Injection Molding Technician: Growth, Overtime, Impact

Colorado Wholesale Group, Inc

Georgia

Presencial

USD 30.000 - 44.000

Jornada completa

14 días+

Una candidatura completa en un minuto

Currículum y carta de presentación personalizados, listos para enviar.

Supera los filtros ATS

Ventajas ofrecidas por este puesto de trabajo

Competitive hourly pay
Overtime opportunities
Growth potential
Clean, organized environment

Descripción de la vacante

Pro Tools Now is seeking an Injection Molding Technician to support daily operations in a growing manufacturing environment. You will set up molding machines, install molds, and adjust process parameters to maintain high-quality outputs.

The role requires 2+ years of hands-on experience, strong troubleshooting, and the ability to read blueprints and process documents. You’ll collaborate with production, quality, and engineering to improve processes while following safety standards.

Formación

  • 2+ years as an Injection Molding Technician or equivalent.
  • Knowledge of thermoplastics, molds, and molding processes.
  • Ability to read blueprints, process sheets, and work instructions.
  • Mechanical aptitude with strong troubleshooting skills.
  • Ability to lift up to 50 lbs and stand for long periods.
  • High school diploma or GED; technical training or certifications a plus.

Responsabilidades

  • Set up, start up, and shut down molding machines and auxiliary equipment.
  • Install and remove molds, including proper clamping, water, air, and electrical connections.
  • Adjust process parameters to optimize part quality and cycle efficiency.
  • Troubleshoot molding defects such as short shots, flash, sinks, warpage, and burns.
  • Perform routine machine and mold maintenance; identify and report larger repair needs.
  • Maintain accurate documentation of setups, process changes, and production data.

Conocimientos

Plastic molding
Blueprint reading
Troubleshooting
Mechanical aptitude
Safety compliance

Educación

High school diploma or GED
Technical training/certifications

Herramientas

Dryers
Chillers
Loaders
Conveyors
Robots

Descripción del empleo

Pro Tools Now is seeking an Injection Molding Technician to support daily operations in a growing manufacturing environment. You will set up molding machines, install molds, and adjust process parameters to maintain high-quality outputs.

The role requires 2+ years of hands-on experience, strong troubleshooting, and the ability to read blueprints and process documents. You’ll collaborate with production, quality, and engineering to improve processes while following safety standards.

Consigue la evaluación confidencial y gratuita de tu currículum.

o arrastra y suelta tu archivo aquí

Similar jobs

Puestos de trabajo similares que vale la pena comparar

Injection Molding Technician I – Growth, Impact, Overtime
Injection Molding Technician I – Growth, Impact, Overtime

MILWAUKEE ELECTRIC TOOL • Cookeville (TN)

Presencial
USD 23.000 - 32.000
Injection Molding Technician
Injection Molding Technician

Accelera Staffing • Buffalo (NY)

Presencial
USD 25.000 - 36.000
Injection Molding Technician – Training & Growth
Injection Molding Technician – Training & Growth

Drive • Charlotte (MI)

Presencial
USD 52.000 - 66.000
Senior Process Technician (Injection Molding)
Senior Process Technician (Injection Molding)

Accentuate Staffing • Oxford (NC)

Presencial
USD 25.000 - 39.000
Process Technician
Process Technician

Surge Staffing • Bryan (TX)

Presencial
USD 42.000 - 65.000
Injection Molding Processing Technician
Injection Molding Processing Technician

Walbro • Grand Rapids (MI)

Presencial
USD 52.000 - 64.000
Health Insurance
Dental Insurance
Vision Insurance
+4
Injection Molding Technician - Process & Equipment Pro
Injection Molding Technician - Process & Equipment Pro

Advanced Powder Products, Inc. • Philipsburg

Presencial
USD 52.000 - 72.000
Paid time off
Paid holidays
401k with company match
+8
Process Technician - Injection Molding (Trainable, Fast-Paced)
Process Technician - Injection Molding (Trainable, Fast-Paced)

Drive • Charlotte (MI)

Presencial
USD 42.000 - 64.000
Process Technican - 3rd shift
Process Technican - 3rd shift

Aptyx • Torrington (CT)

Presencial
USD 45.000 - 65.000
Process Technician - Injection Molding
Process Technician - Injection Molding

Link Staffing • Texas

Presencial
USD 36.000 - 44.000
Competitive pay
Overtime available
Growth opportunities