Fabrication Planner- Weekend 2nd Shift

Bosch

Norman (OK)

On-site

USD 52,000 - 75,000

Full time

42 hours ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Bosch is seeking a Production Scheduler who will develop weekly and daily production plans from the Master Production Schedule. You will coordinate with Materials, Manufacturing, Quality, and Engineering to ensure materials are on site and production runs smoothly.

The role requires ERP/MRP experience and a proactive approach to meeting customer demand. Responsibilities include communicating schedule changes, maintaining ERP replenishment signals, and supporting changes to Scheduling and

Qualifications

  • Two-year degree in an appropriate field with 1–3 years material management experience in manufacturing
  • Mechanical and analytical ability required
  • If no 2-year degree, an additional 3 years related experience
  • Proficiency in Microsoft Office applications
  • MRP/ERP experience required; SAP preferred
  • APICS CPIM or CSCP certification preferred

Responsibilities

  • Create weekly and daily production schedules from the Master Production Schedule to minimize inventory and maximize productivity and service levels
  • Communicate schedule changes to production personnel clearly and promptly
  • Ensure schedule attainment, adherence, and inventory DOH meet plant performance measures
  • Collaborate with Materials Manager to maintain capacity requirements plan
  • Coordinate with Supplier Scheduling, Manufacturing, Quality, and Engineering to ensure timely materials availability
  • Maintain replenishment signals within the ERP system to ensure smooth material flow
  • Manage daily production support including setting priorities and resolving supply issues
  • Maintain effective cross-department communication and working relationships
  • Support ERP changes to Scheduling and Inventory Control processes
  • Participate in clear-to-build meetings to adjust the production schedule as needed
  • Perform other duties as assigned

Skills

Mechanical aptitude
Analytical thinking
MS Office
MRP/ERP experience
SAP
Related experience (if no 2-year deg)

Education

APICS CPIM or CSCP
Two-year degree in material management/related field

Tools

SAP

Job description

At Bosch, we shape the future by inventing high-quality technologies and services that spark
enthusiasm and enrich people’s lives. Our areas of activity are every bit as diverse as our outstanding
Bosch teams around the world. Their creativity is the key to innovation through connected living,
mobility, or industry.

  • Reinvent yourself:At Bosch, you will evolve
  • Discover new directions:At Bosch, you will find your place
  • Celebrate success:At Bosch, we celebrate you
  • Shape tomorrow:At Bosch, you change lives
Job Description
  • Using the output of the Master Production Schedule (MPS), create weekly and daily production schedules which result in production plans that minimize inventory investment, maximize productivity, and maximize customer service levels.
  • Provides timely, complete, and concise communication to production personnel regarding schedule changes or revisions that have immediate or long-range impact.
  • Ensures that schedule attainment, adherence, and Inventory DOH are met in accordance with plant level performance measures.
  • Collaborate with Materials Manager to maintain capacity requirements plan that supports the master schedule.
  • Coordinates with Supplier Scheduling, Manufacturing, Quality, and Engineering to assure that materials are on site in a timely manner to facilitate speedy and accurate parts availability to meet customer demands.
  • Maintains replenishment signals within the ERP system for manufactured items to assure a smooth flow of materials and enable operational efficiency.
  • Manages daily support of production needs such as setting priorities and addressing supply issues.
  • Maintains effective working relationship and communication with all departments.
  • Support changes of Scheduling and Inventory Control processes required for ERP
  • Participate in the clear-to-build meetings adjusting the production schedule where necessary.
  • Other Duties as assigned.
Qualifications
  • This position requires a two-year degree in an appropriate field of study with one (1) to three (3) years material management experience in a manufacturing environment.
  • Normal mechanical and analytical ability is a must.
  • In the absence of a 2-year degree in an appropriate field of study, this position requires an additional three (3) years of related experience.
  • Proficiency in Microsoft Suite Applications
  • Extended knowledge of MRP and ERP experience required. (SAP Preferred)
  • APICS Certification in CPIM, or CSCP Preferred.
Additional Information

Indefinite U.S. work authorized individuals only. Future sponsorship for work authorization is not available.

*Bosch adheres to Federal, State, and Local laws regarding drug-testing. Employment is contingent upon the successful completion of a drug screen and background check. Candidates who have been offered the position must pass both screenings before their start date.

Your well-being matters at Bosch! We offer a competitive compensation and a benefits package designed to empower you in every area of your life. This includes premium health coverage, a 401(k) with generous matching, resources for financial planning and goal setting, ample paid time off, parental leave, and comprehensive life and disability protection. We're investing in your success!

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Fabrication Planner- Weekend 1st Shift
Fabrication Planner- Weekend 1st Shift

Bosch • Norman (OK)

On-site
USD 65,000 - 85,000
Fabrication Planner- Weekend 1st Shift
Fabrication Planner- Weekend 1st Shift

Bosch-HomeComfort • Norman (OK)

On-site
USD 65,000 - 90,000
Production Supervisor II
Production Supervisor II

Home Comfort Group • Wichita (KS)

Hybrid
USD 65,000 - 90,000
Premium health coverage
401(k) with generous matching
Paid time off
+2
Material Planner
Material Planner

Robert Bosch Group • Albion (IN)

On-site
USD 65,000 - 90,000
Health insurance
401(k) with company match
Paid time off
+2
Logistics Specialist - focus on Make and Deliver planning
Logistics Specialist - focus on Make and Deliver planning

Bosch USA • Anderson (SC)

On-site
USD 60,000 - 95,000
Advanced Material Handler - 2nd shift
Advanced Material Handler - 2nd shift

Bosch Homecomfort • Park City (KS)

On-site
USD 32,000 - 42,000
Premium health coverage
401(k) with generous matching
Paid time off
+2
Material Planner
Material Planner

Bosch • Pineville (NC)

On-site
USD 65,000 - 90,000
Health insurance
401(k) plan
Paid time off
+2
Material Planner
Material Planner

Robert Bosch Group • Pineville (NC)

On-site
USD 65,000 - 90,000
Health coverage
401(k) with generous matching
Paid time off
+2
Production Supervisor II (2nd Shift)
Production Supervisor II (2nd Shift)

Home Comfort Group • Wichita (KS)

Hybrid
USD 65,000 - 90,000
8% Second shift differential pay
Weekend Fabrication Planner — 1st Shift
Weekend Fabrication Planner — 1st Shift

Bosch Homecomfort • Norman (OK)

On-site
USD 65,000 - 90,000