Low Voltage Foreman – Hyperscale Data Center Construction

Jupiter I, Llc

El Paso (TX)

On-site

USD 62,000 - 79,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

401(k) with employer match
Medical, dental, and vision insurance
3 weeks PTO + 8 holidays
Ongoing technical training

Job summary

LINX is seeking a Full Time Foreman/Lead CraftWorker in El Paso, TX to lead crews on hyperscale data center and commercial construction projects. You will own daily execution of structured cabling, fiber, and low voltage work while training technicians and ensuring safety and quality standards.

You will report to the Project Manager and manage crew productivity, scheduling, and materials, with a focus on delivering on schedule and maintaining client satisfaction on site.

Qualifications

  • 3–5 years of hands-on low voltage/structured cabling experience across copper and fiber.
  • 1–2 years in a field leadership role where you lead crews and ensure quality.
  • Experience with hyperscale data center clients (AWS, Google, Microsoft, etc.).
  • Ability to read construction documents and interpret BOMs and schedules.

Responsibilities

  • Lead a team of low voltage technicians on hyperscale data center and commercial sites, setting daily goals and ensuring productivity.
  • Plan workforce, schedule crews, track timesheets, and coordinate with contract workers when needed.
  • Train technicians in installation methods, equipment operation, safety procedures, and quality standards.
  • Identify on-site personnel issues and escalate to the Superintendent or PM as appropriate.
  • Oversee daily execution of structured cabling and fiber scopes, monitor progress, and manage material staging.

Skills

Low voltage
Crew leadership
Project coordination
Safety compliance
Reading blueprints

Education

BICSI Installer 1 or 2 (preferred)
OSHA 10 or OSHA 30 (preferred)

Tools

Fluke Testers
OTDRs
Bluebeam Revu
Test equipment

Job description

If you are unable to complete this application due to a disability, contact this employer to ask for an accommodation or an alternative application process.

Full Time Forman/Lead CrftWrkr El Paso, TX, US

Salary Range: $30.00 To $38.00 Annually

LINX is hiring a Low Voltage Foreman to lead crews on hyperscale data center and commercial construction projects in the Salt Lake City area. This is a working foreman role — you know the work from the ground up, you can train technicians to do it right, and you're ready to own the daily execution of complex structured cabling and fiber scopes on large, fast-moving jobsites.

You'll report to the Project Manager and serve as the primary field leader on your assigned projects — the person who makes sure the crew is productive, the materials are staged, the quality is right, and the customer sees a professional operation every day.

Pay: $30.00–$38.00/hour based on experience.

What You'll Be Doing
  • Lead a team of low voltage technicians on active hyperscale data center and commercial construction jobsites — setting daily goals, managing productivity, and solving problems in real time
  • Handle workforce planning for your projects — crew scheduling, labor tracking, timesheet completion, and coordination with contract workers when scope requires additional hands
  • Train technicians in installation methods, test equipment operation, safety procedures, and quality standards —you're expected to develop the people on your crew, not just direct them
  • Identify and address personnel issues on-site, escalating to the Superintendent or PM when appropriate
Project Execution & Quality Control
  • Own daily execution of structured cabling, fiber optic, and low voltage infrastructure scopes — high-density fiber optic networks, Cat6A/Cat8, pathway systems, etc.
  • Monitor job progress against schedule daily, track costs using project reporting tools and Bluebeam, and adjust crew deployment and material staging to protect the timeline
  • Manage Moves, Adds, and Changes (MACs) — tracking scope changes for materials and labor accurately and ensuring proper documentation flows to the PM and estimating team
  • Oversee on-site materials management — ordering supplies, coordinating deliveries, managing warehouse communication, and ensuring materials are staged and accounted for
Quality & Safety
  • Operate and interpret results from test equipment including Fluke Testers, OTDR's & power meters — and ensure all test documentation meets project specifications and client standards
  • Lead daily safety compliance on-site — toolbox talks, hazard identification, PPE enforcement, and adherence to site-specific safety plans, particularly the stringent access control and safety requirements common in hyperscale data center environments
  • Conduct quality control checks throughout installation — not just at close-out — and hold your crew to LINX standards at every phase
  • Maintain professional, proactive communication with clients and GCs at your assigned sites — represent LINX as a competent, organized operation every day on site
  • Participate in pre-bid walkthroughs and post-project reviews with Project Managers, Estimating, and Sales
  • Escalate customer concerns, scope conflicts, or schedule risks to the PM immediately—don't let small issues become large ones
Requirements
Experience
  • 3–5 years of hands-on low voltage or structured cabling installation experience, with mastery of installation methods, tools, and quality standards across copper and fiber systems
  • 1–2 years in a field leadership role — Lead Technician, working Foreman, or equivalent — where you were responsible for crew productivity and quality, not just your own work
  • Experience with hyperscale data center clients such as AWS, Google, Microsoft, Meta, OCI etc.
Technical Skills
  • Full mastery of low voltage tools, equipment, and installation processes — you can do everything you're asking your crew to do, and you can teach it
  • Ability to read and interpret construction documents — Scope of Work, Bill of Materials, as-builts, blueprints, and project schedules
  • Proficiency with industry-standard test equipment and the ability to run tests, interpret results, troubleshoot failures, and produce clean documentation
  • Familiarity with project cost tracking and Bluebeam Revu for document management and markup
  • Working knowledge of applicable industry standards - BICSI, Division 27, etc.
Leadership & Communication
  • Demonstrated ability to lead, train, and hold accountable a crew of 10-20 technicians in a fast-paced construction environment
  • Strong written and verbal communication in English — you will interact directly with clients, GCs, and internal teams on a daily basis
  • Ability to manage staffing, scheduling, timesheets, and change order documentation accurately and on time
Logistics
  • Valid driver's license require
Preferred (not required)
  • BICSI Installer 1 or Installer 2 Certification
  • Confined Space Certification
  • OSHA 10 or OSHA 30
  • Manufacturer-specific certifications
  • Ability to travel across the USA for projects
Bonus: Performance-based bonus opportunities available
  • 401(k) with 50% employer match on first 5% contributed
  • Medical, dental, and vision insurance with FSA and HSA options
  • Short and long-term disability coverage
  • 3 weeks PTO (vacation and sick combined)
  • 8 paid holidays
  • Ongoing technical training and certification support
About LINX:

