A complete application in a minute
Tailored resume and cover letter, ready to send.
TAR is building the world’s first off-grid power plant for data centers powered by renewables. As an IOT Engineer, you will design the IT/OT network and integrate vendor equipment into a single, verifiable data model, ensuring reliability as the island transitions modes and loads.
You will test and maintain the network for the life of the site. The role emphasizes cross-vendor protocol integration, latency budgeting, and strong cybersecurity practices, with on-site work required to install and
TAR’s mission is to power intelligence for the world. We are building the world’s first off-grid power plant for data centers powered by renewable technologies.
We firmly believe AI should be built in the US for the benefit of all people. For that, power must be fast, clean and scalable. We are singularly focused on delivering GW-scale power faster than anyone has ever done, by rethinking every layer of the stack.
To deliver on this vision, TAR manufactures, deploys and operates off-grid energy assets with a renewable backbone. We vertically integrate to solve every bottleneck, from racking systems to power electronics to dispatch algorithms to on-site construction.
Leave your mark by powering the future of civilisation-scale energy infrastructure.
We hire people who care deeply about this problem space.
We are a team of seasoned operators run by founders who previously scaled a company to over 80 people and $350M in annual sales. We know how to operate and we move fast.
We are working directly with one of the largest compute providers to make our vision come true and plan to deploy 5GWs by 2028.
TAR is both a hardware and software company, we are building out massive, critical, physical infrastructure.
As an IOT Engineer, you build the network that runs the island, and the standard that makes the next island faster. You design the IT/OT network and communications architecture, integrate every vendor's equipment into one coherent point database, verify all of it point by point before the plant carries load, and then keep it running for the life of the site. When the island transitions modes at 3 a.m. with a data center on the other side of the bus, it works because you tested it.