Hiring Electricians – Texas Data Center Construction

Tarpon Specialty Services

Midland (TX)

On-site

USD 39,000 - 58,000

Full time

7 days ago
Be an early applicant
Application generator

Stand out for this role — generate a tailored resume and cover letter in about a minute.

Get past ATS filters

Benefits offered by this job

Per diem
Travel provisions

Job summary

Tarpon Specialty Services is recruiting industrial electricians for data center projects across Texas. This is travel/rotation work, not a Midland position.

We seek candidates from Midland, Big Spring, Stanton, Greenwood, Garden City and the Midland side of the Permian Basin with conduit, terminations and general electrical construction experience. Data center work is a bonus, not required for every role.

Qualifications

  • Current Texas electrical license or registration (TDLR).
  • Proven industrial or commercial electrical construction experience.
  • Ability to pass project hiring and site requirements.
  • Willing to travel, work overtime and run extended schedules.

Responsibilities

  • Rigid, IMC, EMT and PVC conduit – bending and installation.
  • Cable tray, raceway, wire and cable pulls, terminations.
  • Switchgear, electrical distribution, transformers, panels.
  • Generator and UPS / backup-power systems.
  • Grounding and bonding.
  • Motor controls, control wiring, low-voltage and fiber.
  • Reading one-lines, prints and electrical drawings.
  • Testing, commissioning and startup.

Skills

Texas Electrical License
Industrial/Commercial Construction
Willing to Travel
Overtime Availability

Job description

Midland Electricians: Texas Data Centers Are Hiring

Job sites are at data center projects across Texas. This is travel/rotation work, not a Midland position.


Tarpon Specialty Services is recruiting industrial electricians from Midland, Big Spring, Stanton, Greenwood, Garden City and the Midland side of the Permian Basin for critical-power construction at Texas data centers. If you have run conduit and terminated gear at plants, gas processing facilities, refineries, compressor stations or pipeline sites, you already have the skill set these projects need. Data center experience is a bonus, not a requirement for every position.


Why Oilfield Electricians Fit This Work


  • Large industrial scope – switchgear, transformers, generators, grounding, controls

  • Long-duration projects with heavy hours, similar to plant construction

  • Rotation and travel schedules you are already used to

  • Multiple Texas sites underway – steady work from project to project


Positions


  • Journeyman Electricians

  • Electrical Foremen / Lead Electricians

  • Apprentice Electricians

  • Industrial and commercial electricians


Typical Assignments


  • Rigid, IMC, EMT and PVC conduit – bending and installation

  • Cable tray, raceway, wire and cable pulls, terminations

  • Switchgear, electrical distribution, transformers, panels

  • Generator and UPS / backup-power systems

  • Grounding and bonding

  • Motor controls, control wiring, low-voltage and fiber

  • Reading one-lines, prints and electrical drawings

  • Testing, commissioning and startup


Must Have


  • Current Texas electrical license or registration (TDLR)

  • Proven industrial or commercial electrical construction experience

  • Ability to pass project hiring and site requirements

  • Willing to travel, work overtime and run extended schedules

  • Reliable transportation and dependable attendance

  • Safety-minded, quality-focused craftsmanship


Pay & Terms


  • Competitive hourly rates by license level and experience

  • Overtime

  • Per diem and travel provisions for qualified out-of-area hands discussed at offer

  • Immediate and upcoming starts


Crews

Foremen running a crew can apply as a group. We are building a large electrical workforce and welcome established teams.


Tarpon Specialty Services – Staffing Texas data center electrical construction.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Electricians – Texas Data Center Construction | Now Hiring
Electricians – Texas Data Center Construction | Now Hiring

Tarpon Specialty Services • Abilene (TX)

On-site
USD 34,000 - 62,000
Now Hiring Electricians – Texas Data Center Projects
Now Hiring Electricians – Texas Data Center Projects

Tarpon Specialty Services • Lubbock (TX)

On-site
USD 34,000 - 55,000
Hiring Multiple Electricians – Texas Data Center Construction Jobs
Hiring Multiple Electricians – Texas Data Center Construction Jobs

Tarpon Specialty Services • Odessa (TX)

On-site
USD 34,000 - 55,000
Travel per diem
Long-term work
Competitive wages
Texas Data Center Electrician — Travel/Rotation Roles
Texas Data Center Electrician — Travel/Rotation Roles

Tarpon Specialty Services • Midland (TX)

On-site
USD 39,000 - 58,000
Per diem
Travel provisions
Electrician , Foreman, Plant
Electrician , Foreman, Plant

Energy Job Shop • Houston (TX)

On-site
USD 34,000 - 55,000
Competitive wages
Overtime opportunities
Per diem
+1
Electrician , Plant
Electrician , Plant

Energy Job Shop • Amarillo (TX)

On-site
USD 39,000 - 55,000
Contract position
Data center project experience
Advanced electrical systems experience
+1
Data Center Electrician Foreman - Per Diem & Long-Term
Data Center Electrician Foreman - Per Diem & Long-Term

Energy Job Shop • Houston (TX)

On-site
USD 34,000 - 55,000
Competitive wages
Overtime opportunities
Per diem
+1
Traveling Data Center Electrician – Journeyman/Lead
Traveling Data Center Electrician – Journeyman/Lead

Tarpon Specialty Services • Odessa (TX)

On-site
USD 34,000 - 55,000
Travel per diem
Long-term work
Competitive wages
Industrial Electricians
Industrial Electricians

Tarpon Specialty Services • Corpus Christi (TX)

On-site
USD 70,000 - 100,000
Competitive pay based on experience
$500 Sign-On Bonus
Company-paid lodging for out-of-area hires
+3
Data Center Electrician – Large TX Projects (Overtime)
Data Center Electrician – Large TX Projects (Overtime)

Tarpon Specialty Services • Abilene (TX)

On-site
USD 34,000 - 62,000