustments made during commissioning. Accurate documentation is essential for compliance, future reference, and handover to operations and maintenance teams.
  • Training: Provide training to operations and maintenance personnel on the proper operation and maintenance of mechanical systems and equipment. This helps ensure that personnel are familiar with the systems they will be responsible for operating and maintaining.
  • Safety Compliance: Ensure that all commissioning activities are conducted in compliance with applicable safety regulations and standards to protect personnel and property. This includes implementing safety procedures, conducting risk assessments, and providing appropriate personal protective equipment (PPE) as needed.
  • Commissioning Reports: Compile commissioning reports summarizing the results of the commissioning process, documenting any issues or deficiencies identified, and providing recommendations for corrective actions or further optimization.
  • The role requires a strong foundation in mechanical engineering principles (BSME), practical experience with electrical systems and equipment, excellent problem-solving skills, attention to detail, and the ability to work effectively in multidisciplinary teams.

Other essential functions:

  • Travel required to different sites. 75% of travel required.
  • Perform a Daily report on site.
  • Be professional in all aspects.
  • Communicate professionally to the GC, EC, and Owner.
  • Oversee meetings, schedules, and testing.
  • Lead the Mechanical job and perform a daily meeting with Owner, GC, EC and others.
  • Mechanical team lead on site.
  • Responsible for expense reports and following company policies.
  • Oversee the QA/QC and commissioning in their area of work.
  • Able to create the Final Building report in conjunction with ECx, MCx and FLS.
  • Strong organizational and documentation skills.

Skills and Requirements:

  • Certificates and Knowledge:
    • Bachelor of Science in Mechanical Engineering.
    • HVAC, CRAC, AHU, ACCU, others.
    • OSHA 10.
    • Complete all Safety Certifications.
    • Script development for L2-L5.
    • Daily Reports.
    • Knowledge of CAD, Bluebeam, and others.
  • Ability to work directly on site, and ability to travel required.

Working/Environment/Physical Demands:

  • Job requires working in all elements, depending on job location, time of year.
  • Must be able to utilize construction site sanitary facilities.
  • Work in restricted areas.
  • Wear personal protective equipment (hard hat, safety glasses always), respirator when required.
  • Able to work 8-10 hours per day, 40-50 hours per week.

EEO, Drug Free Workplace Safety: has always been our priority. Along with the usual protocols to protect our workforce, vendors, and business partners, we’ve implemented additional safety standards, specifically in response to minimizing the possibility of transmission of the COVID-19 virus. Along with CDC recommended guidelines associated with hand-sanitization and safe-distancing, we’ve established procedures to reduce exposure and susceptibility. These include providing personnel with appropriate PPE, limiting non-essential foot traffic, added cleaning protocols, and encouraging open lines of communication for feedback, questions, and concerns. Employment contingent upon successful completion of background investigation and drug screening. Smoke-free workplace. Drug-free work environment according to Federal Law.

InPwr Inc is not currently hiring individuals for this position who now or in the future require sponsorship for employment visa status. Our hiring process includes drug & alcohol screening, E-verify, driving record, and background check. InPwr Inc. is an Equal Opportunity Employer and a Drug-Free Workplace Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, or veteran status.

Visit us at www.inpwrinc.com to apply online!

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Electrical Commissioning Engineer (Data Center Experience)
Electrical Commissioning Engineer (Data Center Experience)

Inpwr, Inc. • Indianapolis (IN)

On-site
USD 110,000 - 140,000
Health benefits
Paid time off
401(k) match
+2
Electrical Project Manager of Commissioning (Data Center Construction Experience)
Electrical Project Manager of Commissioning (Data Center Construction Experience)

Inpwr, Inc. • Indianapolis (IN)

On-site
USD 80,000 - 120,000
Medical, Dental, Vision and Life Insurance 100% company paid
Paid vacation & holidays
401(k) company match
+1
QA/QC Commissioning Agent (Data Center Electrical Construction)
QA/QC Commissioning Agent (Data Center Electrical Construction)

Inpwr, Inc. • Indianapolis (IN)

On-site
USD 60,000 - 100,000
100% Company Paid Medical, Dental, Vision, and Life Insurance
Paid Vacation & Holidays
401(k) Company Match
+3
Electrical Project Manager of Commissioning (Data Center Construction Experience)
Electrical Project Manager of Commissioning (Data Center Construction Experience)

InPwr Inc. • Indianapolis (IN)

On-site
USD 80,000 - 100,000
Medical, Dental, Vision and Life Insurance 100% paid
Paid vacation and holidays
401(k) company match
+3
QA/QC Commissioning Agent (Data Center Construction)
QA/QC Commissioning Agent (Data Center Construction)

InPwr Inc. • United States

On-site
USD 80,000 - 100,000
Medical, Dental, Vision and Life Insurance
Paid vacation & holidays
401(k) company match
+1
Experienced Licensed Senior Commercial Service Electricians
Experienced Licensed Senior Commercial Service Electricians

InPwr Inc. • Fort Myers (FL)

On-site
USD 85,000 - 110,000
Health insurance
Dental insurance
Vision insurance
+6
Experienced Licensed Commercial Field Service Electrician
Experienced Licensed Commercial Field Service Electrician

InPwr Inc. • Indianapolis (IN)

On-site
USD 70,000 - 90,000
100% company-paid Medical, Dental, Vision and Life Insurance
Paid vacation & holidays
401(k) company match
+2
Experienced Licensed Senior Commercial Service Electricians
Experienced Licensed Senior Commercial Service Electricians

Inpwr, Inc. • Fort Myers (FL)

On-site
USD 70,000 - 100,000
Medical, Dental, Vision & Life insured
Paid vacation & holidays
401(k) company match
+3
Experienced Licensed Commercial Field Service Electrician
Experienced Licensed Commercial Field Service Electrician

InPwr Inc. • Dallas (TX)

On-site
USD 70,000 - 90,000
Medical, Dental, Vision and Life保险 100
Paid vacation & holidays
401(k) company match
+1
Experienced Licensed Senior Commercial Service Electrician
Experienced Licensed Senior Commercial Service Electrician

Inpwr, Inc. • Charlotte (NC)

On-site
USD 65,000 - 90,000
Health insurance
Paid time off
401(k) matching
+1