Field-Based Gas Turbine Installation Manager

GTN Technical Staffing

United States

Vor Ort

USD 120.000 - 170.000

Vollzeit

Vor 5 Tagen
Sei unter den ersten Bewerbenden

Erhalte eine Antwort von diesem Arbeitgeber

Dein Lebenslauf und dein Anschreiben, genau auf das zugeschnitten, was gesucht wird.

Schaffe es an den ATS-Filtern vorbei

Zusammenfassung

GTN Technical Staffing is recruiting for a Manager – Gas Turbine Power Generation to lead field installation and delivery of LM6000 gas turbine packages for data center campuses. This onsite role requires coordinating turbine delivery, offloading, rigging, placement, and startup with multiple contractors and OEMs.

The ideal candidate has direct field experience installing LM6000 or similar aeroderivative turbines, strong leadership, and the ability to manage interfaces with engineering,

Qualifikationen

  • 5+ years delivering gas turbine or large rotating equipment installations.
  • 3+ years in power generation, industrial, or critical infrastructure new construction.
  • Direct gas turbine or power generation construction experience.
  • Experience installing LM6000 or comparable aeroderivative gas turbines.
  • Owner’s representative or enforcing technical standards in GC-led projects.
  • Proficiency with Bluebeam, Autodesk, or comparable construction tools.
  • Knowledge of ASME B31.1/B31.3 and NFPA 37/850.
  • Strong communication and cross-team coordination.

Aufgaben

  • Oversee turbine delivery, offloading, rigging, placement, alignment and related installation activities.
  • Coordinate work across contractors, OEMs, and subcontractors to ensure interfaces align with engineering.
  • Verify installation sequencing and piping systems meet design requirements.
  • Monitor fuel gas, lube oil, exhaust, cooling, and balance-of-plant piping installation.
  • Track delivery, startup readiness, and acceptance milestones; align with project schedule.
  • Coordinate with commissioning teams for startup readiness and handover.

Kenntnisse

Gas turbine project delivery
Power generation construction
Owner’s representative experience
Team coordination
Field judgment & issue management

Ausbildung

Bachelor’s degree in Construction Management or Mechanical Engineering

Tools

Bluebeam
Autodesk

Jobbeschreibung

GTN Technical Staffing is recruiting for a Manager – Gas Turbine Power Generation to lead field installation and delivery of LM6000 gas turbine packages for data center campuses. This onsite role requires coordinating turbine delivery, offloading, rigging, placement, and startup with multiple contractors and OEMs.

The ideal candidate has direct field experience installing LM6000 or similar aeroderivative turbines, strong leadership, and the ability to manage interfaces with engineering,

Hol dir deinen kostenlosen, vertraulichen Lebenslauf-Check.

oder ziehe deine Datei hierhin.

Similar jobs

Ähnliche Jobs, die dir auch gefallen könnten

Gas Turbine Installation Manager
Gas Turbine Installation Manager

GTN Technical Staffing • USA

Vor Ort
USD 120.000 - 170.000
Senior Mechanical Startup Lead - LM6000 Turbines
Senior Mechanical Startup Lead - LM6000 Turbines

ProEnergy Services • Chicago (IL)

Vor Ort
USD 120.000 - 160.000
Gas Turbine Project Manager — Delivery & Optimization
Gas Turbine Project Manager — Delivery & Optimization

American Jereh International Corporation • Houston (TX)

Vor Ort
USD 90.000 - 140.000
Industrial Gas Turbine Operations Supervisor
Industrial Gas Turbine Operations Supervisor

Mechanical-Dynamics- • Houston (TX)

Vor Ort
USD 90.000 - 130.000
Industrial Gas Turbine Operations Supervisor
Industrial Gas Turbine Operations Supervisor

Mdaturbines • Houston (TX)

Vor Ort
USD 90.000 - 120.000
Manager of Controls Engineering – Gas Turbines
Manager of Controls Engineering – Gas Turbines

Liberty Personnel Services, Inc. • Texas

Hybrid
USD 120.000 - 180.000
Project Manager - Gas Turbines
Project Manager - Gas Turbines

Jereh North America Group • Houston (TX)

Vor Ort
USD 90.000 - 160.000
Senior Gas Turbine Project Engineer
Senior Gas Turbine Project Engineer

MHI RJ Aviation Group • Florida

Vor Ort
USD 120.000 - 180.000
Medical, Dental, Vision & 401KMatching
Tuition reimbursement and on-the-job培训
Paid vacation, sick time, and holidays
+3
Aero Derivative Gas Turbine Field Technician – Travel
Aero Derivative Gas Turbine Field Technician – Travel

Fieldcore • USA

Remote
USD 41.000 - 67.000
GT Layout Design Engineer, System Integration
GT Layout Design Engineer, System Integration

Open Scientific • West Palm Beach (FL)

Vor Ort
USD 120.000 - 150.000
Top-notch benefits
A+ work environment