Project Scheduler/Planner – Underground Execution

Ivanhoe Electric

Casa Grande (AZ)

On-site

USD 80,000 - 100,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

A mining company is seeking an Exploration Technician Project Scheduler/Planner for its underground operations. The role involves consolidating and maintaining detailed underground development schedules, ensuring they are execution-ready and reflect realistic sequencing. A minimum of 5 years' experience in mining or construction is required, along with expertise in Deswik and Primavera P6. The position is full-time and site-based, with responsibilities in safety integration and progress forecasting.

Qualifications

  • Minimum 5+ years’ experience scheduling underground mine development activities.
  • Demonstrated experience working with Deswik schedules at L4–L6 detail.
  • Strong working knowledge of Primavera P6 (PPM) in multi-contractor environments.

Responsibilities

  • Ensure underground development schedules reflect realistic sequencing and safety-critical activities.
  • Validate alignment between mine design and execution logic.
  • Produce one-week and three-week look-ahead schedules for underground execution.

Skills

Scheduling underground mine development activities
Using Deswik schedules
Knowledge of Primavera P6 (PPM)
Interpreting mine plans
Identifying schedule risks

Education

Background in mining engineering, mine planning, or construction management

Tools

Primavera P6
Deswik

Job description

Exploration Technician Project Scheduler / Planner – Underground Execution

Ivanhoe Electric is advancing the Santa Cruz Copper Project into underground development and execution using an Integrated Project Delivery (IPD) model. Underground contractors and IPD partners develop detailed schedules in Deswik, which must be consolidated, validated, and translated into a coherent execution view within Primavera P6 (PPM). A separate Master Scheduler exists at the project level. This role serves as the underground schedule integrator, ensuring detailed underground development schedules (L4–L6) are execution‑ready, internally consistent, and appropriately escalated for incorporation into the master project schedule.

Role Purpose

The Project Scheduler / Planner is responsible for consolidating, validating, and maintaining underground development schedules at Level 4 through Level 6 detail. The role provides schedule integrity, short‑interval execution visibility, and forward‑looking analysis to Mine Engineering and Construction leadership. Schedule recommendations and scenario analysis flow through the Mine Engineering team to the Director of Construction, who approves outcomes for incorporation into the master schedule.

Specific Responsibilities / Essential Functions

Underground Execution and Safety Integration

• Ensure underground development schedules reflect realistic sequencing, access constraints, and safety‑critical activities.

• Validate alignment between mine design, development headings, production rates, and execution logic.

• Consolidate contractor and IPD partner underground schedules developed in Deswik into Primavera P6 (PPM).

• Maintain detailed L4–L6 activities, including development headings, cycles, and work fronts.

• Validate logic integrity, calendars, constraints, and coding prior to schedule acceptance.

Progress Measurement and Forecasting

• Administer regular schedule updates, including physical percent complete and short‑interval forecast revisions.

• Compare contractor‑reported progress against Deswik outputs, P6 logic, and field observations.

• Identify schedule risks, logic conflicts, and emerging execution trends impacting underground development.

Look‑Ahead Planning and Reporting

• Produce one‑week and three‑week look‑ahead schedules supporting underground execution.

• Develop underground‑focused dashboards and critical path summaries for Mine Engineering and Construction leadership.

• Highlight impacts to development rates, resource availability, and sequencing.

Interfaces and Decision Support

• Work closely with Mine Engineering to evaluate sequencing options and execution scenarios.

• Provide validated underground schedule inputs to the Master Scheduler for integration into the master project schedule.

• Support the Director of Construction with schedule‑driven analysis for execution decisions.

Systems and Information Management

• Maintain scheduling data in Primavera P6 (PPM) in accordance with project standards.

• Ensure Deswik‑to‑P6 data exchanges are controlled, traceable, and auditable.

• Store and manage schedule files, updates, and reports within SharePoint document control.

• Support future integration with Business Central and other project systems as they are defined.

Preferred Skills, Knowledge, and Experience
Required

• Strong commitment to underground safety and disciplined execution.

• Minimum 5+ years’ experience scheduling underground mine development activities.

• Demonstrated experience working with Deswik schedules at L4–L6 detail.

• Strong working knowledge of Primavera P6 (PPM) in multi‑contractor environments.

• Ability to interpret mine plans, development designs, and contractor schedules.

• Proven ability to identify flawed logic, unrealistic durations, and execution risk embedded in schedules.

• Background in mining engineering, mine planning, or construction management.

• The capacity to interact with the entire team in a professional context is vital to ensure that all team members are contributing to the maintenance of an accurate and up‑to‑date schedule. One should be prepared to question the status quo or existing ideas when circumstances warrant.

Preferred

• Experience in IPD or Owner‑led delivery environments.

• Experience supporting short‑interval control or advanced underground execution planning.

Work Pattern

• Site‑based. Day shift at project outset.

• Flexibility to adapt to alternate shifts or expanded coverage as the project organization grows.

Seniority Level

Entry level

Employment Type

Full‑time

Job Function

Engineering and Information Technology

Industries

Mining

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Underground Execution Scheduler & Planner
Underground Execution Scheduler & Planner

Ivanhoe Electric • Casa Grande (AZ)

On-site
USD 80,000 - 100,000
Senior Planner / Scheduler
Senior Planner / Scheduler

Brunel • Detroit (MI)

On-site
USD 110,000 - 140,000
Planner Scheduler Manager
Planner Scheduler Manager

Brunel • Safford (AZ)

On-site
USD 120,000 - 150,000
PROJECT SCHEDULER – TUCSON
PROJECT SCHEDULER – TUCSON

M3 Engineering & Technology Corp. • Tucson (AZ)

On-site
USD 65,000 - 90,000
Project Scheduler
Project Scheduler

swipejobs • Houston (TX)

Hybrid
USD 80,000 - 100,000
Planner / Scheduler III
Planner / Scheduler III

TPI Global Solutions • Houston (TX)

On-site
USD 90,000 - 130,000
Planner Scheduler I
Planner Scheduler I

Bay Ltd. • Corpus Christi (TX)

On-site
USD 70,000 - 100,000
Equal Opportunity Employer
Project Scheduler
Project Scheduler

Vaco • Chicago (IL)

On-site
USD 90,000 - 130,000
Project Scheduler
Project Scheduler

Insight Global • Akron (OH)

On-site
USD 100,000 - 140,000
Project Scheduler — Underground Utilities (P6)
Project Scheduler — Underground Utilities (P6)

Michels Corporation • Itasca (TX)

On-site
USD 65,000 - 90,000
Health Insurance
Dental Insurance
Life Insurance
+2