Get a reply from this employer
Your resume and cover letter, tailored to exactly what they’re hiring for.
Eastern Panhandle Instructional Cooperative is seeking a Part-time Head Start/Pre-K Bus Aide to support Morgan County routes with a flexible split shift schedule. The role requires a positive attitude, safety awareness, and the ability to assist the bus driver and Pre-K students on assigned runs.
Hours vary for the 2025-2026 school year; starting times around 6:45 AM to 9:15 AM and 1:30 PM to 4:00 PM with travel between sites.
Eastern Panhandle Instructional Cooperative is seeking a Part-time Head Start/Pre-K Bus Aide to support Morgan County routes with a flexible split shift schedule. The role requires a positive attitude, safety awareness, and the ability to assist the bus driver and Pre-K students on assigned runs.
Hours vary for the 2025-2026 school year; starting times around 6:45 AM to 9:15 AM and 1:30 PM to 4:00 PM with travel between sites.