Founded in 2003 by working industry practitioners, LINX has grown across the USA and has completed projects in all 50 states. We design, install, and support commercial network cabling, fiber, AV, security, and wireless systems for data centers, commercial buildings, and mission-critical environments.

Our data center business is active and expanding. The foremen we hire now are building the foundation of a field leadership team that will grow with the company across existing and new markets.

Posting Deadline:

This job posting is open until filled and may close at any time without notice.

We are an equal opportunity/affirmative action employer. We consider candidates regardless of race, color, religion, gender, sexual orientation, gender identity, national origin, disability, or status as a protected veteran, and encourage minorities, females, veterans, and individuals with disabilities to apply.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Low Voltage Foreman – Hyperscale Data Center Construction
Low Voltage Foreman – Hyperscale Data Center Construction

Teamlinx-1 • El Paso (TX)

On-site
USD 41,000 - 52,000
401(k) with employer match
Medical, dental, and vision insurance
PTO 3 weeks
+2
Low Voltage Foreman – Hyperscale Data Center Construction
Low Voltage Foreman – Hyperscale Data Center Construction

LINX • El Paso (TX)

On-site
USD 41,000 - 52,000
401(k) match
Medical, dental, vision insurance
3 weeks PTO
+3
Data Center Foreman - Low Voltage
Data Center Foreman - Low Voltage

Jupiter I, Llc • Dallas (TX)

On-site
USD 41,000 - 52,000
401(k) with employer match
Medical, dental, and vision insurance
Short and long-term disability
+3
Data Center Foreman - Low Voltage
Data Center Foreman - Low Voltage

TeamLINX • Dallas (TX)

On-site
USD 41,000 - 52,000
401(k) match
Medical, dental, and vision insurance
Short and long-term disability
+3
Hyperscale Data Center Low-Voltage Foreman
Hyperscale Data Center Low-Voltage Foreman

Jupiter I, Llc • El Paso (TX)

On-site
USD 62,000 - 79,000
401(k) with employer match
Medical, dental, and vision insurance
3 weeks PTO + 8 holidays
+1
Low Voltage/Commercial Construction Foreman - Travel
Low Voltage/Commercial Construction Foreman - Travel

LINX • Columbus (OH)

On-site
USD 41,000 - 52,000
401(k) with employer match
Medical, dental, vision
3 weeks PTO
+3
Low Voltage/Commercial Construction Foreman - Travel
Low Voltage/Commercial Construction Foreman - Travel

Jupiter I, Llc • Columbus (OH)

On-site
USD 41,000 - 52,000
Per diem
Low Voltage/Commercial Construction Foreman - Travel
Low Voltage/Commercial Construction Foreman - Travel

TeamLINX • Columbus (OH)

On-site
USD 41,000 - 52,000
401(k) with employer match
Medical, dental, and vision
Short/long-term disability
+2
Low Voltage Foreman – Commercial Construction | Salt Lake City
Low Voltage Foreman – Commercial Construction | Salt Lake City

Teamlinx-1 • Salt Lake City (UT)

On-site
USD 56,000 - 79,000
401(k) match
Medical, dental, and vision insurance
Disability insurance
+3
Low Voltage Foreman – Commercial Construction | Salt Lake City
Low Voltage Foreman – Commercial Construction | Salt Lake City

Jupiter I, Llc • Salt Lake City (UT)

On-site
USD 56,000 - 79,000
401(k) with employer match
Medical, dental, and vision insurance
Disability coverage
+3