Low Voltage Foreman – Data Center Construction

Team LINX LLP

Northern (KY)

Hybrid

USD 41,000 - 52,000

Full time

11 hours ago
Be an early applicant
Application generator

A complete application in a minute — tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

401(k) with employer match
Medical, dental, and vision insurance
Short and long-term disability
3 weeks PTO
8 paid holidays
Ongoing training and certifications

Job summary

LINX is hiring a Low Voltage Foreman to lead crews on hyperscale data center and commercial construction projects across the USA. This is a working foreman role where you own the daily execution of structured cabling and fiber scopes on large, fast-moving jobsites.

You will report to the Project Manager as the primary field leader, ensuring crew productivity, proper material staging, and high quality. A strong background in low voltage and leadership is required.

Qualifications

  • 3–5 years hands-on low voltage installation experience across copper and fiber systems.
  • 1–2 years in a field leadership role (foreman or lead technician).
  • Experience with hyperscale data center clients (AWS, Google, Microsoft, Meta, etc.).

Responsibilities

  • Lead a team of low voltage technicians on hyperscale data center and commercial projects, setting daily goals and ensuring productivity.
  • Plan workforce, crew scheduling, labor tracking, timesheets, and coordinate with contract workers as needed.
  • Train technicians in installation methods, safety procedures, and quality standards.
  • Identify and address on-site personnel issues and escalate as needed.
  • Own daily execution of structured cabling, fiber optics, and low voltage infrastructure scopes, and monitor progress against schedule.

Skills

Low voltage installation
Field leadership
Communication
Safety procedures

Tools

Bluebeam Revu
Fluke Testers
OTDR

Job description

Pay: $30.00 – $38.00 + bonus + cell phone allowance

LINX is hiring a Low Voltage Foreman to lead crews on hyperscale data center and commercial construction projects across the USA. This is a working foreman role, you know the work from the ground up, you can train technicians to do it right, and you’re ready to own the daily execution of complex structured cabling and fiber scopes on large, fast-moving jobsites.

You’ll report to the Project Manager and serve as the primary field leader on your assigned projects, the person who makes sure the crew is productive, the materials are staged, the quality is right, and the customer sees a professional operation every day.

Where This Role Fits at LINX

LINX runs a clear field leadership ladder:

This role is the critical bridge between hands-on installation and project-level leadership. Foremen at LINX who perform well move into Superintendent roles as project volume grows, and our pipeline is growing consistently across the USA.

What You’ll Be Doing
  • Lead a team of low voltage technicians on active hyperscale data center and commercial construction jobsites, setting daily goals, managing productivity, and solving problems in real time
  • Handle workforce planning for your projects, crew scheduling, labor tracking, timesheet completion, and coordination with contract workers when scope requires additional hands
  • Train technicians in installation methods, test equipment operation, safety procedures, and quality standards, you’re expected to develop the people on your crew, not just direct them
  • Identify and address personnel issues on-site, escalating to the Superintendent or PM when appropriate

Project Execution & Quality Control

  • Own daily execution of structured cabling, fiber optic, and low voltage infrastructure scopes, high-density fiber optic networks, Cat6A/Cat8, pathway systems, etc.
  • Monitor job progress against schedule daily, track costs using project reporting tools and Bluebeam, and adjust crew deployment and material staging to protect the timeline
  • Manage Moves, Adds, and Changes (MACs), tracking scope changes for materials and labor accurately and ensuring proper documentation flows to the PM and estimating team
  • Oversee on-site materials management, ordering supplies, coordinating deliveries, managing warehouse communication, and ensuring materials are staged and accounted for

Quality & Safety

  • Operate and interpret results from test equipment including Fluke Testers, OTDR’s & power meters, and ensure all test documentation meets project specifications and client standards
  • Lead daily safety compliance on-site, toolbox talks, hazard identification, PPE enforcement, and adherence to site-specific safety plans, particularly the stringent access control and safety requirements common in hyperscale data center environments
  • Conduct quality control checks throughout installation, not just at close-out, and hold your crew to LINX standards at every phase
  • Maintain professional, proactive communication with clients and GCs at your assigned sites, represent LINX as a competent, organized operation every day on site
  • Participate in pre-bid walkthroughs and post-project reviews with Project Managers, Estimating, and Sales
  • Escalate customer concerns, scope conflicts, or schedule risks to the PM immediately, don’t let small issues become large ones

Experience

  • 3–5 years of hands-on low voltage or structured cabling installation experience, with mastery of installation methods, tools, and quality standards across copper and fiber systems
  • 1–2 years in a field leadership role, Lead Technician, working Foreman, or equivalent, where you were responsible for crew productivity and quality, not just your own work
  • Experience with hyperscale data center clients such as AWS, Google, Microsoft, Meta, etc.

