Lead Construction Scheduler – CPM & Multi-Project

Brasfield & Gorrie

South Carolina

Hybrid

USD 70,000 - 100,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Brasfield & Gorrie, L.L.C. is seeking a Planner/Scheduler to collaborate with preconstruction, project management, and field teams on developing and managing project schedules. Projects are based in Charleston, SC or Savannah, GA.

Responsibilities include leading detailed schedule development, tracking progress, and analyzing delays. The role requires 3+ years in construction scheduling, CPM software proficiency, and strong communication skills; travel or relocation may be required.

Qualifications

  • Bachelor's degree in Construction Management, Engineering, or related field is preferred.
  • Minimum 3 years of scheduling experience on construction projects preferred.
  • Cost and resource loading required.
  • Knowledge of critical path method scheduling (CPM).
  • Strong written and oral communication skills.
  • Experience using CPM scheduling software.
  • Familiarity with claims prevention and analysis techniques strongly preferred.
  • Ability to conduct constructability reviews for varying construction methods during design or construction.

Responsibilities

  • Lead the development of detailed project schedules with input from project teams.
  • Collect project progress and update project status.
  • Perform impact analysis for potential delays and changes.
  • Work with project management and field teams to set project goals and analyze status.
  • Analyze schedules for duration and logic issues.
  • Manage schedules for multiple/large projects.
  • Provide guidance to junior schedulers.
  • Travel and/or relocation may be necessary depending on project needs and location.

Skills

Strong communication
CPM scheduling software
Critical path method
Constructability reviews
Claims prevention and analysis

Education

Bachelor’s degree in Construction Management or Engineering

Tools

CPM scheduling software

Job description

Responsibilities

Brasfield & Gorrie is looking for a Planner/Scheduler will work closely with our preconstruction, project management, and field teams as well as with subcontractors and owners’ representatives to aid in the development and management of project schedules to ensure the success of our projects. This position will be working on Projects based in Charleston, SC or Savannah, GA.

Responsibilities and Essential Duties include the following (other duties may be assigned):

  • Lead the development of detailed project schedules along with project teams’ input
  • Collect project progress and updating project status
  • Performing impact analysis for potential delays and changes
  • Work with the project management and field teams to help set project goals and analyze the status of the project
  • Analyze the schedules to determine duration and logic issues
  • Ability to manage schedules for multiple projects and/or more complex projects, larger in size
  • Provide guidance to less experienced members of the scheduling team
  • Perform other duties as assigned
  • Travel and/or relocation may be necessary depending on the project needs and location

Education - Skills - Knowledge - Qualifications & Experience

Education/Qualifications/Experience/Skills:

  • Bachelors degree in Construction Management, Engineering, or related field is preferred
  • Minimum 3 years of experience in scheduling for construction projects preferred
  • Cost and resource loading required
  • Knowledge of critical path method of scheduling
  • Strong written and oral communication skills
  • Experience using CPM scheduling software
  • Familiarity with claims prevention and analysis techniques strongly preferred
  • Ability to conduct constructability reviews for varying construction method/techniques during design or construction

The above description covers the principal duties and responsibilities of the job. The description shall not, however, be construed as a complete listing of all miscellaneous, incidental, or similar duties which may be required from day-to-day. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions. EOE/Vets/Disabilities

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Strategic Construction Scheduler & Lead Planner
Strategic Construction Scheduler & Lead Planner

Brasfield & Gorrie • North Charleston (SC), Savannah (GA)

On-site
USD 65,000 - 90,000
Construction Scheduler
Construction Scheduler

Brasfield & Gorrie • North Charleston (SC), Savannah (GA)

On-site
USD 65,000 - 90,000
Construction Scheduler
Construction Scheduler

Brasfield & Gorrie • South Carolina

On-site
USD 70,000 - 100,000
Onsite Construction Scheduler – Lead Multi-Project Timelines
Onsite Construction Scheduler – Lead Multi-Project Timelines

Brasfield & Gorrie • Atlanta (GA)

Hybrid
USD 85,000 - 115,000
Construction Scheduler: Lead Multi-Project Scheduling
Construction Scheduler: Lead Multi-Project Scheduling

Brasfield & Gorrie • Winter Park (FL)

On-site
USD 75,000 - 110,000
Assistant Planner & Scheduler - Build Key Project Schedules
Assistant Planner & Scheduler - Build Key Project Schedules

Brasfield & Gorrie • Dallas (TX)

Hybrid
USD 60,000 - 85,000
Assistant Planner & Scheduler: Shape Construction Schedules
Assistant Planner & Scheduler: Shape Construction Schedules

Brasfield & Gorrie • Nashville (TN)

Hybrid
USD 50,000 - 80,000
Construction Scheduler
Construction Scheduler

Brasfield & Gorrie • Atlanta (GA)

On-site
USD 90,000 - 130,000
Construction Scheduler
Construction Scheduler

Brasfield & Gorrie • Atlanta (GA)

Hybrid
USD 85,000 - 115,000
Construction Scheduler
Construction Scheduler

Brasfield & Gorrie, LLC • Charlotte (NC)

On-site
USD 70,000 - 100,000