Erhalte eine Antwort von diesem Arbeitgeber — ein Lebenslauf und ein Anschreiben, die genau auf die Eigenschaften eingehen, die gesucht werden.
Sound Transit seeks an Executive Project Director for the Series 3 Light Rail Vehicle Program in Seattle, WA. You will provide executive leadership across procurement, design review, manufacturing oversight, testing, and acceptance, ensuring operational readiness and integration into the regional system.
You will direct budget, schedule, risk, safety, and contract administration, while engaging with manufacturers, regulators, and industry partners to deliver a safe, reliable and future-ready
If you are a job seeker with a disability and require a reasonable accommodation to apply for one of our jobs, you will find the contact information to request the appropriate accommodation by visiting the following our Accessibility Accomodation for Applicants page.
Showing 1 location
Seattle, WA 98104, USA
Salary range is $157K to $297K with a midpoint of $227K. New hires typically receive between minimum and midpoint, however, we may go slightly higher based on experience, internal equity and market.
Sound Transit also offers a competitive benefits package with a wide range of offerings, including:
GENERAL PURPOSE:
Under the direction of Executive Director of Infrastructure and Asset Management (IAM), the Executive Project Director – Series 3 Light Rail Vehicles provides executive leadership, strategic direction, and overall accountability for Sound Transit’s Series 3 Light Rail Vehicle Program, including procurement, design review, manufacturing oversight, testing, commissioning, acceptance, operational readiness, and integration into the regional light rail system. The role is responsible for planning, directing, managing, and overseeing all phases of the Agency’s next-generation light rail vehicle acquisition program and associated supporting initiatives required to successfully expand and sustain Sound Transit’s growing Link light rail network. The Executive Project Director serves as the Agency’s executive lead for the Series 3 Light Rail Vehicle Program and is accountable for program scope, budget, schedule, quality, safety, risk management, contract administration, supplier performance, vehicle acceptance, and operational integration. The role takes strategic direction from the Executive Director – IAM and directs the development and implementation of plans that are consistent with the strategic direction to ensure the successful delivery of safe, reliable, maintainable, and customer-focused vehicles that support Sound Transit’s long-term service expansion, operational performance, and asset management objectives. The role consults with the Executive Director – IAM and serves as the Project Director/Manager for the Series 3 LRV program and primary liaison with vehicle manufacturers, consultants, regulatory agencies, industry partners, and other stakeholders and provides strategic inputs, recommendations, and decision support to executive leadership regarding fleet expansion, vehicle technology, risk mitigation, operational readiness, and long-range fleet investment strategies. The position supports agency-wide strategic priorities and plays a critical role in advancing Sound Transit’s ST3 expansion program through delivery of a reliable, sustainable, and future-ready vehicle fleet.
ESSENTIAL FUNCTIONS:
The following duties are a representative summary of the primary duties and responsibilities. Incumbent(s) may not be required to perform all duties listed and may be required to perform additional, position-specific duties.