Low Voltage Technician – Data Center Construction

LINX

Dallas (TX)

On-site

USD 46,000 - 60,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

401(k) with employer match
Medical, dental, vision insurance
Paid time off
Certification support

Job summary

LINX is hiring Low Voltage Technicians in the Dallas, TX area to install, terminate, and test structured cabling on commercial construction projects. The role offers a clear advancement path from Technician I through Technician III, with ongoing training and certification support.

You will work on diverse sites including corporate offices, hospitals, campuses, and data centers, applying skills for CAT5e/CAT6/CAT6a, fiber, and coax cabling while ensuring safety and quality on every run.

Qualifications

  • Experience in commercial low voltage installation.
  • Ability to terminate and test CAT5e/CAT6/CAT6a, fiber optic, and coaxial cabling systems.
  • Willingness to work 2nd or 3rd shift and pass background checks and drug screen.

Responsibilities

  • Install, terminate, and test structured cabling systems for CAT5e, CAT6, CAT6a, fiber optic, and coaxial cable.
  • Pull, suspend, fireproof, terminate, and test cable runs per BICSI standards and NEC/code.
  • Build and maintain MDFs/IDFs, racks, patch panels, and network hardware; troubleshoot on site.

Skills

Ladder safety
Power tools
Punch-down knowledge
Team collaboration
On-site fault finding

Education

High school diploma

Tools

Fluke DSX-600/8000
Punch-down tools

Job description

Pay: $22.00/ hr (Tech II) to $29.00/ hr (Tech III), depending on tier and experience

LINX is hiring Low Voltage Technicians in the Dallas, TX area to install, terminate, and test structured cabling on commercial construction projects, paying $22.00 to $29.00 an hour depending on tier and experience.

You won't be working the same building every week. LINX's Enterprise division runs cabling into corporate offices, hospitals, K-12 and higher education campuses, small data centers, and other commercial or industrial environments so the work stays varied and the skills you build transfer everywhere. If you already own your tools and know your way around a punch-down block, there's a clear, defined path here from Technician I through Technician III and beyond.

Where This Role Fits at LINX

Technician I → Technician II → Technician III → Lead Technician → Foreman → Superintendent → Project Manager → Senior Project Manager → Operations Manager.

What You'll Be Doing
Cable Installation & Termination
  • Install, terminate, and test structured cabling systems for CAT5e, CAT6, CAT6a, fiber optic, and coaxial cable
  • Pull, suspend, fireproof, terminate, and test cable runs to BICSI standards, NEC, and local code
Closet & Rack Build-Out
  • Build, install, and maintain MDFs and IDFs, including racks, patch panels, wire management systems, and network hardware
  • Troubleshoot low voltage cable systems as issues come up on site
Quality & Documentation
  • Document every installation for compliance with industry standards and project specifications
  • Deliver organized, professional workmanship that meets spec on every run
Customer & Site Professionalism
  • Communicate clearly and professionally with site contacts to resolve technical issues
Minimum Requirements
  • Able to work on ladders and use power tools; able to lift, carry, and set up a 50 pound box or ladder
  • Must own a complete set of personal low voltage hand tools (snips, strippers, screwdrivers, wrenches)
  • Available to work 2nd or 3rd shift, overtime, and under deadline pressure
  • Must pass a 7 year criminal background check, pre-employment drug screen, and physical
  • Valid driver's license, reliable transportation, and current auto insurance
  • Professional working proficiency in English, written and verbal
Required — Technician II (all Technician I Requirements, Plus)
  • 1+ year of commercial low voltage installation experience
  • Able to terminate a jack, pull cable, and work a 90-degree bend proficiently with limited supervision
  • Can install, terminate, and test CAT5e, CAT6, CAT6a, fiber optic, and coaxial cabling systems proficiently, including with Fluke DSX-600/8000 cable certifiers
  • Able to build out MDF and IDF closets — racks, patch panels, wire management, network hardware — with supervision
Required — Technician III (all Technician II Requirements, Plus)
  • 2+ years of commercial low voltage installation experience
  • Able to terminate a jack, pull cable, and work a 90-degree bend proficiently with no supervision
  • Can install, terminate, and test CAT5e, CAT6, CAT6a, fiber optic, and coaxial cabling systems with no supervision
  • Able to build out MDF and IDF closets with no supervision
This Role Is Probably Not Right For You If
  • You don't have experience with commercial construction — this isn't an entry point into the construction industry
  • You're looking for residential or small-office work — this is commercial data center construction, on a crew, to a schedule
  • You'd rather work solo than as part of a crew — Team LINX means making each other better and winning together, not going it alone
Preferred
  • Commercial construction experience
  • BICSI Technician or Installer certification, Copper or Optical Fiber
  • Powder Actuated Tools Certification
  • Confined Space Certification
  • CPR and First Aid certification
  • Manufacturer certifications for installation and maintenance (Fluke, Fujikura, Sumitomo, Corning, Hilti)
  • High school diploma
Compensation & Benefits

