Get a reply from this employer
Your resume and cover letter, tailored to exactly what they’re hiring for.
TAR is building the world’s first off-grid power plant for data centers powered by renewables. The Electrical Design Engineer will own electrical design documentation: single-line and three-line diagrams, wiring schedules, and system schematics for islanded BTM microgrids.
You size the system, conductors, OCPD, disconnects, and switchgear across MV, LV, and DC collection, and you produce the technical inputs and basis-of-design the Engineer of Record stamps against.
TAR’s mission is to power intelligence for the world. We are building the world’s first off-grid power plant for data centers powered by renewable technologies.
We firmly believe AI should be built in the US for the benefit of all people. For that, power must be fast, clean and scalable. We are singularly focused on delivering GW-scale power faster than anyone has ever done, by rethinking every layer of the stack.
We vertically integrate to solve every bottleneck, from racking systems to power electronics to dispatch algorithms to on-site construction.
Leave your mark on the future of civilization-scale energy infrastructure.
TAR is both a hardware and software company, we are building out massive, critical, physical infrastructure. TAR is working directly with one of the largest compute providers to scale and deploy 5GWs by 2028.
As Electrical Design Engineer, you own the electrical design documentation that turns architecture into a buildable plant: single-line and three-line diagrams, wiring schedules, and system schematics for islanded BTM microgrids. You size the system, conductors, OCPD, disconnects, and switchgear across MV, LV, and DC collection, and you produce the technical inputs and basis-of-design the Engineer of Record (EOR) stamps against. You work day-to-day under the Director of Power Systems Engineering, translating system architecture into the drawing set that procurement, the EOR, and the field all build from.
One scope note on what this role is and is not. We integrate utility-scale equipment and run an external Engineer of Record as our engineering-of-record agent. You own the design basis, the drawing set, and design quality and turnaround, and you coordinate the EOR's review and stamp; you are not the project's stamping engineer of record. You also are not laying out controls logic, which sits with the controls engineer; you produce the electrical design those controls integrate into.