Technical Skills

  • Full mastery of low voltage tools, equipment, and installation processes, you can do everything you’re asking your crew to do, and you can teach it
  • Ability to read and interpret construction documents, Scope of Work, Bill of Materials, as-builts, blueprints, and project schedules
  • Proficiency with industry-standard test equipment and the ability to run tests, interpret results, troubleshoot failures, and produce clean documentation
  • Familiarity with project cost tracking and Bluebeam Revu for document management and markup
  • Working knowledge of applicable industry standards, BICSI, Division 27, etc.

Leadership & Communication

  • Demonstrated ability to lead, train, and hold accountable a crew of 10-20 technicians in a fast-paced construction environment
  • Strong written and verbal communication in English, you will interact directly with clients, GCs, and internal teams on a daily basis
  • Ability to manage staffing, scheduling, timesheets, and change order documentation accurately and on time

Logistics

  • Valid driver’s license and auto insurance required
This Role Is Probably Not Right For You If
  • Your low voltage experience is residential construction
  • You don’t have hands-on experience terminating jacks, patch panels, and 66/110 blocks or running Fluke certification tests in the field
  • Your background is IT supervision or help desk without hands-on structured cabling installation experience
  • You’ve never overseen the work of 10+ technicians.
Preferred (not required)
  • BICSI Installer 1 or Installer 2 Certification
  • Confined Space Certification
  • OSHA 10 or OSHA 30
  • Manufacturer-specific certifications

Bonus: Performance-based bonus opportunities available

  • 401(k) with 50% employer match on first 5% contributed
  • Medical, dental, and vision insurance with FSA and HSA options
  • Short and long-term disability coverage
  • 3 weeks PTO (vacation and sick combined)
  • 8 paid holidays
  • Ongoing technical training and certification support
About LINX:

Founded in 2003 by working industry practitioners, LINX has grown across the USA and has completed projects in all 50 states. We design, install, and support commercial network cabling, fiber, AV, security, and wireless systems for data centers, commercial buildings, and mission-critical environments.

Our data center business is active and expanding. The foremen we hire now are building the foundation of a field leadership team that will grow with the company across existing and new markets.

Equal Opportunity Statement

We are an Equal Opportunity Employer and value diversity in the workplace. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, veteran status, or any other protected characteristic under applicable law.

Posting Deadline

This job posting is open until filled and may close at any time without notice.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Data Center Foreman - Low Voltage
Data Center Foreman - Low Voltage

Jupiter I, Llc • Dallas (TX)

On-site
USD 41,000 - 52,000
401(k) with employer match
Medical, dental, and vision insurance
Short and long-term disability
+3
Low Voltage/Commercial Construction Foreman
Low Voltage/Commercial Construction Foreman

LINX • Columbus (OH)

On-site
USD 41,000 - 52,000
Per diem paid
401(k) with match
Medical, dental, vision insurance
Data Center Foreman - Low Voltage
Data Center Foreman - Low Voltage

TeamLINX • Dallas (TX)

On-site
USD 41,000 - 52,000
401(k) match
Medical, dental, and vision insurance
Short and long-term disability
+3
Low Voltage Foreman – Hyperscale Data Center Construction
Low Voltage Foreman – Hyperscale Data Center Construction

LINX • Salt Lake City (UT)

On-site
USD 41,000 - 52,000
401(k) matching
Medical, dental, vision
PTO 3 weeks
+3
Low Voltage Foreman – Hyperscale Data Center Construction
Low Voltage Foreman – Hyperscale Data Center Construction

LINX • El Paso (TX)

On-site
USD 41,000 - 52,000
401(k) match
Medical, dental, vision insurance
3 weeks PTO
+3
Data Center Foreman - Low Voltage
Data Center Foreman - Low Voltage

LINX • Dallas (TX)

On-site
USD 41,000 - 52,000
401(k) with employer match
Medical, dental, vision insurance
Disability coverage
+4
Low Voltage/Commercial Construction Foreman
Low Voltage/Commercial Construction Foreman

Jupiter I, Llc • Columbus (OH)

On-site
USD 41,000 - 52,000
401(k) match
Medical insurance
PTO 3 weeks
+2
Low Voltage Foreman – Hyperscale Data Center Construction
Low Voltage Foreman – Hyperscale Data Center Construction

TeamLINX • El Paso (TX)

On-site
USD 41,000 - 52,000
401(k) with employer match
Medical, dental, and vision insurance
PTO 3 weeks
+2
Low Voltage Foreman – Hyperscale Data Center Construction
Low Voltage Foreman – Hyperscale Data Center Construction

TeamLINX • Salt Lake City (UT)

On-site
USD 41,000 - 52,000
401(k) matching employer contributions
Medical, dental, and vision insurance
3 weeks PTO
+2
Low Voltage Foreman – Hyperscale Data Center Construction
Low Voltage Foreman – Hyperscale Data Center Construction

Jupiter I, Llc • El Paso (TX)

On-site
USD 62,000 - 79,000
401(k) with employer match
Medical, dental, and vision insurance
3 weeks PTO + 8 holidays
+1