Fabrication Planner- Weekend 2nd Shift in Norman

Energy Jobline ZR

Norman (OK)

On-site

USD 55,000 - 75,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Bosch is seeking a Production Scheduling professional in the United States to translate the Master Production Schedule into actionable weekly and daily plans. You will coordinate with Materials, Manufacturing, and Engineering to secure timely parts and maintain optimal inventory levels.

You will communicate changes, monitor schedule adherence, and support ERP-driven process improvements across departments to maximize efficiency and customer satisfaction.

Qualifications

  • Two-year degree with 1–3 years material management experience in manufacturing.
  • Mechanical and analytical ability required.
  • If no two-year degree, add 3 years related experience.
  • Proficiency in Microsoft Suite applications.
  • MRP/ERP experience (SAP).
  • APICS CPIM or CSCP certification required.

Responsibilities

  • Create weekly/daily production schedules from the Master Production Schedule to minimize inventory and maximize productivity and customer service.
  • Communicate schedule changes clearly to production personnel with impacts.
  • Ensure schedule attainment, adherence, and Inventory DOH meet plant measures.
  • Collaborate with Materials Manager to maintain capacity requirements for the master schedule.
  • Coordinate with Supplier Scheduling, Manufacturing, Quality, and Engineering to ensure timely material availability.
  • Maintain replenishment signals in the ERP system for smooth material flow and efficiency.
  • Oversee daily production support, setting priorities and addressing supply issues.
  • Maintain effective interdepartmental communication and relationships.
  • Support changes to Scheduling and Inventory Control processes for ERP.

Skills

Mechanical aptitude
Analytical ability

Education

Two-year degree in related field
APICS CPIM/CSCP certification

Tools

SAP ERP
Microsoft Office

Job description

Job DescriptionJob DescriptionCompany Description


We Are Bosch.


At Bosch, we shape the future by inventing high-quality technologies and services that spark
enthusiasm and enrich people's lives. Our areas of activity are every bit as diverse as our outstanding
Bosch teams around the world. Their creativity is the key to innovation through connected living,
mobility, or industry.


Let's grow together, enjoy more, and inspire each other.Work #LikeABosch



  • Reinvent yourself:At Bosch, you will evolve

  • Discover new directions:At Bosch, you will find your place

  • Balance your life:At Bosch, your job matches your lifestyle

  • Celebrate success:At Bosch, we celebrate you

  • Be yourself:At Bosch, we value values

  • Shape tomorrow:At Bosch, you change lives


Job Description


  • Using the output of the Master Production Schedule (MPS), create weekly and daily production schedules which result in production plans that minimize inventory investment, maximize productivity, and maximize customer service levels.

  • Provides timely, complete, and concise communication to production personnel regarding schedule changes or revisions that have immediate or long-range impact.

  • Ensures that schedule attainment, adherence, and Inventory DOH are met in accordance with plant level performance measures.

  • Collaborate with Materials Manager to maintain capacity requirements plan that supports the master schedule.

  • Coordinates with Supplier Scheduling, Manufacturing, Quality, and Engineering to assure that materials are on site in a timely manner to facilitate speedy and accurate parts availability to meet customer demands.

  • Maintains replenishment signals within the ERP system for manufactured items to assure a smooth flow of materials and enable operational efficiency.

  • Manages daily support of production needs such as setting priorities and addressing supply issues.

  • Maintains effective working relationship and communication with all departments.

  • Support changes of Scheduling and Inventory Control processes required for ERP

  • Participate in the clear-to-build meetings adjusting the production schedule where necessary.

  • Other Duties as assigned.


Qualifications


  • This position requires a two-year degree in an appropriate field of study with one (1) to three (3) years material management experience in a manufacturing environment.

  • Normal mechanical and analytical ability is a must.

  • In the absence of a 2-year degree in an appropriate field of study, this position requires an additional three (3) years of related experience.

  • Proficiency in Microsoft Suite Applications

  • Extended knowledge of MRP and ERP experience required. (SAP )

  • APICS Certification in CPIM, or CSCP .


Additional Information

Indefinite U.S. work authorized individuals only. Future sponsorship for work authorization is not available.


Equal Opportunity Employer, including / veterans


*Bosch adheres to Federal, State, and Local laws regarding drug-testing. Employment is contingent upon the successful completion of a drug screen and background check. Candidates who have been offered the position must pass both screenings before their start date.


Your well-being matters at Bosch! We offer a competitive compensation and a benefits package designed to empower you in every area of your life. This includes premium health coverage, a 401(k) with generous matching, resources for financial planning and goal setting, ample paid time off, parental leave, and comprehensive life and protection. We're investing in your success!

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Fabrication Planner- Weekend 1st Shift
Fabrication Planner- Weekend 1st Shift

Bosch • Norman (OK)

On-site
USD 65,000 - 85,000
Fabrication Planner- Weekend 2nd Shift
Fabrication Planner- Weekend 2nd Shift

Bosch • Norman (OK)

On-site
USD 52,000 - 75,000
Fabrication Planner- Weekend 1st Shift
Fabrication Planner- Weekend 1st Shift

Bosch-HomeComfort • Norman (OK)

On-site
USD 65,000 - 90,000
Global Logistics & Production Planner
Global Logistics & Production Planner

Bosch Group • Florence (KY)

On-site
USD 65,000 - 90,000
Advanced Material Handler - 2nd shift
Advanced Material Handler - 2nd shift

Bosch-HomeComfort • Park City (KS)

On-site
USD 32,000 - 42,000
Premium health coverage
401(k) with generous matching
Paid time off
+2
Production Supervisor II
Production Supervisor II

Bosch Home Comfort Group • Wichita (KS)

On-site
USD 65,000 - 90,000
Premium health coverage
401(k) with generous matching
Paid time off
+2
Planning Expeditor
Planning Expeditor

Bosch Home Comfort Group • Norman (OK)

On-site
USD 52,000 - 75,000
premium health coverage
a 401(k) with generous matching
resources for financial planning and?g
Material Planner
Material Planner

Robert Bosch Group • Pineville (NC)

On-site
USD 65,000 - 90,000
Health coverage
401(k) with generous matching
Paid time off
+2
Bosch Production System BPS Manager
Bosch Production System BPS Manager

Bosch-HomeComfort • Norman (OK)

On-site
USD 90,000 - 130,000
Material Planner
Material Planner

Robert Bosch Group • Albion (IN)

On-site
USD 65,000 - 90,000
Health insurance
401(k) with company match
Paid time off
+2