Pay Rate:

  • Tech II: $22.00-$25.00/hour
  • Tech III: $25.00-$29.00/hour, depending on level and experience
Benefits
  • 401(k) with 50% employer match on the first 5% contributed
  • Medical, dental, and vision insurance with FSA and HSA options
  • Short and long-term disability coverage
  • 3 weeks PTO (vacation and sick combined)
  • 8 paid holidays
  • Manufacturer training and certification support
  • Structured advancement path from Technician II through Technician III and into Lead Technician
About LINX

Founded in 2003 by working industry practitioners, LINX has grown from a single Denver office into a national commercial low voltage contractor, with active markets around the country.

Our Data Center division builds structured cabling infrastructure for new-build hyperscale and mission critical facilities from the ground up. As LINX's hyperscale project pipeline grows, this is where new technicians start and where the strongest ones build a career, through Technician III and into Lead Technician, Foreman, and beyond.

Equal Opportunity Statement

We are an Equal Opportunity Employer and value diversity in the workplace. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, veteran status, or any other protected characteristic under applicable law.

Posting Deadline

This position will remain open until December 31, 2026 or until filled.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Low Voltage Technician – Data Center Construction
Low Voltage Technician – Data Center Construction

TeamLINX • Dallas (TX)

On-site
USD 30,000 - 40,000
401(k) with employer match
Medical, dental, and vision insurance
Short and long-term disability
+3
Low Voltage Technician – Data Center Construction
Low Voltage Technician – Data Center Construction

SunTalk Solar • Dallas (TX)

Hybrid
USD 30,000 - 40,000
401(k) with 50% match
Medical, dental, and vision insurance
3 weeks PTO (vacation and sick)
+4
Low Voltage Technician – Data Center Construction
Low Voltage Technician – Data Center Construction

Jupiter I, Llc • Dallas (TX)

On-site
USD 46,000 - 60,000
401(k) with match
Medical, dental, and vision insurance
Disability insurance
+4
Low Voltage Technician – Commercial Construction
Low Voltage Technician – Commercial Construction

LINX • Denver (CO)

On-site
USD 42,000 - 60,000
401(k) with company match
Medical, dental, and vision insurance
Disability insurance
+4
Low Voltage Technician – Commercial Construction
Low Voltage Technician – Commercial Construction

Team LINX LLP • Colorado Springs (CO)

On-site
USD 28,000 - 39,000
401(k) match
Medical, dental, and vision insurance
Short and long-term disability
+3
Low Voltage Technician – Commercial Construction
Low Voltage Technician – Commercial Construction

Jupiter I, Llc • Colorado Springs (CO)

On-site
USD 28,000 - 40,000
401(k) with employer match
Medical, dental, and vision insurance
3 weeks PTO and 8 holidays
+1
Low Voltage Cabling Technician
Low Voltage Cabling Technician

LINX • Chantilly (VA)

On-site
USD 28,000 - 40,000
401(k) with employer match
Health insurance
Disability coverage
+2
Low Voltage Technician – Data Center Construction
Low Voltage Technician – Data Center Construction

Team LINX LLP • Cheyenne (WY), Salt Lake City (UT), Cedar Rapids (IA)

On-site
USD 28,000 - 40,000
401(k) with employer match
Medical, dental, and vision insurance
3 weeks PTO
+3
Low Voltage Technician – Data Center Construction
Low Voltage Technician – Data Center Construction

Jupiter I, Llc • El Paso (TX)

On-site
USD 28,000 - 40,000
401k matching
Medical insurance
Dental insurance
+5
Low Voltage Technician – Commercial Construction | Utah
Low Voltage Technician – Commercial Construction | Utah

Jupiter I, Llc • Salt Lake City (UT)

On-site
USD 28,000 - 40,000
401(k) match
Medical insurance
Dental insurance
+2