Get a reply from this employer
Your resume and cover letter, tailored to exactly what they’re hiring for.
LINX is hiring Low Voltage Technicians to build out data center cabling infrastructure in El Paso. Roles span Technician I–III with hourly pay between $20 and $29, depending on level and experience.
Responsibilities include installing, terminating, and testing cabling, building MDF/IDF closets, and ensuring compliance with industry standards. Applicants must meet safety and background requirements and be able to work second or third shifts.
If you are unable to complete this application due to a disability, contact this employer to ask for an accommodation or an alternative application process.
Full Time El Paso, TX, US
Salary Range: $20.00 To $29.00 Annually
LINX is hiring Low Voltage Technicians to build out structured cabling infrastructure on active data center construction projects, paying $20.00 to $29.00 an hour depending on level. Whether you're new to the trade or already terminating cable with no supervision, there's a defined path here from Technician I through Technician III and beyond.
This is new-build construction work: running and terminating cable, building out MDF/IDF closets, and testing every run before it's signed off, on a crew that's standing up a data center's cabling infrastructure from the ground up.
Where This Role Fits at LINX
What You'll Be Doing
Closet & Rack Build-Out
Quality & Documentation
Customer & Site Professionalism
Required — Technician I (applies to all levels):
Required — Technician II (all Technician I requirements, plus):
Required — Technician III (all Technician II requirements, plus):
This Role Is Probably Not Right For You If
Preferred
Pay Rate: Tech I: $20.00-$23.00/hour | Tech II: $22.00-$25.00/hour | Tech III: $25.00-$29.00/hour, depending on level and experience
About LINX
Founded in 2003 by working industry practitioners, LINX has grown from a single Denver office into a national commercial low voltage contractor, with active markets around the country.
Our Data Center division builds structured cabling infrastructure for new-build hyperscale and mission critical facilities from the ground up. As LINX's hyperscale project pipeline grows, this is where new technicians start and where the strongest ones build a career, through Technician III and into Lead Technician, Foreman, and beyond.
Equal Opportunity Statement
We are an Equal Opportunity Employer and value diversity in the workplace. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, veteran status, or any other protected characteristic under applicable law.
Posting Deadline
This job posting is open until filled and may close at any time without notice.